M62 eastbound Jct 37 to Jct 38 lane 1 and 2 closure (168/4 to 169/7)
ClearedM62 eastbound Jct 37 to Jct 38 lane 1 and 2 closure (168/4 to 169/7)
- Start time
- Mon, Sep 28, 2026 7:00 PM
- Expected end
- Tue, Sep 29, 2026 5:00 AM
- Duration
- 45 minutes 2 seconds
- Road
- M62 – M62 Eastbound Between J37 And J38
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 21, 2026 7:54 AM
- Last updated
- Mon, Sep 28, 2026 7:09 PM
- Cleared
- Mon, Sep 28, 2026 7:45 PM
- Latest update: M62 eastbound Jct 37 to Jct 38 lane 1 and 2 closure (168/4 to 169/7)
- Coordinates
- 53.749547, -0.791803
- Latitude span
- 53.747085 – 53.751889
- Longitude span
- -0.813071 – -0.776759
- Bounding box centre
- 53.749487, -0.794915
- Location descriptions
-
- M62 eastbound between J37 and J38
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 28, 2026 7:00 PM
- Overall feed end
- Tue, Sep 29, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M62 eastbound between J37 and J38
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {707C0BE1-4436-4F0A-8B17-56AA47421518}
- Linear Element Type
- A Carriageway
- From Distance
- 176 m
- To Distance
- 607 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.747085 -0.813071 53.747289 -0.811125 53.747734 -0.807018 53.747775 -0.806637
Segment 2
15 coordinate pairs- Description
- M62 eastbound between J37 and J38
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {939585F6-3455-466C-93BA-36411E304F95}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 1,533 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.747775 -0.806637 53.747791 -0.806485 53.748103 -0.803519 53.74844 -0.800295 53.748908 -0.795914 53.749039 -0.794606 53.749211 -0.792994 53.749236 -0.792793 53.749295 -0.792324 53.749499 -0.790347 53.749744 -0.788308 53.749969 -0.786604 53.75023 -0.784828 53.750341 -0.784129 53.750399 -0.783825
Segment 3
8 coordinate pairs- Description
- M62 eastbound between J37 and J38
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {6BED58A9-B577-48B7-84C4-638FE3BD5A3E}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 494 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.750399 -0.783825 53.750846 -0.781355 53.750978 -0.780694 53.751051 -0.780341 53.751167 -0.779834 53.751677 -0.77765 53.751887 -0.776764 53.751889 -0.776759
- Geometry type
- MultiLineString
- Geometry points
- 27
- First coordinate pair
- -0.813071, 53.747085
- Road section segments
- 1
- Road section points
- 27
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.813071,
53.747085
],
[
-0.811125,
53.747289
],
[
-0.807018,
53.747734
],
[
-0.806637,
53.747775
],
[
-0.806637,
53.747775
],
[
-0.806485,
53.747791
],
[
-0.803519,
53.748103
],
[
-0.800295,
53.74844
],
[
-0.795914,
53.748908
],
[
-0.794606,
53.749039
],
[
-0.792994,
53.749211
],
[
-0.792793,
53.749236
],
[
-0.792324,
53.749295
],
[
-0.790347,
53.749499
],
[
-0.788308,
53.749744
],
[
-0.786604,
53.749969
],
[
-0.784828,
53.75023
],
[
-0.784129,
53.750341
],
[
-0.783825,
53.750399
],
[
-0.783825,
53.750399
],
[
-0.781355,
53.750846
],
[
-0.780694,
53.750978
],
[
-0.780341,
53.751051
],
[
-0.779834,
53.751167
],
[
-0.77765,
53.751677
],
[
-0.776764,
53.751887
],
[
-0.776759,
53.751889
]
]
]
}
View road section coordinates
[
[
[
-0.813071,
53.747085
],
[
-0.811125,
53.747289
],
[
-0.807018,
53.747734
],
[
-0.806637,
53.747775
],
[
-0.806637,
53.747775
],
[
-0.806485,
53.747791
],
[
-0.803519,
53.748103
],
[
-0.800295,
53.74844
],
[
-0.795914,
53.748908
],
[
-0.794606,
53.749039
],
[
-0.792994,
53.749211
],
[
-0.792793,
53.749236
],
[
-0.792324,
53.749295
],
[
-0.790347,
53.749499
],
[
-0.788308,
53.749744
],
[
-0.786604,
53.749969
],
[
-0.784828,
53.75023
],
[
-0.784129,
53.750341
],
[
-0.783825,
53.750399
],
[
-0.783825,
53.750399
],
[
-0.781355,
53.750846
],
[
-0.780694,
53.750978
],
[
-0.780341,
53.751051
],
[
-0.779834,
53.751167
],
[
-0.77765,
53.751677
],
[
-0.776764,
53.751887
],
[
-0.776759,
53.751889
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Sep 21, 2026 7:54 AM
- Record versioned
- Mon, Sep 28, 2026 7:09 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
Active Roadworks National HighwaysExpected to clear in 1 week 6 days
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 5 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Planned Roadworks National HighwaysStarts in 2 hours 54 minutes
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
Planned Roadworks National HighwaysStarts in 2 hours 54 minutes
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Planned Roadworks National HighwaysStarts in 2 hours 54 minutes
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
Planned Roadworks National HighwaysStarts in 1 hour 54 minutes
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)