A30 eastbound Layby closure 115/3-115/5
PlannedA30 eastbound Layby closure 115/3-115/5
- Start time
- Wed, Sep 2, 2026 7:00 PM
- Expected end
- Wed, Mar 24, 2027 6:00 AM
- Duration
- 6 months 3 weeks 11 hours
- Road
- A30 – A30 Eastbound Between A389 Near Bodmin (East) And A395
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Aug 18, 2026 4:03 PM
- Last updated
- Wed, Sep 2, 2026 7:15 AM
- Cleared
- Wed, Mar 24, 2027 6:00 AM
- Latest update: A30 eastbound Layby closure 115/3-115/5
- Coordinates
- 50.586274, -4.532053
- Latitude span
- 50.585638 – 50.586899
- Longitude span
- -4.532728 – -4.531404
- Bounding box centre
- 50.586269, -4.532066
- Location descriptions
-
- A30 eastbound between A389 near Bodmin (east) and A395
- Feed validity status
- Planned
- Overall feed start
- Wed, Sep 2, 2026 7:00 PM
- Overall feed end
- Wed, Mar 24, 2027 6:00 AM
- Feed window length
- 6 months 3 weeks 11 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {3E734121-87E2-4362-85B6-DB2456F1D42E}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 10 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.586824 -4.531481 50.586899 -4.531404
Segment 2
5 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {BAC7A2DF-D94F-4AC8-A22D-0B0BC76CBBD8}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 129 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.585854 -4.5325 50.585992 -4.532352 50.58625 -4.532055 50.586333 -4.531975 50.586824 -4.531481
Segment 3
2 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {35F21453-9195-A6F1-2ED9-81B893A51DE3}
- Linear Element Type
- B Carriageway
- From Distance
- 685 m
- To Distance
- 714 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.585638 -4.532728 50.585854 -4.5325
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -4.531481, 50.586824
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-4.531481,
50.586824
],
[
-4.531404,
50.586899
],
[
-4.5325,
50.585854
],
[
-4.532352,
50.585992
],
[
-4.532055,
50.58625
],
[
-4.531975,
50.586333
],
[
-4.531481,
50.586824
],
[
-4.532728,
50.585638
],
[
-4.5325,
50.585854
]
]
]
}
View road section coordinates
[
[
[
-4.531481,
50.586824
],
[
-4.531404,
50.586899
],
[
-4.5325,
50.585854
],
[
-4.532352,
50.585992
],
[
-4.532055,
50.58625
],
[
-4.531975,
50.586333
],
[
-4.531481,
50.586824
],
[
-4.532728,
50.585638
],
[
-4.5325,
50.585854
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Bodmin
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Aug 18, 2026 4:03 PM
- Record versioned
- Wed, Sep 2, 2026 7:15 AM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 9 hours 37 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 westbound entry slip from A38 carriageway closure
Planned Roadworks National HighwaysStarts in 11 hours 37 minutes
A30 westbound entry slip from A38 carriageway closure
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysStarts in 9 hours 37 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 Eastbound Town Lane to Clockhouse Lane Lane 2 Closure
Planned Roadworks National HighwaysStarts in 1 hour 7 minutes
A30 Eastbound Town Lane to Clockhouse Lane Lane 2 Closure
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Cleared Roadworks National HighwaysCleared 5 hours 12 minutes ago
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Cleared Roadworks National HighwaysCleared 14 hours 32 minutes ago
A30 Both Directions Penzance to Exeter Mobile Lane Closures