M53 Southbound Jct 9 exit slip road closure
ClearedM53 Southbound Jct 9 exit slip road closure
- Start time
- Fri, Jul 17, 2026 7:00 PM
- Expected end
- Sat, Jul 18, 2026 5:00 AM
- Duration
- 2 seconds
- Road
- M53 – M53 J9 Southbound Exit
- Category
- Construction Work
- Direction
- Southbound
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 7, 2026 6:46 AM
- Last updated
- Fri, Jul 17, 2026 5:47 PM
- Cleared
- Fri, Jul 17, 2026 7:00 PM
- Latest update: M53 Southbound Jct 9 exit slip road closure
- Coordinates
- 53.288441, -2.896999
- Latitude span
- 53.287847 – 53.289408
- Longitude span
- -2.899426 – -2.895442
- Bounding box centre
- 53.288628, -2.897434
- Location descriptions
-
- M53 J9 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 17, 2026 7:00 PM
- Overall feed end
- Sat, Jul 18, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M53 J9 southbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {9BE5DED1-7491-414E-B68F-600193A6D7B9}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 125 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.288448 -2.897033 53.288404 -2.896912 53.287875 -2.895506 53.287847 -2.895442
Segment 2
3 coordinate pairs- Description
- M53 J9 southbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {D35F21D1-F9B7-4FD6-8B2A-5E8D45DDC395}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 192 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.289408 -2.899426 53.288659 -2.897638 53.288448 -2.897033
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -2.897033, 53.288448
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.897033,
53.288448
],
[
-2.896912,
53.288404
],
[
-2.895506,
53.287875
],
[
-2.895442,
53.287847
],
[
-2.899426,
53.289408
],
[
-2.897638,
53.288659
],
[
-2.897033,
53.288448
]
]
]
}
View road section coordinates
[
[
[
-2.897033,
53.288448
],
[
-2.896912,
53.288404
],
[
-2.895506,
53.287875
],
[
-2.895442,
53.287847
],
[
-2.899426,
53.289408
],
[
-2.897638,
53.288659
],
[
-2.897033,
53.288448
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Tue, Jul 7, 2026 6:46 AM
- Record versioned
- Fri, Jul 17, 2026 5:47 PM
- Coordinate source
- Geometry
Driving on the M53? See every live closure, roadwork and planned restriction on this road.
M53 live closuresRelated incidents
M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)
Active Roadworks National HighwaysExpected to clear in 5 hours 38 minutes
M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)
M56 Eastbound hard shoulder closure (MP 55/0 to 54/6)
Active Roadworks National HighwaysExpected to clear in 3 days 23 hours
M56 Eastbound hard shoulder closure (MP 55/0 to 54/6)
M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)
Cleared Roadworks National HighwaysCleared 1 hour 6 minutes ago
M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)
A55 Eastbound Jct 38 to 40 carriageway closure
Cleared Roadworks National HighwaysCleared 21 hours 1 minute ago
A55 Eastbound Jct 38 to 40 carriageway closure
M6 northbound lane 1 closure (MP 284/4 to 285/0)
Cleared Roadworks National HighwaysCleared 2 days 46 minutes ago
M6 northbound lane 1 closure (MP 284/4 to 285/0)
M56 Eastbound lanes 2 and 3 closure (MP 47/5 to 42/9)
Cleared Roadworks National HighwaysCleared 1 day 19 hours ago
M56 Eastbound lanes 2 and 3 closure (MP 47/5 to 42/9)