A14 westbound layby closure
PlannedA14 westbound layby closure
- Start time
- Tue, Oct 7, 2025 12:00 PM
- Expected end
- Wed, Oct 8, 2025 5:00 AM
- Duration
- 17 hours
- Road
- A14 – A14 Westbound Between J1 And M1/M6
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Oct 7, 2025 2:46 AM
- Last updated
- Tue, Oct 7, 2025 8:36 AM
- Cleared
- Wed, Oct 8, 2025 5:00 AM
- Latest update: A14 westbound layby closure
- Coordinates
- 52.395355, -1.046644
- Latitude span
- 52.395098 – 52.395800
- Longitude span
- -1.048761 – -1.045024
- Bounding box centre
- 52.395449, -1.046893
- Location descriptions
-
- A14 westbound between J1 and M1/M6
- Layby at A14 westbound between J1 and M1/M6
- Feed validity status
- Planned
- Overall feed start
- Tue, Oct 7, 2025 12:00 PM
- Overall feed end
- Wed, Oct 8, 2025 5:00 AM
- Feed window length
- 17 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- A14 westbound between J1 and M1/M6
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {A29AE3F4-EDF4-4D8C-BFCC-979738BF601B}
- Linear Element Type
- B Carriageway
- From Distance
- 575 m
- To Distance
- 626 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.395098 -1.045024 52.395144 -1.045319 52.395219 -1.045744
Segment 2
9 coordinate pairs- Description
- Layby at A14 westbound between J1 and M1/M6
- Carriageway
- Lay By
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {AE361899-77FF-DBE8-B481-5A3184935A69}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 216 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.395219 -1.045744 52.395281 -1.046347 52.395293 -1.046461 52.395295 -1.046481 52.395308 -1.04655 52.395318 -1.046735 52.395582 -1.048057 52.395704 -1.048504 52.3958 -1.048761
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -1.045024, 52.395098
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.045024,
52.395098
],
[
-1.045319,
52.395144
],
[
-1.045744,
52.395219
],
[
-1.045744,
52.395219
],
[
-1.046347,
52.395281
],
[
-1.046461,
52.395293
],
[
-1.046481,
52.395295
],
[
-1.04655,
52.395308
],
[
-1.046735,
52.395318
],
[
-1.048057,
52.395582
],
[
-1.048504,
52.395704
],
[
-1.048761,
52.3958
]
]
]
}
View road section coordinates
[
[
[
-1.045024,
52.395098
],
[
-1.045319,
52.395144
],
[
-1.045744,
52.395219
],
[
-1.045744,
52.395219
],
[
-1.046347,
52.395281
],
[
-1.046461,
52.395293
],
[
-1.046481,
52.395295
],
[
-1.04655,
52.395308
],
[
-1.046735,
52.395318
],
[
-1.048057,
52.395582
],
[
-1.048504,
52.395704
],
[
-1.048761,
52.3958
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Tue, Oct 7, 2025 2:46 AM
- Record versioned
- Tue, Oct 7, 2025 8:36 AM
- Coordinate source
- Geometry
Related incidents
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
Planned National HighwaysA14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)