M5 northbound Jct 13 to Jct 14 - lane 3 closure
PlannedM5 northbound Jct 13 to Jct 14 - lane 3 closure
- Start time
- Fri, May 15, 2026 8:00 PM
- Expected end
- Sat, May 16, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M5 – M5 Northbound Between J14 And J13
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed, 1 of 3 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, May 14, 2026 7:42 PM
- Last updated
- Fri, May 15, 2026 12:22 AM
- Cleared
- Sat, May 16, 2026 5:00 AM
- Latest update: M5 northbound Jct 13 to Jct 14 - lane 3 closure
- Coordinates
- 51.705651, -2.385367
- Latitude span
- 51.701493 – 51.709552
- Longitude span
- -2.390487 – -2.379297
- Bounding box centre
- 51.705523, -2.384892
- Location descriptions
-
- M5 northbound between J14 and J13
- Feed validity status
- Planned
- Overall feed start
- Fri, May 15, 2026 8:00 PM
- Overall feed end
- Sat, May 16, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
18 coordinate pairs- Description
- M5 northbound between J14 and J13
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {C1D311E2-738D-4BB7-B452-9B1D03273679}
- Linear Element Type
- B Carriageway
- From Distance
- 488 m
- To Distance
- 1,392 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.701493 -2.390487 51.701904 -2.39017 51.70219 -2.389943 51.702246 -2.389898 51.702679 -2.389496 51.703356 -2.388793 51.70364 -2.388492 51.703708 -2.38842 51.704457 -2.387587 51.705107 -2.386724 51.705459 -2.386264 51.70583 -2.385674 51.706246 -2.385012 51.706472 -2.384609 51.70696 -2.383715 51.707114 -2.383427 51.707548 -2.382649 51.707738 -2.382304
Segment 2
6 coordinate pairs- Description
- M5 northbound between J14 and J13
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {9D3B53D5-33DC-4844-BAE8-1CF57AEEDE15}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 289 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.707738 -2.382304 51.707774 -2.382232 51.708407 -2.381079 51.708751 -2.380503 51.709248 -2.379726 51.709552 -2.379297
- Geometry type
- MultiLineString
- Geometry points
- 24
- First coordinate pair
- -2.390487, 51.701493
- Road section segments
- 1
- Road section points
- 24
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.390487,
51.701493
],
[
-2.39017,
51.701904
],
[
-2.389943,
51.70219
],
[
-2.389898,
51.702246
],
[
-2.389496,
51.702679
],
[
-2.388793,
51.703356
],
[
-2.388492,
51.70364
],
[
-2.38842,
51.703708
],
[
-2.387587,
51.704457
],
[
-2.386724,
51.705107
],
[
-2.386264,
51.705459
],
[
-2.385674,
51.70583
],
[
-2.385012,
51.706246
],
[
-2.384609,
51.706472
],
[
-2.383715,
51.70696
],
[
-2.383427,
51.707114
],
[
-2.382649,
51.707548
],
[
-2.382304,
51.707738
],
[
-2.382304,
51.707738
],
[
-2.382232,
51.707774
],
[
-2.381079,
51.708407
],
[
-2.380503,
51.708751
],
[
-2.379726,
51.709248
],
[
-2.379297,
51.709552
]
]
]
}
View road section coordinates
[
[
[
-2.390487,
51.701493
],
[
-2.39017,
51.701904
],
[
-2.389943,
51.70219
],
[
-2.389898,
51.702246
],
[
-2.389496,
51.702679
],
[
-2.388793,
51.703356
],
[
-2.388492,
51.70364
],
[
-2.38842,
51.703708
],
[
-2.387587,
51.704457
],
[
-2.386724,
51.705107
],
[
-2.386264,
51.705459
],
[
-2.385674,
51.70583
],
[
-2.385012,
51.706246
],
[
-2.384609,
51.706472
],
[
-2.383715,
51.70696
],
[
-2.383427,
51.707114
],
[
-2.382649,
51.707548
],
[
-2.382304,
51.707738
],
[
-2.382304,
51.707738
],
[
-2.382232,
51.707774
],
[
-2.381079,
51.708407
],
[
-2.380503,
51.708751
],
[
-2.379726,
51.709248
],
[
-2.379297,
51.709552
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, May 14, 2026 7:42 PM
- Record versioned
- Fri, May 15, 2026 12:22 AM
- Coordinate source
- Geometry
Related incidents
Lane 3/2 closure
Planned National Highwayslane 3/2 closure
M5 northbound Jct 1 to M6 southbound Jct 8 link road closure
Planned National HighwaysM5 northbound Jct 1 to M6 southbound Jct 8 link road closure
Single lane running
Planned National Highwayssingle lane running
M5 northbound Jct 16 exit slip - lane closure
Planned National HighwaysM5 northbound Jct 16 exit slip - lane closure
M5 southbound Jct 30 entry slip road carriageway closure
Planned National HighwaysM5 southbound Jct 30 entry slip road carriageway closure
Hard shoulder, lane 1 and lane 2 closure southbound
Planned National HighwaysHard shoulder, lane 1 and lane 2 closure southbound