M62 Eastbound Jct 8 entry slip road closure
ClearedM62 Eastbound Jct 8 entry slip road closure
- Start time
- Thu, Jul 23, 2026 8:40 PM
- Expected end
- Fri, Jul 24, 2026 4:00 AM
- Duration
- 1 hour 1 second
- Road
- M62 – M62 J8 Eastbound Access After Services Slip Road
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 23, 2026 8:40 PM
- Last updated
- Thu, Jul 23, 2026 9:08 PM
- Cleared
- Thu, Jul 23, 2026 9:40 PM
- Latest update: M62 Eastbound Jct 8 entry slip road closure
- Coordinates
- 53.416131, -2.644059
- Latitude span
- 53.415980 – 53.416367
- Longitude span
- -2.646028 – -2.641291
- Bounding box centre
- 53.416174, -2.643660
- Location descriptions
-
- M62 J8 eastbound access after services slip road
- M62 J8 eastbound access before services slip road
- Feed validity status
- Active
- Overall feed start
- Thu, Jul 23, 2026 8:40 PM
- Overall feed end
- Fri, Jul 24, 2026 4:00 AM
- Feed window length
- 7 hours 20 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M62 J8 eastbound access after services slip road
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {E44B7715-971D-4C0B-B4F7-F5253320D240}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 202 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.416094 -2.644306 53.41623 -2.642826 53.416347 -2.641463 53.416367 -2.641291
Segment 2
5 coordinate pairs- Description
- M62 J8 eastbound access before services slip road
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E82063A-7717-4E62-96AD-D49C624EED9F}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 3 m
- To Distance
- 120 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.416047 -2.646028 53.41598 -2.64577 53.415995 -2.645447 53.416027 -2.645092 53.416094 -2.644306
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -2.644306, 53.416094
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.644306,
53.416094
],
[
-2.642826,
53.41623
],
[
-2.641463,
53.416347
],
[
-2.641291,
53.416367
],
[
-2.646028,
53.416047
],
[
-2.64577,
53.41598
],
[
-2.645447,
53.415995
],
[
-2.645092,
53.416027
],
[
-2.644306,
53.416094
]
]
]
}
View road section coordinates
[
[
[
-2.644306,
53.416094
],
[
-2.642826,
53.41623
],
[
-2.641463,
53.416347
],
[
-2.641291,
53.416367
],
[
-2.646028,
53.416047
],
[
-2.64577,
53.41598
],
[
-2.645447,
53.415995
],
[
-2.645092,
53.416027
],
[
-2.644306,
53.416094
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 23, 2026 8:40 PM
- Record versioned
- Thu, Jul 23, 2026 9:08 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 1 week
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 westbound to M6 Southbound link road closure
Cleared Roadworks National HighwaysCleared 20 hours 12 minutes ago
M62 westbound to M6 Southbound link road closure
M62 eastbound Jct 36 to Jct 37 lane 1 closure ( 161/2-163/6)
Cleared Roadworks National HighwaysCleared 21 hours 12 minutes ago
M62 eastbound Jct 36 to Jct 37 lane 1 closure ( 161/2-163/6)
M62 eastbound Jct 25 to Jct 26 lane 4 closure ( 96/4 100/4)
Cleared Roadworks National HighwaysCleared 1 day 18 hours ago
M62 eastbound Jct 25 to Jct 26 lane 4 closure ( 96/4 100/4)