M11 northbound Jct 8 exit slip road lane 2 closure
PlannedM11 northbound Jct 8 exit slip road lane 2 closure
- Start time
- Thu, May 7, 2026 8:00 PM
- Expected end
- Fri, May 8, 2026 4:00 AM
- Duration
- 8 hours
- Road
- M11 – M11 Northbound Between J7A And J8
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 3 lanes affected, 1 of 2 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, May 7, 2026 12:43 AM
- Last updated
- Thu, May 7, 2026 6:23 PM
- Cleared
- Fri, May 8, 2026 4:00 AM
- Latest update: M11 northbound Jct 8 exit slip road lane 2 closure
- Coordinates
- 51.867896, 0.195900
- Latitude span
- 51.862838 – 51.871243
- Longitude span
- 0.192088 – 0.198005
- Bounding box centre
- 51.867041, 0.195047
- Location descriptions
-
- M11 northbound between J7A and J8
- M11 J8 northbound exit
- Feed validity status
- Planned
- Overall feed start
- Thu, May 7, 2026 8:00 PM
- Overall feed end
- Fri, May 8, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M11 northbound between J7A and J8
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M11
- Linear Element Model
- The Network Model
- Linear Element Id
- {81819C7C-081B-4544-A831-AC4D723D85D2}
- Linear Element Type
- A Carriageway
- From Distance
- 87 m
- To Distance
- 325 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.862838 0.192088 51.863273 0.192513 51.864007 0.193173 51.864708 0.193759
Segment 2
14 coordinate pairs- Description
- M11 J8 northbound exit
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M11
- Linear Element Model
- The Network Model
- Linear Element Id
- {E804D6FA-33FD-4CBC-AF4A-A6C04290053F}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 787 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.864708 0.193759 51.866213 0.194863 51.866935 0.195364 51.867256 0.195583 51.867541 0.195787 51.868359 0.196366 51.870023 0.19749 51.870361 0.197695 51.870715 0.197906 51.87084 0.197973 51.870911 0.198004 51.871036 0.198005 51.871154 0.197959 51.871243 0.197915
- Geometry type
- MultiLineString
- Geometry points
- 18
- First coordinate pair
- 0.192088, 51.862838
- Road section segments
- 1
- Road section points
- 18
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.192088,
51.862838
],
[
0.192513,
51.863273
],
[
0.193173,
51.864007
],
[
0.193759,
51.864708
],
[
0.193759,
51.864708
],
[
0.194863,
51.866213
],
[
0.195364,
51.866935
],
[
0.195583,
51.867256
],
[
0.195787,
51.867541
],
[
0.196366,
51.868359
],
[
0.19749,
51.870023
],
[
0.197695,
51.870361
],
[
0.197906,
51.870715
],
[
0.197973,
51.87084
],
[
0.198004,
51.870911
],
[
0.198005,
51.871036
],
[
0.197959,
51.871154
],
[
0.197915,
51.871243
]
]
]
}
View road section coordinates
[
[
[
0.192088,
51.862838
],
[
0.192513,
51.863273
],
[
0.193173,
51.864007
],
[
0.193759,
51.864708
],
[
0.193759,
51.864708
],
[
0.194863,
51.866213
],
[
0.195364,
51.866935
],
[
0.195583,
51.867256
],
[
0.195787,
51.867541
],
[
0.196366,
51.868359
],
[
0.19749,
51.870023
],
[
0.197695,
51.870361
],
[
0.197906,
51.870715
],
[
0.197973,
51.87084
],
[
0.198004,
51.870911
],
[
0.198005,
51.871036
],
[
0.197959,
51.871154
],
[
0.197915,
51.871243
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, May 7, 2026 12:43 AM
- Record versioned
- Thu, May 7, 2026 6:23 PM
- Coordinate source
- Geometry
Related incidents
M11 northbound Jct 7 to Jct 7A carriageway closure
Planned National HighwaysM11 northbound Jct 7 to Jct 7A carriageway closure
M11 northbound Jct 11 exit slip road closure
Planned National HighwaysM11 northbound Jct 11 exit slip road closure
M11 southbound Jct 11 exit slip road lane 2 closure
Planned National HighwaysM11 southbound Jct 11 exit slip road lane 2 closure
M11 southbound Jct 11 exit slip road lane 2 closure
Planned National HighwaysM11 southbound Jct 11 exit slip road lane 2 closure
M11 northbound Jct 11 exit slip road closure
Planned National HighwaysM11 northbound Jct 11 exit slip road closure
M11 Northbound Jct 6 exit slip road lane 1 closure
Cleared National HighwaysM11 Northbound Jct 6 exit slip road lane 1 closure