A14 eastbound Jct 57 to Jct 58 - lane 2 closure
PlannedA14 eastbound Jct 57 to Jct 58 - lane 2 closure
- Start time
- Fri, May 15, 2026 9:00 PM
- Expected end
- Sat, May 16, 2026 4:00 AM
- Duration
- 7 hours
- Road
- A14 – A14 Eastbound Between J57 And J58
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, May 14, 2026 11:15 AM
- Last updated
- Sat, May 16, 2026 3:21 AM
- Cleared
- Sat, May 16, 2026 4:00 AM
- Latest update: A14 eastbound Jct 57 to Jct 58 - lane 2 closure
- Coordinates
- 52.024769, 1.225835
- Latitude span
- 52.024157 – 52.025727
- Longitude span
- 1.217861 – 1.231668
- Bounding box centre
- 52.024942, 1.224765
- Location descriptions
-
- A14 eastbound between J57 and J58
- Feed validity status
- Planned
- Overall feed start
- Fri, May 15, 2026 9:00 PM
- Overall feed end
- Sat, May 16, 2026 4:00 AM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
15 coordinate pairs- Description
- A14 eastbound between J57 and J58
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {18C17FB2-B81A-4DA3-A4E2-034AD2C3C741}
- Linear Element Type
- A Carriageway
- From Distance
- 359 m
- To Distance
- 950 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.025727 1.217861 52.025711 1.218407 52.025672 1.219074 52.025652 1.219408 52.025639 1.219587 52.02561 1.219974 52.025557 1.220627 52.025437 1.221726 52.025298 1.222838 52.025224 1.2233 52.025141 1.223819 52.025002 1.224624 52.024782 1.225744 52.024679 1.226218 52.024669 1.226263
Segment 2
13 coordinate pairs- Description
- A14 eastbound between J57 and J58
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {887319E7-D773-4D02-BF17-B7649E70AB39}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 297 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.024439 1.227388 52.024412 1.227542 52.024311 1.228131 52.024245 1.228696 52.024207 1.22913 52.024179 1.229552 52.024157 1.230264 52.024163 1.230745 52.024165 1.230805 52.024175 1.23101 52.024185 1.231302 52.024212 1.231609 52.024218 1.231668
Segment 3
6 coordinate pairs- Description
- A14 eastbound between J57 and J58
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {0C87865F-ECF0-403E-94CF-8CA90C941330}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 81 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.024669 1.226263 52.024647 1.226363 52.024567 1.226716 52.024486 1.227121 52.024472 1.227209 52.024439 1.227388
- Geometry type
- MultiLineString
- Geometry points
- 34
- First coordinate pair
- 1.217861, 52.025727
- Road section segments
- 1
- Road section points
- 34
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
1.217861,
52.025727
],
[
1.218407,
52.025711
],
[
1.219074,
52.025672
],
[
1.219408,
52.025652
],
[
1.219587,
52.025639
],
[
1.219974,
52.02561
],
[
1.220627,
52.025557
],
[
1.221726,
52.025437
],
[
1.222838,
52.025298
],
[
1.2233,
52.025224
],
[
1.223819,
52.025141
],
[
1.224624,
52.025002
],
[
1.225744,
52.024782
],
[
1.226218,
52.024679
],
[
1.226263,
52.024669
],
[
1.227388,
52.024439
],
[
1.227542,
52.024412
],
[
1.228131,
52.024311
],
[
1.228696,
52.024245
],
[
1.22913,
52.024207
],
[
1.229552,
52.024179
],
[
1.230264,
52.024157
],
[
1.230745,
52.024163
],
[
1.230805,
52.024165
],
[
1.23101,
52.024175
],
[
1.231302,
52.024185
],
[
1.231609,
52.024212
],
[
1.231668,
52.024218
],
[
1.226263,
52.024669
],
[
1.226363,
52.024647
],
[
1.226716,
52.024567
],
[
1.227121,
52.024486
],
[
1.227209,
52.024472
],
[
1.227388,
52.024439
]
]
]
}
View road section coordinates
[
[
[
1.217861,
52.025727
],
[
1.218407,
52.025711
],
[
1.219074,
52.025672
],
[
1.219408,
52.025652
],
[
1.219587,
52.025639
],
[
1.219974,
52.02561
],
[
1.220627,
52.025557
],
[
1.221726,
52.025437
],
[
1.222838,
52.025298
],
[
1.2233,
52.025224
],
[
1.223819,
52.025141
],
[
1.224624,
52.025002
],
[
1.225744,
52.024782
],
[
1.226218,
52.024679
],
[
1.226263,
52.024669
],
[
1.227388,
52.024439
],
[
1.227542,
52.024412
],
[
1.228131,
52.024311
],
[
1.228696,
52.024245
],
[
1.22913,
52.024207
],
[
1.229552,
52.024179
],
[
1.230264,
52.024157
],
[
1.230745,
52.024163
],
[
1.230805,
52.024165
],
[
1.23101,
52.024175
],
[
1.231302,
52.024185
],
[
1.231609,
52.024212
],
[
1.231668,
52.024218
],
[
1.226263,
52.024669
],
[
1.226363,
52.024647
],
[
1.226716,
52.024567
],
[
1.227121,
52.024486
],
[
1.227209,
52.024472
],
[
1.227388,
52.024439
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, May 14, 2026 11:15 AM
- Record versioned
- Sat, May 16, 2026 3:21 AM
- Coordinate source
- Geometry
Related incidents
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
Planned National HighwaysA14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
Planned National HighwaysA14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
A14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)
Planned National HighwaysA14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)