A19 Howden Interchange Northbound entry Slip Road Closure
ClearedA19 Howden Interchange Northbound entry Slip Road Closure
- Start time
- Thu, Sep 24, 2026 7:00 PM
- Expected end
- Fri, Sep 25, 2026 5:00 AM
- Duration
- 9 hours 20 minutes 1 second
- Category
- Road Maintenance
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 1, 2026 10:21 AM
- Last updated
- Fri, Sep 25, 2026 3:49 AM
- Cleared
- Fri, Sep 25, 2026 4:20 AM
- Latest update: A19 Howden Interchange Northbound entry Slip Road Closure
- Feed validity status
- Planned
- Overall feed start
- Thu, Sep 24, 2026 7:00 PM
- Overall feed end
- Fri, Sep 25, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Sep 1, 2026 10:21 AM
- Record versioned
- Fri, Sep 25, 2026 3:49 AM
Related incidents
M58 Eastbound Jct 3 exit slip road closure
Planned Roadworks National HighwaysExpected to clear in 51 minutes 42 seconds
M58 Eastbound Jct 3 exit slip road closure
M60 Clockwise lanes 1 and 2 closure (MP 38/1 to 40/3)
Planned Roadworks National HighwaysExpected to clear in 51 minutes 42 seconds
M60 Clockwise lanes 1 and 2 closure (MP 38/1 to 40/3)
Lane 2, 3 and 4 closure southbound
Planned Roadworks National HighwaysExpected to clear in 51 minutes 42 seconds
Lane 2, 3 and 4 closure southbound
A40 Eastbound Jct 1 exit slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 21 minutes 42 seconds
A40 Eastbound Jct 1 exit slip road lane 1 closure
M65 Eastbound Jct 5 entry slip road closure
Planned Roadworks National HighwaysExpected to clear in 51 minutes 42 seconds
M65 Eastbound Jct 5 entry slip road closure
M6 southbound Jct 16 to Jct 15 carriageway closure
Planned Roadworks National HighwaysExpected to clear in 51 minutes 42 seconds
M6 southbound Jct 16 to Jct 15 carriageway closure