M62 Eastbound Jct 7 entry slip road closure
ClearedM62 Eastbound Jct 7 entry slip road closure
- Start time
- Mon, Sep 21, 2026 8:00 PM
- Expected end
- Tue, Sep 22, 2026 5:00 AM
- Duration
- 1 second
- Road
- M62 – M62 J7 Eastbound Access
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 21, 2026 4:19 AM
- Last updated
- Mon, Sep 21, 2026 11:49 AM
- Cleared
- Mon, Sep 21, 2026 8:00 PM
- Latest update: M62 Eastbound Jct 7 entry slip road closure
- Coordinates
- 53.404559, -2.742150
- Latitude span
- 53.404301 – 53.405495
- Longitude span
- -2.744267 – -2.735836
- Bounding box centre
- 53.404898, -2.740052
- Location descriptions
-
- M62 J7 eastbound access
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 21, 2026 8:00 PM
- Overall feed end
- Tue, Sep 22, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M62 J7 eastbound access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {5EAB3A70-9B05-4137-A595-5ABCCB9B2018}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 544 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.404307 -2.743773 53.404318 -2.743548 53.404442 -2.742696 53.404524 -2.742156 53.404831 -2.740259 53.404981 -2.739294 53.405495 -2.735836
Segment 2
4 coordinate pairs- Description
- M62 J7 eastbound access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {396A8D22-E38E-42F0-962A-D328A1466C08}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 25 m
- To Distance
- 58 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.404325 -2.744267 53.404314 -2.744168 53.404301 -2.743879 53.404307 -2.743773
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- -2.743773, 53.404307
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.743773,
53.404307
],
[
-2.743548,
53.404318
],
[
-2.742696,
53.404442
],
[
-2.742156,
53.404524
],
[
-2.740259,
53.404831
],
[
-2.739294,
53.404981
],
[
-2.735836,
53.405495
],
[
-2.744267,
53.404325
],
[
-2.744168,
53.404314
],
[
-2.743879,
53.404301
],
[
-2.743773,
53.404307
]
]
]
}
View road section coordinates
[
[
[
-2.743773,
53.404307
],
[
-2.743548,
53.404318
],
[
-2.742696,
53.404442
],
[
-2.742156,
53.404524
],
[
-2.740259,
53.404831
],
[
-2.739294,
53.404981
],
[
-2.735836,
53.405495
],
[
-2.744267,
53.404325
],
[
-2.744168,
53.404314
],
[
-2.743879,
53.404301
],
[
-2.743773,
53.404307
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Sep 21, 2026 4:19 AM
- Record versioned
- Mon, Sep 21, 2026 11:49 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
Active Roadworks National HighwaysExpected to clear in 1 week 6 days
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 5 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Planned Roadworks National HighwaysStarts in 7 hours 47 seconds
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
Planned Roadworks National HighwaysStarts in 7 hours 47 seconds
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Planned Roadworks National HighwaysStarts in 7 hours 47 seconds
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
Planned Roadworks National HighwaysStarts in 6 hours 47 seconds
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)