M62 Eastbound lane 1 closure (MP 35/4 to 36/3)
ClearedM62 Eastbound lane 1 closure (MP 35/4 to 36/3)
- Start time
- Fri, Oct 2, 2026 8:00 PM
- Expected end
- Sat, Oct 3, 2026 4:00 AM
- Duration
- 2 seconds
- Road
- M62 – M62 Eastbound Between J11 And J12
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 2, 2026 11:46 AM
- Last updated
- Fri, Oct 2, 2026 7:27 PM
- Cleared
- Fri, Oct 2, 2026 8:00 PM
- Latest update: M62 Eastbound lane 1 closure (MP 35/4 to 36/3)
- Coordinates
- 53.440079, -2.463387
- Latitude span
- 53.438948 – 53.441148
- Longitude span
- -2.469433 – -2.457643
- Bounding box centre
- 53.440048, -2.463538
- Location descriptions
-
- M62 eastbound between J11 and J12
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 2, 2026 8:00 PM
- Overall feed end
- Sat, Oct 3, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M62 eastbound between J11 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {AEDDD681-679E-42F3-853A-60ADB4EF6CD4}
- Linear Element Type
- A Carriageway
- From Distance
- 69 m
- To Distance
- 416 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.438948 -2.469433 53.43919 -2.468128 53.439886 -2.464456
Segment 2
5 coordinate pairs- Description
- M62 eastbound between J11 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {DC7D92B1-831D-4169-9B18-3075BC5ECDEA}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 473 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.439886 -2.464456 53.440062 -2.463486 53.440659 -2.460286 53.440852 -2.459204 53.441148 -2.457643
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -2.469433, 53.438948
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.469433,
53.438948
],
[
-2.468128,
53.43919
],
[
-2.464456,
53.439886
],
[
-2.464456,
53.439886
],
[
-2.463486,
53.440062
],
[
-2.460286,
53.440659
],
[
-2.459204,
53.440852
],
[
-2.457643,
53.441148
]
]
]
}
View road section coordinates
[
[
[
-2.469433,
53.438948
],
[
-2.468128,
53.43919
],
[
-2.464456,
53.439886
],
[
-2.464456,
53.439886
],
[
-2.463486,
53.440062
],
[
-2.460286,
53.440659
],
[
-2.459204,
53.440852
],
[
-2.457643,
53.441148
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Oct 2, 2026 11:46 AM
- Record versioned
- Fri, Oct 2, 2026 7:27 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)
Active Roadworks National HighwaysExpected to clear in 1 week 4 days
M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
Active Roadworks National HighwaysExpected to clear in 1 week 6 days
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Planned Roadworks National HighwaysStarts in 5 hours 52 minutes
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
Planned Roadworks National HighwaysStarts in 5 hours 52 minutes
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Planned Roadworks National HighwaysStarts in 5 hours 52 minutes
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
Planned Roadworks National HighwaysStarts in 4 hours 52 minutes
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)