A30 eastbound Temple Tor layby closed 106/0
ClearedA30 eastbound Temple Tor layby closed 106/0
- Start time
- Thu, Jul 16, 2026 11:00 AM
- Expected end
- Fri, Jul 17, 2026 5:00 AM
- Duration
- 16 hours 40 minutes 2 seconds
- Road
- A30 – A30 Eastbound Between A389 Near Bodmin (East) And A395
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 16, 2026 10:47 PM
- Last updated
- Fri, Jul 17, 2026 3:21 AM
- Cleared
- Fri, Jul 17, 2026 3:40 AM
- Latest update: A30 eastbound Temple Tor layby closed 106/0
- Coordinates
- 50.535877, -4.624664
- Latitude span
- 50.535447 – 50.536235
- Longitude span
- -4.626184 – -4.623209
- Bounding box centre
- 50.535841, -4.624697
- Location descriptions
-
- A30 eastbound between A389 near Bodmin (east) and A395
- Feed validity status
- Planned
- Overall feed start
- Thu, Jul 16, 2026 11:00 AM
- Overall feed end
- Fri, Jul 17, 2026 5:00 AM
- Feed window length
- 18 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {2C2941D8-30D2-4B96-9081-81258669A0D5}
- Linear Element Type
- B Carriageway
- From Distance
- 485 m
- To Distance
- 492 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.535447 -4.626184 50.535477 -4.626096
Segment 2
6 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {117C170F-2C39-47C2-8EFE-A941BBD76031}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 212 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.535477 -4.626096 50.535768 -4.625152 50.535904 -4.624711 50.535954 -4.62451 50.536073 -4.624026 50.536216 -4.62333
Segment 3
2 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {C5BF365A-37E1-433B-AFB9-0275BF69A25D}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 8 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.536216 -4.62333 50.536235 -4.623209
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -4.626184, 50.535447
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-4.626184,
50.535447
],
[
-4.626096,
50.535477
],
[
-4.626096,
50.535477
],
[
-4.625152,
50.535768
],
[
-4.624711,
50.535904
],
[
-4.62451,
50.535954
],
[
-4.624026,
50.536073
],
[
-4.62333,
50.536216
],
[
-4.62333,
50.536216
],
[
-4.623209,
50.536235
]
]
]
}
View road section coordinates
[
[
[
-4.626184,
50.535447
],
[
-4.626096,
50.535477
],
[
-4.626096,
50.535477
],
[
-4.625152,
50.535768
],
[
-4.624711,
50.535904
],
[
-4.62451,
50.535954
],
[
-4.624026,
50.536073
],
[
-4.62333,
50.536216
],
[
-4.62333,
50.536216
],
[
-4.623209,
50.536235
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Bodmin
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 16, 2026 10:47 PM
- Record versioned
- Fri, Jul 17, 2026 3:21 AM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 westbound entry slip from A38 carriageway closure
Planned Roadworks National HighwaysStarts in 17 hours 15 minutes
A30 westbound entry slip from A38 carriageway closure
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysStarts in 3 hours 15 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Cleared Roadworks National HighwaysCleared 1 hour 44 minutes ago
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Cleared Roadworks National HighwaysCleared 8 hours 44 minutes ago
A30 Both Directions Penzance to Exeter Mobile Lane Closures
M25 Jct 13 roundabout lane 1 closure
Cleared Roadworks National HighwaysCleared 23 hours 29 minutes ago
M25 Jct 13 roundabout lane 1 closure
A30 eastbound Woodleigh exit slip road closure
Cleared Roadworks National HighwaysCleared 20 hours 44 minutes ago
A30 eastbound Woodleigh exit slip road closure