A1M Jct 56 Northbound entry slip road closure
ClearedA1M Jct 56 Northbound entry slip road closure
- Start time
- Thu, Oct 8, 2026 7:00 PM
- Expected end
- Fri, Oct 9, 2026 5:00 AM
- Duration
- 8 hours 30 minutes 2 seconds
- Category
- Road Maintenance
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 8, 2026 3:51 AM
- Last updated
- Fri, Oct 9, 2026 3:10 AM
- Cleared
- Fri, Oct 9, 2026 3:30 AM
- Latest update: A1M Jct 56 Northbound entry slip road closure
- Feed validity status
- Planned
- Overall feed start
- Thu, Oct 8, 2026 7:00 PM
- Overall feed end
- Fri, Oct 9, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 6
- Record created
- Thu, Oct 8, 2026 3:51 AM
- Record versioned
- Fri, Oct 9, 2026 3:10 AM
Related incidents
M40 Northbound, Jct 11 entry slip road closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 50 minutes
M40 Northbound, Jct 11 entry slip road closure
M1 southbound Approach to Jct 9 lane 1 closure (MP 46/5 to 45/7)
Active Roadworks National HighwaysExpected to clear in 50 minutes 52 seconds
M1 southbound Approach to Jct 9 lane 1 closure (MP 46/5 to 45/7)
M5 northbound Jct 10 entry slip road closed
Active Roadworks National HighwaysExpected to clear in 1 hour 50 minutes
M5 northbound Jct 10 entry slip road closed
A1 northbound Brampton Hut exit slip road closure
Active Roadworks National HighwaysExpected to clear in 50 minutes 52 seconds
A1 northbound Brampton Hut exit slip road closure
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
Planned Roadworks National HighwaysExpected to clear in 1 hour 50 minutes
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
M65 eastbound lane 2 and 3 closure (MP 26/7 to 28/8)
Planned Roadworks National HighwaysExpected to clear in 50 minutes 52 seconds
M65 eastbound lane 2 and 3 closure (MP 26/7 to 28/8)