Lane 1 and 2 closure southbound
PlannedLane 1 and 2 closure southbound
- Start time
- Fri, Mar 6, 2026 9:00 PM
- Expected end
- Sat, Mar 7, 2026 6:00 AM
- Duration
- 9 hours
- Road
- M6 TOLL – M6 Toll Southbound Between T8 And T7
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Mar 6, 2026 8:36 PM
- Last updated
- Sat, Mar 7, 2026 12:00 AM
- Cleared
- Sat, Mar 7, 2026 6:00 AM
- Latest update: Lane 1 and 2 closure southbound
- Coordinates
- 52.671623, -2.027893
- Latitude span
- 52.669541 – 52.672600
- Longitude span
- -2.044872 – -2.016140
- Bounding box centre
- 52.671071, -2.030506
- Location descriptions
-
- M6 Toll southbound between T8 and T7
- Feed validity status
- Planned
- Overall feed start
- Fri, Mar 6, 2026 9:00 PM
- Overall feed end
- Sat, Mar 7, 2026 6:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M6 Toll southbound between T8 and T7
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6 TOLL
- Linear Element Model
- The Network Model
- Linear Element Id
- {1C6BFC46-E169-4C4F-8C6F-654A1BEB269C}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 13 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.672542 -2.019301 52.672551 -2.019101
Segment 2
4 coordinate pairs- Description
- M6 Toll southbound between T8 and T7
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6 TOLL
- Linear Element Model
- The Network Model
- Linear Element Id
- {63868065-C946-422C-B888-7B0B19C259BE}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 200 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.672551 -2.019101 52.672596 -2.018104 52.6726 -2.01709 52.672572 -2.01614
Segment 3
8 coordinate pairs- Description
- M6 Toll southbound between T8 and T7
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6 TOLL
- Linear Element Model
- The Network Model
- Linear Element Id
- {0A1F0571-6B0F-4667-B388-A2733E119167}
- Linear Element Type
- B Carriageway
- From Distance
- 115 m
- To Distance
- 680 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.669541 -2.044872 52.66956 -2.044826 52.670212 -2.042668 52.670624 -2.040555 52.67081 -2.039008 52.670828 -2.038738 52.670884 -2.038153 52.670945 -2.036929
Segment 4
15 coordinate pairs- Description
- M6 Toll southbound between T8 and T7
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6 TOLL
- Linear Element Model
- The Network Model
- Linear Element Id
- {9888A584-0289-4E40-B4D1-C9FC038E7196}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 1,208 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.670945 -2.036929 52.671125 -2.031006 52.671125 -2.030997 52.671378 -2.028196 52.671476 -2.027309 52.671796 -2.025091 52.671824 -2.024898 52.671972 -2.023894 52.672077 -2.023175 52.672204 -2.022375 52.672292 -2.021662 52.672451 -2.020341 52.672522 -2.01962 52.672532 -2.019513 52.672542 -2.019301
- Geometry type
- MultiLineString
- Geometry points
- 29
- First coordinate pair
- -2.019301, 52.672542
- Road section segments
- 1
- Road section points
- 29
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.019301,
52.672542
],
[
-2.019101,
52.672551
],
[
-2.019101,
52.672551
],
[
-2.018104,
52.672596
],
[
-2.01709,
52.6726
],
[
-2.01614,
52.672572
],
[
-2.044872,
52.669541
],
[
-2.044826,
52.66956
],
[
-2.042668,
52.670212
],
[
-2.040555,
52.670624
],
[
-2.039008,
52.67081
],
[
-2.038738,
52.670828
],
[
-2.038153,
52.670884
],
[
-2.036929,
52.670945
],
[
-2.036929,
52.670945
],
[
-2.031006,
52.671125
],
[
-2.030997,
52.671125
],
[
-2.028196,
52.671378
],
[
-2.027309,
52.671476
],
[
-2.025091,
52.671796
],
[
-2.024898,
52.671824
],
[
-2.023894,
52.671972
],
[
-2.023175,
52.672077
],
[
-2.022375,
52.672204
],
[
-2.021662,
52.672292
],
[
-2.020341,
52.672451
],
[
-2.01962,
52.672522
],
[
-2.019513,
52.672532
],
[
-2.019301,
52.672542
]
]
]
}
View road section coordinates
[
[
[
-2.019301,
52.672542
],
[
-2.019101,
52.672551
],
[
-2.019101,
52.672551
],
[
-2.018104,
52.672596
],
[
-2.01709,
52.6726
],
[
-2.01614,
52.672572
],
[
-2.044872,
52.669541
],
[
-2.044826,
52.66956
],
[
-2.042668,
52.670212
],
[
-2.040555,
52.670624
],
[
-2.039008,
52.67081
],
[
-2.038738,
52.670828
],
[
-2.038153,
52.670884
],
[
-2.036929,
52.670945
],
[
-2.036929,
52.670945
],
[
-2.031006,
52.671125
],
[
-2.030997,
52.671125
],
[
-2.028196,
52.671378
],
[
-2.027309,
52.671476
],
[
-2.025091,
52.671796
],
[
-2.024898,
52.671824
],
[
-2.023894,
52.671972
],
[
-2.023175,
52.672077
],
[
-2.022375,
52.672204
],
[
-2.021662,
52.672292
],
[
-2.020341,
52.672451
],
[
-2.01962,
52.672522
],
[
-2.019513,
52.672532
],
[
-2.019301,
52.672542
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Mar 6, 2026 8:36 PM
- Record versioned
- Sat, Mar 7, 2026 12:00 AM
- Coordinate source
- Geometry
Related incidents
T8 southbound entry slip road closure
Planned National HighwaysT8 southbound entry slip road closure
Longford roundabout lane 1 closure both directions
Planned National HighwaysLongford roundabout lane 1 closure both directions
Lane 1 and 2 closure southbound
Cleared National HighwaysLane 1 and 2 closure southbound
Lane 1 and 2 closure southbound
Planned National HighwaysLane 1 and 2 closure southbound
Lane 1 and 2 closure southbound
Planned National HighwaysLane 1 and 2 closure southbound
Lane 1 and 2 closure southbound
Planned National HighwaysLane 1 and 2 closure southbound