M53 Southbound Jct 6 exit slip road closure
ClearedM53 Southbound Jct 6 exit slip road closure
- Start time
- Sun, Oct 11, 2026 8:00 PM
- Expected end
- Mon, Oct 12, 2026 5:00 AM
- Duration
- 8 hours 20 minutes 2 seconds
- Road
- M53 – M53 J6 Southbound Exit
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Singlecarriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 12, 2026 2:25 AM
- Last updated
- Mon, Oct 12, 2026 4:00 AM
- Cleared
- Mon, Oct 12, 2026 4:20 AM
- Latest update: M53 Southbound Jct 6 exit slip road closure
- Coordinates
- 53.304165, -2.948796
- Latitude span
- 53.303815 – 53.304734
- Longitude span
- -2.950922 – -2.947362
- Bounding box centre
- 53.304275, -2.949142
- Location descriptions
-
- M53 J6 southbound exit
- M53 southbound between B5132 and J6
- Feed validity status
- Planned
- Overall feed start
- Sun, Oct 11, 2026 8:00 PM
- Overall feed end
- Mon, Oct 12, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
15 coordinate pairs- Description
- M53 J6 southbound exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {33F127D0-C027-4160-8192-0D1D31F1C2A6}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 96 m
- To Distance
- 341 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.303974 -2.950922 53.30388 -2.950481 53.303829 -2.950164 53.303815 -2.949833 53.303845 -2.949504 53.303883 -2.949249 53.303957 -2.948981 53.304003 -2.948817 53.304058 -2.948698 53.304113 -2.948564 53.304186 -2.948401 53.304426 -2.947911 53.304469 -2.947822 53.304499 -2.947697 53.304516 -2.947628
Segment 2
2 coordinate pairs- Description
- M53 southbound between B5132 and J6
- Carriageway
- Single Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Both
- Height Grade
- Start2 End1
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {62BA03C6-7A18-4750-863A-C89A714287CA}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 15 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.304734 -2.947362 53.304623 -2.947499
- Geometry type
- MultiLineString
- Geometry points
- 17
- First coordinate pair
- -2.950922, 53.303974
- Road section segments
- 1
- Road section points
- 17
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.950922,
53.303974
],
[
-2.950481,
53.30388
],
[
-2.950164,
53.303829
],
[
-2.949833,
53.303815
],
[
-2.949504,
53.303845
],
[
-2.949249,
53.303883
],
[
-2.948981,
53.303957
],
[
-2.948817,
53.304003
],
[
-2.948698,
53.304058
],
[
-2.948564,
53.304113
],
[
-2.948401,
53.304186
],
[
-2.947911,
53.304426
],
[
-2.947822,
53.304469
],
[
-2.947697,
53.304499
],
[
-2.947628,
53.304516
],
[
-2.947362,
53.304734
],
[
-2.947499,
53.304623
]
]
]
}
View road section coordinates
[
[
[
-2.950922,
53.303974
],
[
-2.950481,
53.30388
],
[
-2.950164,
53.303829
],
[
-2.949833,
53.303815
],
[
-2.949504,
53.303845
],
[
-2.949249,
53.303883
],
[
-2.948981,
53.303957
],
[
-2.948817,
53.304003
],
[
-2.948698,
53.304058
],
[
-2.948564,
53.304113
],
[
-2.948401,
53.304186
],
[
-2.947911,
53.304426
],
[
-2.947822,
53.304469
],
[
-2.947697,
53.304499
],
[
-2.947628,
53.304516
],
[
-2.947362,
53.304734
],
[
-2.947499,
53.304623
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 12, 2026 2:25 AM
- Record versioned
- Mon, Oct 12, 2026 4:00 AM
- Coordinate source
- Geometry
Driving on the M53? See every live closure, roadwork and planned restriction on this road.
M53 live closuresRelated incidents
M53 Northbound Jct 4 entry slip road lane closure
Planned Roadworks National HighwaysExpected to clear in 2 hours 38 minutes
M53 Northbound Jct 4 entry slip road lane closure
M53 southbound hard shoulder closure (MP 33/1 to 33/4)
Active Roadworks National HighwaysExpected to clear in 2 weeks 4 days
M53 southbound hard shoulder closure (MP 33/1 to 33/4)
A494 : Eastbound : A55 J33B Ewloe to Ewloe : Roadworks : Road closed : Diversions in place : 11/10/26-23/10/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A494 : Eastbound : A55 J33B Ewloe to Ewloe : Roadworks : Road closed : Diversions in place : 11/10/26-23/10/26 1900-0600 :, Start time: 11/10/2026 19:00 , End Date: 23/10/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 11/10/2026 19:00
A494 : Both directions : Ruthin : Improvement work : STOP/GO in use : Delays possible : 28/09/26-23/10/26 0900-1200 :
Active Roadworks Traffic WalesDescription: A494 : Both directions : Ruthin : Improvement work : STOP/GO in use : Delays possible : 28/09/26-23/10/26 0900-1200 :, Start time: 28/09/2026 9:00 , End Date: 23/10/2026 12:00, Severity: Moderate, Source: Welsh Government, Last updated: 28/09/2026 9:00
M53 Southbound lane 1 closure (MP 20/8 to 21/9)
Planned Roadworks National HighwaysStarts in 7 hours 8 minutes
M53 Southbound lane 1 closure (MP 20/8 to 21/9)
M53 Northbound Jct 4 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 2 hours 36 minutes ago
M53 Northbound Jct 4 exit slip road lane closure