M62 Eastbound Jct 8 exit slip road lane 1 closure

Cleared

M62 Eastbound Jct 8 exit slip road lane 1 closure

Start time
Fri, Jul 17, 2026 7:00 PM
Expected end
Sat, Jul 18, 2026 4:00 AM
Duration
5 minutes 2 seconds
Road
M62 – M62 Eastbound Between J7 And J8
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 1 closed, 1 of 3 lanes affected, 1 of 1 lanes affected
Reason
Tree And Vegetation Cutting Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Jul 16, 2026 11:39 PM
Last updated
Fri, Jul 17, 2026 6:39 PM
Cleared
Fri, Jul 17, 2026 7:05 PM
  • Latest update: M62 Eastbound Jct 8 exit slip road lane 1 closure
Coordinates
53.415339, -2.650668
Latitude span
53.414872 – 53.415802
Longitude span
-2.654459 – -2.647845
Bounding box centre
53.415337, -2.651152
Location descriptions
  • M62 eastbound between J7 and J8
  • M62 J8 eastbound exit
Feed validity status
Planned
Overall feed start
Fri, Jul 17, 2026 7:00 PM
Overall feed end
Sat, Jul 18, 2026 4:00 AM
Feed window length
9 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

4 coordinate pairs
Description
M62 eastbound between J7 and J8
Carriageway
Dual Carriageway
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{AC6A9BD7-C92A-4FED-9191-D5D5213E644D}
Linear Element Type
A Carriageway
From Distance
1,175 m
To Distance
1,289 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.414872 -2.654459
53.414875 -2.654422
53.414959 -2.65331
53.415003 -2.65276

Segment 2

9 coordinate pairs
Description
M62 J8 eastbound exit
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{49EA6E94-0213-4DB2-94BC-D6ABA2FA95C9}
Linear Element Type
A Carriageway Exit Slip
From Distance
0 m
To Distance
340 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.415003 -2.65276
53.415092 -2.652169
53.415385 -2.650202
53.415594 -2.648512
53.415624 -2.648323
53.415684 -2.648081
53.415733 -2.647965
53.415782 -2.647873
53.415802 -2.647845
Geometry type
MultiLineString
Geometry points
13
First coordinate pair
-2.654459, 53.414872
Road section segments
1
Road section points
13
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.654459,
                53.414872
            ],
            [
                -2.654422,
                53.414875
            ],
            [
                -2.65331,
                53.414959
            ],
            [
                -2.65276,
                53.415003
            ],
            [
                -2.65276,
                53.415003
            ],
            [
                -2.652169,
                53.415092
            ],
            [
                -2.650202,
                53.415385
            ],
            [
                -2.648512,
                53.415594
            ],
            [
                -2.648323,
                53.415624
            ],
            [
                -2.648081,
                53.415684
            ],
            [
                -2.647965,
                53.415733
            ],
            [
                -2.647873,
                53.415782
            ],
            [
                -2.647845,
                53.415802
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.654459,
            53.414872
        ],
        [
            -2.654422,
            53.414875
        ],
        [
            -2.65331,
            53.414959
        ],
        [
            -2.65276,
            53.415003
        ],
        [
            -2.65276,
            53.415003
        ],
        [
            -2.652169,
            53.415092
        ],
        [
            -2.650202,
            53.415385
        ],
        [
            -2.648512,
            53.415594
        ],
        [
            -2.648323,
            53.415624
        ],
        [
            -2.648081,
            53.415684
        ],
        [
            -2.647965,
            53.415733
        ],
        [
            -2.647873,
            53.415782
        ],
        [
            -2.647845,
            53.415802
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Thu, Jul 16, 2026 11:39 PM
Record versioned
Fri, Jul 17, 2026 6:39 PM
Coordinate source
Geometry

Driving on the M62? See every live closure, roadwork and planned restriction on this road.

M62 live closures

Related incidents

M62 eastbound Jct 31 to Jct 38 hard shoulder IPV ( 124/4-177/3)

Planned Roadworks National Highways
Selby M62 · M62 Eastbound Within J32

Expected to clear in 4 hours 22 minutes

Started 3 Aug 2026, 08:30 Expected clear 3 Aug 2026, 14:30

M62 eastbound Jct 31 to Jct 38 hard shoulder IPV ( 124/4-177/3)

Category: Road Maintenance
View update

M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)

Active Roadworks National Highways
St. Helens M6 · M6 Southbound Between J23 And J22

Expected to clear in 1 year 7 months

Started 5 Apr 2026, 19:35 Expected clear 31 Mar 2028, 22:59

M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)

Category: Road Maintenance
View update

M62 eastbound Jct 27 exit slip Lane 2 closure

Planned Roadworks National Highways
Bradford M62 · M62 Eastbound Between J26 And J27

Starts in 9 hours 52 minutes

Starts 3 Aug 2026, 20:00 Expected clear 4 Aug 2026, 04:00

M62 eastbound Jct 27 exit slip Lane 2 closure

Category: Road Maintenance
View update

M62 eastbound Jct 26 to Jct 27 Lane 1 and 2 closure (104/5 106/2)

Planned Roadworks National Highways
Bradford M62 · M62 Eastbound Between J26 And J27

Starts in 9 hours 52 minutes

Starts 3 Aug 2026, 20:00 Expected clear 4 Aug 2026, 04:00

M62 eastbound Jct 26 to Jct 27 Lane 1 and 2 closure (104/5 106/2)

Category: Road Maintenance
View update

M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)

Planned Roadworks National Highways
Bradford M62 · M62 Eastbound Within J27

Starts in 9 hours 52 minutes

Starts 3 Aug 2026, 20:00 Expected clear 4 Aug 2026, 04:00

M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)

Category: Road Maintenance
View update

M62 Eastbound lanes 1 and 2 closure (MP 27/6 to 29/3)

Planned Roadworks National Highways
Warrington M62 · M62 Eastbound Between J9 And J10

Starts in 9 hours 52 minutes

Starts 3 Aug 2026, 20:00 Expected clear 4 Aug 2026, 05:00

M62 Eastbound lanes 1 and 2 closure (MP 27/6 to 29/3)

Category: Road Maintenance
View update