M65 westbound lanes 2 and 3 closure (MP 24/7 to carriageway closure)
ClearedM65 westbound lanes 2 and 3 closure (MP 24/7 to carriageway closure)
- Start time
- Thu, Sep 17, 2026 8:00 PM
- Expected end
- Fri, Sep 18, 2026 4:00 AM
- Duration
- 50 minutes 2 seconds
- Road
- M65 – M65 Westbound Between J8 And J7
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Sep 17, 2026 3:26 AM
- Last updated
- Thu, Sep 17, 2026 8:12 PM
- Cleared
- Thu, Sep 17, 2026 8:50 PM
- Latest update: M65 westbound lanes 2 and 3 closure (MP 24/7 to carriageway closure)
- Coordinates
- 53.771728, -2.376597
- Latitude span
- 53.769560 – 53.774062
- Longitude span
- -2.382536 – -2.368630
- Bounding box centre
- 53.771811, -2.375583
- Location descriptions
-
- M65 westbound between J8 and J7
- Feed validity status
- Planned
- Overall feed start
- Thu, Sep 17, 2026 8:00 PM
- Overall feed end
- Fri, Sep 18, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
15 coordinate pairs- Description
- M65 westbound between J8 and J7
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {2B655488-035F-42F7-B33B-4C4DD12B350E}
- Linear Element Type
- B Carriageway
- From Distance
- 1,962 m
- To Distance
- 2,831 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.774062 -2.36863 53.774009 -2.368883 53.773818 -2.369746 53.773517 -2.371063 53.773362 -2.371699 53.773126 -2.372592 53.772953 -2.373213 53.772526 -2.374726 53.772281 -2.375498 53.771773 -2.377041 53.771419 -2.378039 53.771011 -2.379128 53.77054 -2.380292 53.770531 -2.380315 53.770522 -2.380337
Segment 2
6 coordinate pairs- Description
- M65 westbound between J8 and J7
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {CFEFBE66-68B7-4FB0-A7E1-238EE3A48B5C}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 180 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.770522 -2.380337 53.770441 -2.380534 53.770332 -2.380776 53.77025 -2.380987 53.769725 -2.382166 53.76956 -2.382536
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -2.368630, 53.774062
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.36863,
53.774062
],
[
-2.368883,
53.774009
],
[
-2.369746,
53.773818
],
[
-2.371063,
53.773517
],
[
-2.371699,
53.773362
],
[
-2.372592,
53.773126
],
[
-2.373213,
53.772953
],
[
-2.374726,
53.772526
],
[
-2.375498,
53.772281
],
[
-2.377041,
53.771773
],
[
-2.378039,
53.771419
],
[
-2.379128,
53.771011
],
[
-2.380292,
53.77054
],
[
-2.380315,
53.770531
],
[
-2.380337,
53.770522
],
[
-2.380337,
53.770522
],
[
-2.380534,
53.770441
],
[
-2.380776,
53.770332
],
[
-2.380987,
53.77025
],
[
-2.382166,
53.769725
],
[
-2.382536,
53.76956
]
]
]
}
View road section coordinates
[
[
[
-2.36863,
53.774062
],
[
-2.368883,
53.774009
],
[
-2.369746,
53.773818
],
[
-2.371063,
53.773517
],
[
-2.371699,
53.773362
],
[
-2.372592,
53.773126
],
[
-2.373213,
53.772953
],
[
-2.374726,
53.772526
],
[
-2.375498,
53.772281
],
[
-2.377041,
53.771773
],
[
-2.378039,
53.771419
],
[
-2.379128,
53.771011
],
[
-2.380292,
53.77054
],
[
-2.380315,
53.770531
],
[
-2.380337,
53.770522
],
[
-2.380337,
53.770522
],
[
-2.380534,
53.770441
],
[
-2.380776,
53.770332
],
[
-2.380987,
53.77025
],
[
-2.382166,
53.769725
],
[
-2.382536,
53.76956
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Sep 17, 2026 3:26 AM
- Record versioned
- Thu, Sep 17, 2026 8:12 PM
- Coordinate source
- Geometry
Driving on the M65? See every live closure, roadwork and planned restriction on this road.
M65 live closuresRelated incidents
M65 eastbound lane 2 and 3 closure (MP 26/7 to 28/8)
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
M65 eastbound lane 2 and 3 closure (MP 26/7 to 28/8)
M65 Eastbound Jct 5 exit slip road lane closure
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
M65 Eastbound Jct 5 exit slip road lane closure
M65 Westbound Jct 5 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 8 hours 18 minutes ago
M65 Westbound Jct 5 exit slip road lane closure
M65 Westbound Jct 5 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 4 hours 3 minutes ago
M65 Westbound Jct 5 exit slip road lane closure
M65 eastbound lane 2 and 3 closure (MP 26/7 to 28/8)
Cleared Roadworks National HighwaysCleared 16 hours 48 minutes ago
M65 eastbound lane 2 and 3 closure (MP 26/7 to 28/8)
M65 eastbound lane 2 and 3 closure (MP 26/7 to 28/8)
Cleared Roadworks National HighwaysCleared 20 hours 8 minutes ago
M65 eastbound lane 2 and 3 closure (MP 26/7 to 28/8)