M25 Jct 13 roundabout lane 1 closure
ClearedM25 Jct 13 roundabout lane 1 closure
- Start time
- Wed, Jul 29, 2026 9:00 PM
- Expected end
- Thu, Jul 30, 2026 4:30 AM
- Duration
- 3 hours 5 minutes 1 second
- Road
- A30 – Roundabout At M25 J13/A30
- Category
- Road Maintenance
- Direction
- Clockwise
- Lanes affected
- 2 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 29, 2026 8:53 PM
- Last updated
- Wed, Jul 29, 2026 11:29 PM
- Cleared
- Thu, Jul 30, 2026 12:05 AM
- Latest update: M25 Jct 13 roundabout lane 1 closure
- Coordinates
- 51.444578, -0.530573
- Latitude span
- 51.444192 – 51.444916
- Longitude span
- -0.530669 – -0.530368
- Bounding box centre
- 51.444554, -0.530519
- Location descriptions
-
- roundabout at M25 J13/A30
- Feed validity status
- Active
- Overall feed start
- Wed, Jul 29, 2026 9:00 PM
- Overall feed end
- Thu, Jul 30, 2026 4:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- roundabout at M25 J13/A30
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {247B9409-48F8-489D-A2AE-7598F334FEAB}
- Linear Element Type
- Other
- From Distance
- 24 m
- To Distance
- 45 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.444192 -0.530623 51.444258 -0.530647 51.444384 -0.530657
Segment 2
9 coordinate pairs- Description
- roundabout at M25 J13/A30
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {2EBB97B9-F2D2-4ED8-BAFC-30CE225F8308}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 64 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.444384 -0.530657 51.444465 -0.530669 51.444528 -0.530653 51.444617 -0.530621 51.444707 -0.530575 51.444778 -0.530515 51.444822 -0.530485 51.444884 -0.530411 51.444916 -0.530368
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -0.530623, 51.444192
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.530623,
51.444192
],
[
-0.530647,
51.444258
],
[
-0.530657,
51.444384
],
[
-0.530657,
51.444384
],
[
-0.530669,
51.444465
],
[
-0.530653,
51.444528
],
[
-0.530621,
51.444617
],
[
-0.530575,
51.444707
],
[
-0.530515,
51.444778
],
[
-0.530485,
51.444822
],
[
-0.530411,
51.444884
],
[
-0.530368,
51.444916
]
]
]
}
View road section coordinates
[
[
[
-0.530623,
51.444192
],
[
-0.530647,
51.444258
],
[
-0.530657,
51.444384
],
[
-0.530657,
51.444384
],
[
-0.530669,
51.444465
],
[
-0.530653,
51.444528
],
[
-0.530621,
51.444617
],
[
-0.530575,
51.444707
],
[
-0.530515,
51.444778
],
[
-0.530485,
51.444822
],
[
-0.530411,
51.444884
],
[
-0.530368,
51.444916
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 29, 2026 8:53 PM
- Record versioned
- Wed, Jul 29, 2026 11:29 PM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 38 minutes 28 seconds
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysStarts in 38 minutes 28 seconds
A30 Both Directions Penzance to Exeter Mobile Lane Closures
M25 Clockwise Jct 13 to Jct 14 carriageway closure
Cleared Roadworks National HighwaysCleared 17 hours 51 minutes ago
M25 Clockwise Jct 13 to Jct 14 carriageway closure
M25 anticlockwise Jct 12 to Jct 11 lane 4,3,2 closure
Cleared Roadworks National HighwaysCleared 13 hours 1 minute ago
M25 anticlockwise Jct 12 to Jct 11 lane 4,3,2 closure
M25 Jct 13 roundabout lane 1 closure
Cleared Roadworks National HighwaysCleared 14 hours 6 minutes ago
M25 Jct 13 roundabout lane 1 closure
A30 eastbound Woodleigh exit slip road closure
Cleared Roadworks National HighwaysCleared 11 hours 21 minutes ago
A30 eastbound Woodleigh exit slip road closure