M1 northbound Jct 26 entry slip road closure
ClearedM1 northbound Jct 26 entry slip road closure
- Start time
- Mon, Oct 12, 2026 7:12 PM
- Expected end
- Tue, Oct 13, 2026 5:00 AM
- Duration
- 8 hours 18 minutes 2 seconds
- Category
- Road Maintenance
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 12, 2026 7:12 PM
- Last updated
- Tue, Oct 13, 2026 3:13 AM
- Cleared
- Tue, Oct 13, 2026 3:30 AM
- Latest update: M1 northbound Jct 26 entry slip road closure
- Feed validity status
- Active
- Overall feed start
- Mon, Oct 12, 2026 7:12 PM
- Overall feed end
- Tue, Oct 13, 2026 5:00 AM
- Feed window length
- 9 hours 48 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Oct 12, 2026 7:12 PM
- Record versioned
- Tue, Oct 13, 2026 3:13 AM
Related incidents
A13 Eastbound Stifford Interchange to Baker Street lane 1,2 closure
Active Roadworks National HighwaysExpected to clear in 17 minutes 52 seconds
A13 Eastbound Stifford Interchange to Baker Street lane 1,2 closure
M60 Clockwise lanes 1 and 2 closure (MP 38/1 to 40/3)
Planned Roadworks National HighwaysExpected to clear in 47 minutes 52 seconds
M60 Clockwise lanes 1 and 2 closure (MP 38/1 to 40/3)
Lane 2, 3 and 4 closure southbound
Planned Roadworks National HighwaysExpected to clear in 47 minutes 52 seconds
Lane 2, 3 and 4 closure southbound
A40 Eastbound Jct 1 exit slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 17 minutes 52 seconds
A40 Eastbound Jct 1 exit slip road lane 1 closure
A5 eastbound Malborough Way between slips carriageway closure
Planned Roadworks National HighwaysExpected to clear in 47 minutes 52 seconds
A5 eastbound Malborough Way between slips carriageway closure
M602 Eastbound lane 3 closure (MP 2/5 to 3/7)
Active Roadworks National HighwaysExpected to clear in 47 minutes 52 seconds
M602 Eastbound lane 3 closure (MP 2/5 to 3/7)