M53 Southbound Jct 9 exit slip road closure

Cleared

M53 Southbound Jct 9 exit slip road closure

Start time
Fri, Jul 17, 2026 7:00 PM
Expected end
Sat, Jul 18, 2026 5:00 AM
Duration
2 seconds
Road
M53 – M53 J9 Southbound Exit
Category
Construction Work
Direction
Southbound
Reason
Road Improvement Or Upgrading
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, Jul 7, 2026 6:46 AM
Last updated
Fri, Jul 17, 2026 5:47 PM
Cleared
Fri, Jul 17, 2026 7:00 PM
  • Latest update: M53 Southbound Jct 9 exit slip road closure
Coordinates
53.288441, -2.896999
Latitude span
53.287847 – 53.289408
Longitude span
-2.899426 – -2.895442
Bounding box centre
53.288628, -2.897434
Location descriptions
  • M53 J9 southbound exit
Feed validity status
Planned
Overall feed start
Fri, Jul 17, 2026 7:00 PM
Overall feed end
Sat, Jul 18, 2026 5:00 AM
Feed window length
10 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

4 coordinate pairs
Description
M53 J9 southbound exit
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start2 End1
Linear Element Road
M53
Linear Element Model
The Network Model
Linear Element Id
{9BE5DED1-7491-414E-B68F-600193A6D7B9}
Linear Element Type
A Carriageway Exit Slip
From Distance
0 m
To Distance
125 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.288448 -2.897033
53.288404 -2.896912
53.287875 -2.895506
53.287847 -2.895442

Segment 2

3 coordinate pairs
Description
M53 J9 southbound exit
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End2
Linear Element Road
M53
Linear Element Model
The Network Model
Linear Element Id
{D35F21D1-F9B7-4FD6-8B2A-5E8D45DDC395}
Linear Element Type
A Carriageway Exit Slip
From Distance
0 m
To Distance
192 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.289408 -2.899426
53.288659 -2.897638
53.288448 -2.897033
Geometry type
MultiLineString
Geometry points
7
First coordinate pair
-2.897033, 53.288448
Road section segments
1
Road section points
7
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.897033,
                53.288448
            ],
            [
                -2.896912,
                53.288404
            ],
            [
                -2.895506,
                53.287875
            ],
            [
                -2.895442,
                53.287847
            ],
            [
                -2.899426,
                53.289408
            ],
            [
                -2.897638,
                53.288659
            ],
            [
                -2.897033,
                53.288448
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.897033,
            53.288448
        ],
        [
            -2.896912,
            53.288404
        ],
        [
            -2.895506,
            53.287875
        ],
        [
            -2.895442,
            53.287847
        ],
        [
            -2.899426,
            53.289408
        ],
        [
            -2.897638,
            53.288659
        ],
        [
            -2.897033,
            53.288448
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Road Improvement Or Upgrading
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
4
Record created
Tue, Jul 7, 2026 6:46 AM
Record versioned
Fri, Jul 17, 2026 5:47 PM
Coordinate source
Geometry

Driving on the M53? See every live closure, roadwork and planned restriction on this road.

M53 live closures

Related incidents

M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)

Active Roadworks National Highways
Cheshire West And Chester M56 · M56 Eastbound Within J14

Expected to clear in 5 hours 38 minutes

Started 1 Aug 2026, 21:42 Expected clear 2 Aug 2026, 05:00

M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)

Category: Road Maintenance
View update

M56 Eastbound hard shoulder closure (MP 55/0 to 54/6)

Active Roadworks National Highways
Cheshire West And Chester M56 · M56 Eastbound Between J15 And J14

Expected to clear in 3 days 23 hours

Started 5 Jul 2026, 23:00 Expected clear 5 Aug 2026, 23:01

M56 Eastbound hard shoulder closure (MP 55/0 to 54/6)

Category: Construction Work
View update

M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)

Cleared Roadworks National Highways
Cheshire West And Chester M56 · M56 Eastbound Within J14

Cleared 1 hour 6 minutes ago

Started 1 Aug 2026, 20:00 Ended 1 Aug 2026, 22:15

M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)

Category: Road Maintenance
View update

A55 Eastbound Jct 38 to 40 carriageway closure

Cleared Roadworks National Highways
Cheshire West And Chester A55 · A55 Eastbound Between A41 And A51

Cleared 21 hours 1 minute ago

Started 31 Jul 2026, 19:00 Ended 1 Aug 2026, 02:20

A55 Eastbound Jct 38 to 40 carriageway closure

Category: Road Maintenance
View update

M6 northbound lane 1 closure (MP 284/4 to 285/0)

Cleared Roadworks National Highways
Cheshire West And Chester M6 · M6 Northbound Between J18 And J19

Cleared 2 days 46 minutes ago

Started 30 Jul 2026, 20:50 Ended 30 Jul 2026, 22:35

M6 northbound lane 1 closure (MP 284/4 to 285/0)

Category: Road Maintenance
View update

M56 Eastbound lanes 2 and 3 closure (MP 47/5 to 42/9)

Cleared Roadworks National Highways
Cheshire West And Chester M56 · M56 Eastbound Between J14 And J12

Cleared 1 day 19 hours ago

Started 30 Jul 2026, 20:18 Ended 31 Jul 2026, 04:05

M56 Eastbound lanes 2 and 3 closure (MP 47/5 to 42/9)

Category: Road Maintenance
View update