M62 Eastbound lane 1 closure (MP 31/8 to 33/4)
PlannedM62 Eastbound lane 1 closure (MP 31/8 to 33/4)
- Start time
- Wed, Aug 5, 2026 7:00 PM
- Expected end
- Thu, Aug 6, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M62 – M62 Eastbound Between J10 And J11
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected, 1 of 4 lanes affected
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, May 28, 2026 7:22 AM
- Last updated
- Wed, Aug 5, 2026 12:10 AM
- Cleared
- Thu, Aug 6, 2026 5:00 AM
- Latest update: M62 Eastbound lane 1 closure (MP 31/8 to 33/4)
- Coordinates
- 53.434491, -2.507809
- Latitude span
- 53.433396 – 53.435077
- Longitude span
- -2.522377 – -2.500012
- Bounding box centre
- 53.434237, -2.511195
- Location descriptions
-
- M62 eastbound between J10 and J11
- M62 eastbound within J11
- Feed validity status
- Planned
- Overall feed start
- Wed, Aug 5, 2026 7:00 PM
- Overall feed end
- Thu, Aug 6, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- M62 eastbound between J10 and J11
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {DFC7BC6E-0298-436A-AA85-CEA7B47A20FB}
- Linear Element Type
- A Carriageway
- From Distance
- 261 m
- To Distance
- 1,369 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.433396 -2.522377 53.433593 -2.519755 53.433956 -2.514977 53.433974 -2.514733 53.434338 -2.50977 53.434394 -2.508988 53.434585 -2.506476 53.434641 -2.50583
Segment 2
2 coordinate pairs- Description
- M62 eastbound within J11
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {A0F98346-26C9-4C02-871A-B8099F27DB9E}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 66 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.435003 -2.501002 53.435077 -2.500012
Segment 3
5 coordinate pairs- Description
- M62 eastbound within J11
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {E3E42231-4714-4F5B-800D-A0D2812F8F8F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 323 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.434641 -2.50583 53.434832 -2.503303 53.434933 -2.50195 53.434994 -2.50113 53.435003 -2.501002
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -2.522377, 53.433396
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.522377,
53.433396
],
[
-2.519755,
53.433593
],
[
-2.514977,
53.433956
],
[
-2.514733,
53.433974
],
[
-2.50977,
53.434338
],
[
-2.508988,
53.434394
],
[
-2.506476,
53.434585
],
[
-2.50583,
53.434641
],
[
-2.501002,
53.435003
],
[
-2.500012,
53.435077
],
[
-2.50583,
53.434641
],
[
-2.503303,
53.434832
],
[
-2.50195,
53.434933
],
[
-2.50113,
53.434994
],
[
-2.501002,
53.435003
]
]
]
}
View road section coordinates
[
[
[
-2.522377,
53.433396
],
[
-2.519755,
53.433593
],
[
-2.514977,
53.433956
],
[
-2.514733,
53.433974
],
[
-2.50977,
53.434338
],
[
-2.508988,
53.434394
],
[
-2.506476,
53.434585
],
[
-2.50583,
53.434641
],
[
-2.501002,
53.435003
],
[
-2.500012,
53.435077
],
[
-2.50583,
53.434641
],
[
-2.503303,
53.434832
],
[
-2.50195,
53.434933
],
[
-2.50113,
53.434994
],
[
-2.501002,
53.435003
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, May 28, 2026 7:22 AM
- Record versioned
- Wed, Aug 5, 2026 12:10 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 5 days
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 eastbound Jct 26 Lane 3 closure (100/4 101/9)
Cleared Roadworks National HighwaysExpected to clear in 23 hours 14 minutes
M62 eastbound Jct 26 Lane 3 closure (100/4 101/9)
M62 westbound Jct 37 entry slip lane closure
Planned Roadworks National HighwaysStarts in 13 hours 14 minutes
M62 westbound Jct 37 entry slip lane closure
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
Planned Roadworks National HighwaysStarts in 13 hours 14 minutes
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
M62 Eastbound Jct 10 exit slip road Lane 1 closure
Planned Roadworks National HighwaysStarts in 13 hours 14 minutes
M62 Eastbound Jct 10 exit slip road Lane 1 closure