A30 eastbound Fivelanes lane closure 116/0-117/0
ClearedA30 eastbound Fivelanes lane closure 116/0-117/0
- Start time
- Mon, Aug 3, 2026 10:42 PM
- Expected end
- Tue, Aug 4, 2026 5:00 AM
- Duration
- 1 hour 3 minutes 2 seconds
- Road
- A30 – A30 Eastbound Between A389 Near Bodmin (East) And A395
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Aug 3, 2026 10:46 PM
- Last updated
- Mon, Aug 3, 2026 11:27 PM
- Cleared
- Mon, Aug 3, 2026 11:45 PM
- Latest update: A30 eastbound Fivelanes lane closure 116/0-117/0
- Coordinates
- 50.594301, -4.521938
- Latitude span
- 50.591153 – 50.596244
- Longitude span
- -4.527755 – -4.516229
- Bounding box centre
- 50.593699, -4.521992
- Location descriptions
-
- A30 eastbound between A389 near Bodmin (east) and A395
- A30 eastbound at a minor junction between A389 near Bodmin (east) and A395
- Feed validity status
- Active
- Overall feed start
- Mon, Aug 3, 2026 10:42 PM
- Overall feed end
- Tue, Aug 4, 2026 5:00 AM
- Feed window length
- 6 hours 18 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {3B493FCE-7541-4EB8-A9E5-E720F285B6C8}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 23 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.593916 -4.523609 50.594039 -4.523387 50.594049 -4.52336
Segment 2
10 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {DEA27A45-176B-4733-8B2B-345E9BA72E96}
- Linear Element Type
- B Carriageway
- From Distance
- 90 m
- To Distance
- 516 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.591153 -4.527755 50.591199 -4.527708 50.591392 -4.527502 50.591622 -4.527234 50.591861 -4.526916 50.59207 -4.526618 50.592299 -4.526249 50.593244 -4.524786 50.593515 -4.524334 50.593916 -4.523609
Segment 3
11 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {BE1F1EA4-2C06-46BF-90B0-1842B849A551}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 354 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.594049 -4.52336 50.594294 -4.522822 50.594585 -4.522131 50.59473 -4.521785 50.59494 -4.521231 50.595151 -4.520621 50.595383 -4.519912 50.595402 -4.519857 50.595508 -4.519523 50.595644 -4.51905 50.595644 -4.519036
Segment 4
8 coordinate pairs- Description
- A30 eastbound at a minor junction between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {7389CD2F-9C3F-4333-8E3B-FCF1170D55D8}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 209 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.595644 -4.519036 50.595812 -4.518367 50.595901 -4.517976 50.596031 -4.517403 50.59605 -4.51732 50.596141 -4.516858 50.596213 -4.516424 50.596244 -4.516229
- Geometry type
- MultiLineString
- Geometry points
- 32
- First coordinate pair
- -4.523609, 50.593916
- Road section segments
- 1
- Road section points
- 32
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-4.523609,
50.593916
],
[
-4.523387,
50.594039
],
[
-4.52336,
50.594049
],
[
-4.527755,
50.591153
],
[
-4.527708,
50.591199
],
[
-4.527502,
50.591392
],
[
-4.527234,
50.591622
],
[
-4.526916,
50.591861
],
[
-4.526618,
50.59207
],
[
-4.526249,
50.592299
],
[
-4.524786,
50.593244
],
[
-4.524334,
50.593515
],
[
-4.523609,
50.593916
],
[
-4.52336,
50.594049
],
[
-4.522822,
50.594294
],
[
-4.522131,
50.594585
],
[
-4.521785,
50.59473
],
[
-4.521231,
50.59494
],
[
-4.520621,
50.595151
],
[
-4.519912,
50.595383
],
[
-4.519857,
50.595402
],
[
-4.519523,
50.595508
],
[
-4.51905,
50.595644
],
[
-4.519036,
50.595644
],
[
-4.519036,
50.595644
],
[
-4.518367,
50.595812
],
[
-4.517976,
50.595901
],
[
-4.517403,
50.596031
],
[
-4.51732,
50.59605
],
[
-4.516858,
50.596141
],
[
-4.516424,
50.596213
],
[
-4.516229,
50.596244
]
]
]
}
View road section coordinates
[
[
[
-4.523609,
50.593916
],
[
-4.523387,
50.594039
],
[
-4.52336,
50.594049
],
[
-4.527755,
50.591153
],
[
-4.527708,
50.591199
],
[
-4.527502,
50.591392
],
[
-4.527234,
50.591622
],
[
-4.526916,
50.591861
],
[
-4.526618,
50.59207
],
[
-4.526249,
50.592299
],
[
-4.524786,
50.593244
],
[
-4.524334,
50.593515
],
[
-4.523609,
50.593916
],
[
-4.52336,
50.594049
],
[
-4.522822,
50.594294
],
[
-4.522131,
50.594585
],
[
-4.521785,
50.59473
],
[
-4.521231,
50.59494
],
[
-4.520621,
50.595151
],
[
-4.519912,
50.595383
],
[
-4.519857,
50.595402
],
[
-4.519523,
50.595508
],
[
-4.51905,
50.595644
],
[
-4.519036,
50.595644
],
[
-4.519036,
50.595644
],
[
-4.518367,
50.595812
],
[
-4.517976,
50.595901
],
[
-4.517403,
50.596031
],
[
-4.51732,
50.59605
],
[
-4.516858,
50.596141
],
[
-4.516424,
50.596213
],
[
-4.516229,
50.596244
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed region label
- Bodmin
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Aug 3, 2026 10:46 PM
- Record versioned
- Mon, Aug 3, 2026 11:27 PM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysStarts in 3 hours 32 seconds
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Eastbound lane 2 closed 45/6B to 46/4B
Cleared Roadworks National HighwaysCleared 6 hours 59 minutes ago
Eastbound lane 2 closed 45/6B to 46/4B
A30 westbound entry slip from A38 carriageway closure
Cleared Roadworks National HighwaysCleared 1 hour 59 minutes ago
A30 westbound entry slip from A38 carriageway closure
A30 eastbound Avers to Chiverton Cross carriageway closure
Cleared Roadworks National HighwaysCleared 6 hours 49 minutes ago
A30 eastbound Avers to Chiverton Cross carriageway closure
A30 eastbound Avers to Chiverton Cross carriageway closure
Cleared Roadworks National HighwaysCleared 3 hours 34 minutes ago
A30 eastbound Avers to Chiverton Cross carriageway closure
Eastbound lane 2 closed 45/6B to 46/4B
Cleared Roadworks National HighwaysCleared 1 hour 59 minutes ago
Eastbound lane 2 closed 45/6B to 46/4B