A55 Northbound lane 2 closure (MP 132/4 to 133/2) )
ClearedA55 Northbound lane 2 closure (MP 132/4 to 133/2) )
- Start time
- Fri, Jul 17, 2026 8:00 PM
- Expected end
- Sat, Jul 18, 2026 4:00 AM
- Duration
- 4 hours 35 minutes 2 seconds
- Road
- A55 – A55 Eastbound Within The A483 Junction
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 2, 2026 7:04 AM
- Last updated
- Sat, Jul 18, 2026 12:14 AM
- Cleared
- Sat, Jul 18, 2026 12:35 AM
- Latest update: A55 Northbound lane 2 closure (MP 132/4 to 133/2) )
- Coordinates
- 53.157024, -2.907121
- Latitude span
- 53.156499 – 53.157620
- Longitude span
- -2.912601 – -2.900769
- Bounding box centre
- 53.157060, -2.906685
- Location descriptions
-
- A55 eastbound within the A483 junction
- A55 eastbound between A483 and A41
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 17, 2026 8:00 PM
- Overall feed end
- Sat, Jul 18, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
12 coordinate pairs- Description
- A55 eastbound within the A483 junction
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A55
- Linear Element Model
- The Network Model
- Linear Element Id
- {D198925D-5014-4619-AEF2-1478E42DC1B4}
- Linear Element Type
- B Carriageway
- From Distance
- 4 m
- To Distance
- 436 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.156499 -2.912601 53.156534 -2.912183 53.156573 -2.91178 53.15668 -2.910616 53.156768 -2.909735 53.156827 -2.909123 53.156856 -2.90881 53.156886 -2.908377 53.156992 -2.907512 53.157098 -2.906572 53.157118 -2.906288 53.157128 -2.906213
Segment 2
6 coordinate pairs- Description
- A55 eastbound between A483 and A41
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A55
- Linear Element Model
- The Network Model
- Linear Element Id
- {17CEBF94-C0D6-4FEF-992E-2FBD2F0894FB}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 368 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.157128 -2.906213 53.157294 -2.904392 53.157383 -2.903377 53.157471 -2.902422 53.157579 -2.901198 53.15762 -2.900769
- Geometry type
- MultiLineString
- Geometry points
- 18
- First coordinate pair
- -2.912601, 53.156499
- Road section segments
- 1
- Road section points
- 18
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.912601,
53.156499
],
[
-2.912183,
53.156534
],
[
-2.91178,
53.156573
],
[
-2.910616,
53.15668
],
[
-2.909735,
53.156768
],
[
-2.909123,
53.156827
],
[
-2.90881,
53.156856
],
[
-2.908377,
53.156886
],
[
-2.907512,
53.156992
],
[
-2.906572,
53.157098
],
[
-2.906288,
53.157118
],
[
-2.906213,
53.157128
],
[
-2.906213,
53.157128
],
[
-2.904392,
53.157294
],
[
-2.903377,
53.157383
],
[
-2.902422,
53.157471
],
[
-2.901198,
53.157579
],
[
-2.900769,
53.15762
]
]
]
}
View road section coordinates
[
[
[
-2.912601,
53.156499
],
[
-2.912183,
53.156534
],
[
-2.91178,
53.156573
],
[
-2.910616,
53.15668
],
[
-2.909735,
53.156768
],
[
-2.909123,
53.156827
],
[
-2.90881,
53.156856
],
[
-2.908377,
53.156886
],
[
-2.907512,
53.156992
],
[
-2.906572,
53.157098
],
[
-2.906288,
53.157118
],
[
-2.906213,
53.157128
],
[
-2.906213,
53.157128
],
[
-2.904392,
53.157294
],
[
-2.903377,
53.157383
],
[
-2.902422,
53.157471
],
[
-2.901198,
53.157579
],
[
-2.900769,
53.15762
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 2, 2026 7:04 AM
- Record versioned
- Sat, Jul 18, 2026 12:14 AM
- Coordinate source
- Geometry
Driving on the A55? See every live closure, roadwork and planned restriction on this road.
A55 live closuresRelated incidents
M56 Eastbound hard shoulder closure (MP 55/0 to 54/6)
Active Roadworks National HighwaysExpected to clear in 2 days 7 hours
M56 Eastbound hard shoulder closure (MP 55/0 to 54/6)
M6 Southbound lane 1 closure (MP 290/0 to 287/7)
Planned Roadworks National HighwaysStarts in 4 hours 14 minutes
M6 Southbound lane 1 closure (MP 290/0 to 287/7)
M56 eastbound lanes 1 and 2 closure (MP 51/4 to 43/1)
Planned Roadworks National HighwaysStarts in 3 hours 14 minutes
M56 eastbound lanes 1 and 2 closure (MP 51/4 to 43/1)
M56 Eastbound hardshoulder closure (MP 56/1 to 55/7)
Cleared Roadworks National HighwaysCleared 3 hours 15 minutes ago
M56 Eastbound hardshoulder closure (MP 56/1 to 55/7)
M56 Eastbound hardshoulder closure (MP 56/1 to 55/7)
Cleared Roadworks National HighwaysCleared 7 hours 55 minutes ago
M56 Eastbound hardshoulder closure (MP 56/1 to 55/7)
M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)
Cleared Roadworks National HighwaysCleared 17 hours 35 minutes ago
M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)