A27 eastbound lane 1 closure (54/4 to 54/9)

Planned

A27 eastbound lane 1 closure (54/4 to 54/9)

Start time
Tue, Mar 31, 2026 7:00 PM
Expected end
Wed, Apr 1, 2026 5:00 AM
Duration
10 hours
Road
A27 – A27 Eastbound Within The A259 Near Emsworth Junction
Category
Construction Work
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 1 closed, 1 of 1 lanes affected
Reason
Construction Work
Active
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, Mar 31, 2026 1:07 AM
Last updated
Tue, Mar 31, 2026 5:58 PM
Cleared
Wed, Apr 1, 2026 5:00 AM
  • Latest update: A27 eastbound lane 1 closure (54/4 to 54/9)
Coordinates
50.850484, -0.961271
Latitude span
50.849423 – 50.852000
Longitude span
-0.963717 – -0.957941
Bounding box centre
50.850712, -0.960829
Location descriptions
  • A27 eastbound within the A259 near Emsworth junction
  • A27 eastbound between A259 near Emsworth and A259 near Chichester (west)
Feed validity status
Planned
Overall feed start
Tue, Mar 31, 2026 7:00 PM
Overall feed end
Wed, Apr 1, 2026 5:00 AM
Feed window length
10 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

7 coordinate pairs
Description
A27 eastbound within the A259 near Emsworth junction
Carriageway
Dual Carriageway
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start2 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{53298CC5-70AE-48E5-B03D-FFEEEB0B1565}
Linear Element Type
A Carriageway
From Distance
97 m
To Distance
310 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.849423 -0.963717
50.849517 -0.963463
50.849544 -0.963391
50.849772 -0.962804
50.850106 -0.962001
50.850239 -0.961714
50.850495 -0.961211

Segment 2

6 coordinate pairs
Description
A27 eastbound between A259 near Emsworth and A259 near Chichester (west)
Carriageway
Dual Carriageway
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End2
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{209ADA10-3346-45A6-89E9-F1A882499841}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
284 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.850495 -0.961211
50.850686 -0.960809
50.850945 -0.960262
50.851298 -0.959517
50.851766 -0.958484
50.852 -0.957941
Geometry type
MultiLineString
Geometry points
13
First coordinate pair
-0.963717, 50.849423
Road section segments
1
Road section points
13
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.963717,
                50.849423
            ],
            [
                -0.963463,
                50.849517
            ],
            [
                -0.963391,
                50.849544
            ],
            [
                -0.962804,
                50.849772
            ],
            [
                -0.962001,
                50.850106
            ],
            [
                -0.961714,
                50.850239
            ],
            [
                -0.961211,
                50.850495
            ],
            [
                -0.961211,
                50.850495
            ],
            [
                -0.960809,
                50.850686
            ],
            [
                -0.960262,
                50.850945
            ],
            [
                -0.959517,
                50.851298
            ],
            [
                -0.958484,
                50.851766
            ],
            [
                -0.957941,
                50.852
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.963717,
            50.849423
        ],
        [
            -0.963463,
            50.849517
        ],
        [
            -0.963391,
            50.849544
        ],
        [
            -0.962804,
            50.849772
        ],
        [
            -0.962001,
            50.850106
        ],
        [
            -0.961714,
            50.850239
        ],
        [
            -0.961211,
            50.850495
        ],
        [
            -0.961211,
            50.850495
        ],
        [
            -0.960809,
            50.850686
        ],
        [
            -0.960262,
            50.850945
        ],
        [
            -0.959517,
            50.851298
        ],
        [
            -0.958484,
            50.851766
        ],
        [
            -0.957941,
            50.852
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Construction Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed region label
Emsworth junction
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Tue, Mar 31, 2026 1:07 AM
Record versioned
Tue, Mar 31, 2026 5:58 PM
Coordinate source
Geometry

Related incidents

A27 eastbound lane 2 closure

Cleared National Highways
Brighton And Hove A27 · A27 Eastbound Within The B2123 Junction
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Planned National Highways
Chichester A27 · A27 Eastbound Between A259 Near Emsworth And A259 Near Chichester (West)
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound lane 2 closure

Cleared National Highways
Brighton And Hove A27 · A27 Eastbound Within The B2123 Junction
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Planned National Highways
Havant A27 · A27 Eastbound Between A3023 And A259 Near Emsworth
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Planned National Highways
Havant A27 · A27 Eastbound Between A3023 And A259 Near Emsworth
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound lane 2 closure

Planned National Highways
Bognor Regis A27 · A27 Eastbound Between A29 Near Bognor Regis (East) And A284 Near Arundel (West)
Starts 5 Jun 2026, 19:00 Expected 6 Jun 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update