M62 Eastbound Jct 8 exit slip road lane 1 closure
ClearedM62 Eastbound Jct 8 exit slip road lane 1 closure
- Start time
- Fri, Jul 17, 2026 7:00 PM
- Expected end
- Sat, Jul 18, 2026 4:00 AM
- Duration
- 5 minutes 2 seconds
- Road
- M62 – M62 Eastbound Between J7 And J8
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected, 1 of 1 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 16, 2026 11:39 PM
- Last updated
- Fri, Jul 17, 2026 6:39 PM
- Cleared
- Fri, Jul 17, 2026 7:05 PM
- Latest update: M62 Eastbound Jct 8 exit slip road lane 1 closure
- Coordinates
- 53.415339, -2.650668
- Latitude span
- 53.414872 – 53.415802
- Longitude span
- -2.654459 – -2.647845
- Bounding box centre
- 53.415337, -2.651152
- Location descriptions
-
- M62 eastbound between J7 and J8
- M62 J8 eastbound exit
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 17, 2026 7:00 PM
- Overall feed end
- Sat, Jul 18, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M62 eastbound between J7 and J8
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {AC6A9BD7-C92A-4FED-9191-D5D5213E644D}
- Linear Element Type
- A Carriageway
- From Distance
- 1,175 m
- To Distance
- 1,289 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.414872 -2.654459 53.414875 -2.654422 53.414959 -2.65331 53.415003 -2.65276
Segment 2
9 coordinate pairs- Description
- M62 J8 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {49EA6E94-0213-4DB2-94BC-D6ABA2FA95C9}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 340 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.415003 -2.65276 53.415092 -2.652169 53.415385 -2.650202 53.415594 -2.648512 53.415624 -2.648323 53.415684 -2.648081 53.415733 -2.647965 53.415782 -2.647873 53.415802 -2.647845
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -2.654459, 53.414872
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.654459,
53.414872
],
[
-2.654422,
53.414875
],
[
-2.65331,
53.414959
],
[
-2.65276,
53.415003
],
[
-2.65276,
53.415003
],
[
-2.652169,
53.415092
],
[
-2.650202,
53.415385
],
[
-2.648512,
53.415594
],
[
-2.648323,
53.415624
],
[
-2.648081,
53.415684
],
[
-2.647965,
53.415733
],
[
-2.647873,
53.415782
],
[
-2.647845,
53.415802
]
]
]
}
View road section coordinates
[
[
[
-2.654459,
53.414872
],
[
-2.654422,
53.414875
],
[
-2.65331,
53.414959
],
[
-2.65276,
53.415003
],
[
-2.65276,
53.415003
],
[
-2.652169,
53.415092
],
[
-2.650202,
53.415385
],
[
-2.648512,
53.415594
],
[
-2.648323,
53.415624
],
[
-2.648081,
53.415684
],
[
-2.647965,
53.415733
],
[
-2.647873,
53.415782
],
[
-2.647845,
53.415802
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 16, 2026 11:39 PM
- Record versioned
- Fri, Jul 17, 2026 6:39 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 31 to Jct 38 hard shoulder IPV ( 124/4-177/3)
Planned Roadworks National HighwaysExpected to clear in 4 hours 22 minutes
M62 eastbound Jct 31 to Jct 38 hard shoulder IPV ( 124/4-177/3)
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)
M62 eastbound Jct 27 exit slip Lane 2 closure
Planned Roadworks National HighwaysStarts in 9 hours 52 minutes
M62 eastbound Jct 27 exit slip Lane 2 closure
M62 eastbound Jct 26 to Jct 27 Lane 1 and 2 closure (104/5 106/2)
Planned Roadworks National HighwaysStarts in 9 hours 52 minutes
M62 eastbound Jct 26 to Jct 27 Lane 1 and 2 closure (104/5 106/2)
M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)
Planned Roadworks National HighwaysStarts in 9 hours 52 minutes
M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)
M62 Eastbound lanes 1 and 2 closure (MP 27/6 to 29/3)
Planned Roadworks National HighwaysStarts in 9 hours 52 minutes
M62 Eastbound lanes 1 and 2 closure (MP 27/6 to 29/3)