A27 eastbound lane 2 lane 3 closure including ring management (Ashcombe roundabout)

Planned

A27 eastbound lane 2 lane 3 closure including ring management (Ashcombe roundabout)

Start time
Tue, May 12, 2026 7:00 PM
Expected end
Wed, May 13, 2026 5:00 AM
Duration
10 hours
Road
A27 – A27 Eastbound Between B2123 And A277
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Reason
Roadworks
Active
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, May 12, 2026 3:41 AM
Last updated
Tue, May 12, 2026 6:48 AM
Cleared
Wed, May 13, 2026 5:00 AM
  • Latest update: A27 eastbound lane 2 lane 3 closure including ring management (Ashcombe roundabout)
Coordinates
50.866769, -0.026737
Latitude span
50.866088 – 50.867116
Longitude span
-0.033932 – -0.023276
Bounding box centre
50.866602, -0.028604
Location descriptions
  • A27 eastbound between B2123 and A277
Feed validity status
Planned
Overall feed start
Tue, May 12, 2026 7:00 PM
Overall feed end
Wed, May 13, 2026 5:00 AM
Feed window length
10 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

10 coordinate pairs
Description
A27 eastbound between B2123 and A277
Carriageway
Dual Carriageway
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{C90619BE-8007-4C1E-9674-F4D250EF5E89}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
426 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.866547 -0.029252
50.866573 -0.028971
50.866841 -0.026055
50.866861 -0.025769
50.866893 -0.025288
50.867006 -0.023735
50.867034 -0.023498
50.867081 -0.023365
50.867098 -0.023317
50.867116 -0.023276

Segment 2

4 coordinate pairs
Description
A27 eastbound between B2123 and A277
Carriageway
Dual Carriageway
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{959D198F-B26F-46EA-B7CA-029D6D9AEB0F}
Linear Element Type
A Carriageway
From Distance
1,219 m
To Distance
1,553 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.866088 -0.033932
50.866539 -0.029335
50.866546 -0.029266
50.866547 -0.029252
Geometry type
MultiLineString
Geometry points
14
First coordinate pair
-0.029252, 50.866547
Road section segments
1
Road section points
14
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.029252,
                50.866547
            ],
            [
                -0.028971,
                50.866573
            ],
            [
                -0.026055,
                50.866841
            ],
            [
                -0.025769,
                50.866861
            ],
            [
                -0.025288,
                50.866893
            ],
            [
                -0.023735,
                50.867006
            ],
            [
                -0.023498,
                50.867034
            ],
            [
                -0.023365,
                50.867081
            ],
            [
                -0.023317,
                50.867098
            ],
            [
                -0.023276,
                50.867116
            ],
            [
                -0.033932,
                50.866088
            ],
            [
                -0.029335,
                50.866539
            ],
            [
                -0.029266,
                50.866546
            ],
            [
                -0.029252,
                50.866547
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.029252,
            50.866547
        ],
        [
            -0.028971,
            50.866573
        ],
        [
            -0.026055,
            50.866841
        ],
        [
            -0.025769,
            50.866861
        ],
        [
            -0.025288,
            50.866893
        ],
        [
            -0.023735,
            50.867006
        ],
        [
            -0.023498,
            50.867034
        ],
        [
            -0.023365,
            50.867081
        ],
        [
            -0.023317,
            50.867098
        ],
        [
            -0.023276,
            50.867116
        ],
        [
            -0.033932,
            50.866088
        ],
        [
            -0.029335,
            50.866539
        ],
        [
            -0.029266,
            50.866546
        ],
        [
            -0.029252,
            50.866547
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Roadworks
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Tue, May 12, 2026 3:41 AM
Record versioned
Tue, May 12, 2026 6:48 AM
Coordinate source
Geometry

Related incidents

A27 eastbound lane 2 closure

Cleared National Highways
Brighton And Hove A27 · A27 Eastbound Within The B2123 Junction
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Planned National Highways
Chichester A27 · A27 Eastbound Between A259 Near Emsworth And A259 Near Chichester (West)
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound lane 2 closure

Cleared National Highways
Brighton And Hove A27 · A27 Eastbound Within The B2123 Junction
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Planned National Highways
Havant A27 · A27 Eastbound Between A3023 And A259 Near Emsworth
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Planned National Highways
Havant A27 · A27 Eastbound Between A3023 And A259 Near Emsworth
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound lane 2 closure

Planned National Highways
Bognor Regis A27 · A27 Eastbound Between A29 Near Bognor Regis (East) And A284 Near Arundel (West)
Starts 5 Jun 2026, 19:00 Expected 6 Jun 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update