M62 Eastbound lane 1 closure (MP 24/9 to 26/4)
PlannedM62 Eastbound lane 1 closure (MP 24/9 to 26/4)
- Start time
- Tue, Aug 4, 2026 7:00 PM
- Expected end
- Wed, Aug 5, 2026 4:00 AM
- Duration
- 9 hours
- Road
- M62 – M62 Eastbound Between J8 And J9 After Services
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 15, 2026 9:27 AM
- Last updated
- Tue, Aug 4, 2026 1:55 AM
- Cleared
- Wed, Aug 5, 2026 4:00 AM
- Latest update: M62 Eastbound lane 1 closure (MP 24/9 to 26/4)
- Coordinates
- 53.421619, -2.611288
- Latitude span
- 53.419710 – 53.422531
- Longitude span
- -2.623863 – -2.601878
- Bounding box centre
- 53.421121, -2.612871
- Location descriptions
-
- M62 eastbound between J8 and J9 after services
- M62 eastbound within J9
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 4, 2026 7:00 PM
- Overall feed end
- Wed, Aug 5, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- M62 eastbound between J8 and J9 after services
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {259357D3-A0FC-43D3-972A-BBC4A516569F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 354 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.422051 -2.609073 53.422108 -2.608577 53.422165 -2.607976 53.422261 -2.606774 53.422328 -2.605932 53.422338 -2.605676 53.422368 -2.605255 53.422446 -2.604008 53.422465 -2.603782
Segment 2
14 coordinate pairs- Description
- M62 eastbound between J8 and J9 after services
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {DD637881-FE76-4761-9FEA-623E9AD7C1EE}
- Linear Element Type
- A Carriageway
- From Distance
- 472 m
- To Distance
- 1,491 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.41971 -2.623863 53.41994 -2.622826 53.420144 -2.621851 53.420216 -2.621506 53.420364 -2.620755 53.420687 -2.61909 53.420929 -2.617619 53.420966 -2.617411 53.421049 -2.616943 53.421263 -2.615622 53.421468 -2.614241 53.421673 -2.612709 53.42188 -2.610891 53.422051 -2.609073
Segment 3
5 coordinate pairs- Description
- M62 eastbound within J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {6DA98A82-786F-4AEC-BD81-B84401AF1FC6}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 126 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.422465 -2.603782 53.422476 -2.603376 53.422484 -2.603063 53.422498 -2.602519 53.422531 -2.601878
- Geometry type
- MultiLineString
- Geometry points
- 28
- First coordinate pair
- -2.609073, 53.422051
- Road section segments
- 1
- Road section points
- 28
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.609073,
53.422051
],
[
-2.608577,
53.422108
],
[
-2.607976,
53.422165
],
[
-2.606774,
53.422261
],
[
-2.605932,
53.422328
],
[
-2.605676,
53.422338
],
[
-2.605255,
53.422368
],
[
-2.604008,
53.422446
],
[
-2.603782,
53.422465
],
[
-2.623863,
53.41971
],
[
-2.622826,
53.41994
],
[
-2.621851,
53.420144
],
[
-2.621506,
53.420216
],
[
-2.620755,
53.420364
],
[
-2.61909,
53.420687
],
[
-2.617619,
53.420929
],
[
-2.617411,
53.420966
],
[
-2.616943,
53.421049
],
[
-2.615622,
53.421263
],
[
-2.614241,
53.421468
],
[
-2.612709,
53.421673
],
[
-2.610891,
53.42188
],
[
-2.609073,
53.422051
],
[
-2.603782,
53.422465
],
[
-2.603376,
53.422476
],
[
-2.603063,
53.422484
],
[
-2.602519,
53.422498
],
[
-2.601878,
53.422531
]
]
]
}
View road section coordinates
[
[
[
-2.609073,
53.422051
],
[
-2.608577,
53.422108
],
[
-2.607976,
53.422165
],
[
-2.606774,
53.422261
],
[
-2.605932,
53.422328
],
[
-2.605676,
53.422338
],
[
-2.605255,
53.422368
],
[
-2.604008,
53.422446
],
[
-2.603782,
53.422465
],
[
-2.623863,
53.41971
],
[
-2.622826,
53.41994
],
[
-2.621851,
53.420144
],
[
-2.621506,
53.420216
],
[
-2.620755,
53.420364
],
[
-2.61909,
53.420687
],
[
-2.617619,
53.420929
],
[
-2.617411,
53.420966
],
[
-2.616943,
53.421049
],
[
-2.615622,
53.421263
],
[
-2.614241,
53.421468
],
[
-2.612709,
53.421673
],
[
-2.610891,
53.42188
],
[
-2.609073,
53.422051
],
[
-2.603782,
53.422465
],
[
-2.603376,
53.422476
],
[
-2.603063,
53.422484
],
[
-2.602519,
53.422498
],
[
-2.601878,
53.422531
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 15, 2026 9:27 AM
- Record versioned
- Tue, Aug 4, 2026 1:55 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 6 days
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
Planned Roadworks National HighwaysStarts in 15 hours 8 minutes
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
M62 eastbound Jct 27 entry slip road closure
Planned Roadworks National HighwaysStarts in 14 hours 8 minutes
M62 eastbound Jct 27 entry slip road closure
M62 eastbound Jct 35 to M18 southbound Jct 7 carriageway closure
Planned Roadworks National HighwaysStarts in 14 hours 8 minutes
M62 eastbound Jct 35 to M18 southbound Jct 7 carriageway closure
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
Planned Roadworks National HighwaysStarts in 14 hours 8 minutes
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)