A55 Eastbound Jct 40 entry slip road lane 2 closure

Cleared

A55 Eastbound Jct 40 entry slip road lane 2 closure

Start time
Mon, Oct 5, 2026 8:00 PM
Expected end
Tue, Oct 6, 2026 5:00 AM
Duration
9 hours
Road
A55 – A55 Eastbound Between A51 And M53/A56
Category
Construction Work
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 1 lanes affected
Reason
Construction Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Sep 17, 2026 11:37 AM
Last updated
Tue, Oct 6, 2026 12:19 AM
Cleared
Tue, Oct 6, 2026 5:00 AM
  • Latest update: A55 Eastbound Jct 40 entry slip road lane 2 closure
Coordinates
53.197136, -2.844661
Latitude span
53.195228 – 53.200435
Longitude span
-2.845385 – -2.843870
Bounding box centre
53.197832, -2.844628
Location descriptions
  • A55 eastbound between A51 and M53/A56
  • A55 eastbound access from A51
Feed validity status
Suspended
Overall feed start
Mon, Oct 5, 2026 8:00 PM
Overall feed end
Tue, Oct 6, 2026 5:00 AM
Feed window length
9 hours
Probability code (raw)
certain
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
A55 eastbound between A51 and M53/A56
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A55
Linear Element Model
The Network Model
Linear Element Id
{3FE86C3B-B417-4354-9BA9-8B343566CB0F}
Linear Element Type
B Carriageway
From Distance
0 m
To Distance
230 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.198376 -2.844241
53.200435 -2.84387

Segment 2

3 coordinate pairs
Description
A55 eastbound access from A51
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A55
Linear Element Model
The Network Model
Linear Element Id
{C05740C5-262F-4169-8A9B-F814E8698AB2}
Linear Element Type
B Carriageway Entry Slip
From Distance
0 m
To Distance
80 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.197673 -2.844512
53.197952 -2.844413
53.198376 -2.844241

Segment 3

10 coordinate pairs
Description
A55 eastbound access from A51
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A55
Linear Element Model
The Network Model
Linear Element Id
{BD3C0C7A-6571-4BCF-B716-6EB5DB66FF60}
Linear Element Type
B Carriageway Entry Slip
From Distance
12 m
To Distance
291 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.195228 -2.845385
53.195619 -2.845145
53.195908 -2.844986
53.196052 -2.844929
53.196205 -2.844872
53.19643 -2.844817
53.196466 -2.844808
53.197097 -2.84465
53.197556 -2.844539
53.197673 -2.844512
Geometry type
MultiLineString
Geometry points
15
First coordinate pair
-2.844241, 53.198376
Road section segments
1
Road section points
15
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.844241,
                53.198376
            ],
            [
                -2.84387,
                53.200435
            ],
            [
                -2.844512,
                53.197673
            ],
            [
                -2.844413,
                53.197952
            ],
            [
                -2.844241,
                53.198376
            ],
            [
                -2.845385,
                53.195228
            ],
            [
                -2.845145,
                53.195619
            ],
            [
                -2.844986,
                53.195908
            ],
            [
                -2.844929,
                53.196052
            ],
            [
                -2.844872,
                53.196205
            ],
            [
                -2.844817,
                53.19643
            ],
            [
                -2.844808,
                53.196466
            ],
            [
                -2.84465,
                53.197097
            ],
            [
                -2.844539,
                53.197556
            ],
            [
                -2.844512,
                53.197673
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.844241,
            53.198376
        ],
        [
            -2.84387,
            53.200435
        ],
        [
            -2.844512,
            53.197673
        ],
        [
            -2.844413,
            53.197952
        ],
        [
            -2.844241,
            53.198376
        ],
        [
            -2.845385,
            53.195228
        ],
        [
            -2.845145,
            53.195619
        ],
        [
            -2.844986,
            53.195908
        ],
        [
            -2.844929,
            53.196052
        ],
        [
            -2.844872,
            53.196205
        ],
        [
            -2.844817,
            53.19643
        ],
        [
            -2.844808,
            53.196466
        ],
        [
            -2.84465,
            53.197097
        ],
        [
            -2.844539,
            53.197556
        ],
        [
            -2.844512,
            53.197673
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Construction Work
Compliance
Mandatory
Probability
Certain
Validity status
Suspended
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Thu, Sep 17, 2026 11:37 AM
Record versioned
Tue, Oct 6, 2026 12:19 AM
Coordinate source
Geometry

Driving on the A55? See every live closure, roadwork and planned restriction on this road.

A55 live closures

Related incidents

A55 Eastbound lane 1 closure (MP 134/0 to 135/4)

Planned Roadworks National Highways
Cheshire West And Chester A55 · A55 Eastbound Between A483 And A41

Starts in 2 hours 27 minutes

Starts 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 05:00

A55 Eastbound lane 1 closure (MP 134/0 to 135/4)

Category: Road Maintenance
View update

A55 Westbound Jct 39 entry slip road closure

Planned Roadworks National Highways
Cheshire West And Chester A55 · A55 Westbound Access From A41

Starts in 2 hours 27 minutes

Starts 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 05:00

A55 Westbound Jct 39 entry slip road closure

Category: Road Maintenance
View update

M53 southbound jct 9 exit slip road closure

Cleared Roadworks National Highways
Cheshire West And Chester M53 · M53 J9 Southbound Exit

Cleared 1 day 20 hours ago

Started 10 Oct 2026, 20:00 Ended 10 Oct 2026, 20:00

M53 southbound jct 9 exit slip road closure

Category: Road Maintenance
View update

M56 Eastbound lanes 1 and 2 closure (MP 52/5 to 49/4)

Cleared Roadworks National Highways
Cheshire West And Chester A5117 · Roundabout At M56 J14/A5117

Cleared 4 days 21 hours ago

Started 7 Oct 2026, 19:00 Ended 7 Oct 2026, 19:00

M56 Eastbound lanes 1 and 2 closure (MP 52/5 to 49/4)

Category: Road Maintenance
View update

A55 Northbound lane 2 closure (MP 132/4 to 133/5)

Cleared Roadworks National Highways
Cheshire West And Chester A55 · A55 Eastbound Within The A483 Junction

Cleared 5 days 16 hours ago

Started 6 Oct 2026, 20:10 Ended 7 Oct 2026, 00:30

A55 Northbound lane 2 closure (MP 132/4 to 133/5)

Category: Construction Work
View update

A55 Northbound lane 2 closure (MP 132/4 to 133/5)

Cleared Roadworks National Highways
Cheshire West And Chester A55 · A55 Eastbound Within The A483 Junction

Cleared 5 days 19 hours ago

Started 6 Oct 2026, 20:00 Ended 6 Oct 2026, 20:45

A55 Northbound lane 2 closure (MP 132/4 to 133/5)

Category: Construction Work
View update