M62 eastbound Jct 36 to Jct 37 Lane 1 closure (161/3 163/2)
ClearedM62 eastbound Jct 36 to Jct 37 Lane 1 closure (161/3 163/2)
- Start time
- Fri, Oct 9, 2026 8:30 AM
- Expected end
- Fri, Oct 9, 2026 2:30 PM
- Duration
- 4 hours 2 seconds
- Road
- M62 – M62 Eastbound Between J36 And J37
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 8, 2026 1:03 PM
- Last updated
- Fri, Oct 9, 2026 12:03 PM
- Cleared
- Fri, Oct 9, 2026 12:30 PM
- Latest update: M62 eastbound Jct 36 to Jct 37 Lane 1 closure (161/3 163/2)
- Coordinates
- 53.724745, -0.879110
- Latitude span
- 53.717798 – 53.730682
- Longitude span
- -0.887916 – -0.871627
- Bounding box centre
- 53.724240, -0.879772
- Location descriptions
-
- M62 eastbound between J36 and J37
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 9, 2026 8:30 AM
- Overall feed end
- Fri, Oct 9, 2026 2:30 PM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M62 eastbound between J36 and J37
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {E97FB1B5-09FA-4CA2-8951-DCD0FB2A4ACD}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 298 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.723626 -0.880524 53.724061 -0.879981 53.725171 -0.878573 53.725553 -0.878108 53.725775 -0.877811
Segment 2
7 coordinate pairs- Description
- M62 eastbound between J36 and J37
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {09EDB755-DB59-4890-A84B-66CF4ACDBCA4}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 540 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.725775 -0.877811 53.725775 -0.87781 53.725784 -0.877798 53.727214 -0.875995 53.728609 -0.874237 53.729667 -0.872909 53.72967 -0.872905
Segment 3
3 coordinate pairs- Description
- M62 eastbound between J36 and J37
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {687733BC-D7D2-44DC-A247-92CECAF44DF3}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 140 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.72967 -0.872905 53.729719 -0.872843 53.730682 -0.871627
Segment 4
8 coordinate pairs- Description
- M62 eastbound between J36 and J37
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {402E529A-E142-4529-A0E3-2A822895C4F1}
- Linear Element Type
- A Carriageway
- From Distance
- 256 m
- To Distance
- 989 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.717798 -0.887916 53.718863 -0.886499 53.719458 -0.885741 53.720444 -0.884518 53.72122 -0.883542 53.721946 -0.882629 53.722399 -0.882071 53.723057 -0.881236
Segment 5
2 coordinate pairs- Description
- M62 eastbound between J36 and J37
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {723F25EA-F7F1-4B0B-8217-EBD38113B21B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 78 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.723057 -0.881236 53.723626 -0.880524
- Geometry type
- MultiLineString
- Geometry points
- 25
- First coordinate pair
- -0.880524, 53.723626
- Road section segments
- 1
- Road section points
- 25
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.880524,
53.723626
],
[
-0.879981,
53.724061
],
[
-0.878573,
53.725171
],
[
-0.878108,
53.725553
],
[
-0.877811,
53.725775
],
[
-0.877811,
53.725775
],
[
-0.87781,
53.725775
],
[
-0.877798,
53.725784
],
[
-0.875995,
53.727214
],
[
-0.874237,
53.728609
],
[
-0.872909,
53.729667
],
[
-0.872905,
53.72967
],
[
-0.872905,
53.72967
],
[
-0.872843,
53.729719
],
[
-0.871627,
53.730682
],
[
-0.887916,
53.717798
],
[
-0.886499,
53.718863
],
[
-0.885741,
53.719458
],
[
-0.884518,
53.720444
],
[
-0.883542,
53.72122
],
[
-0.882629,
53.721946
],
[
-0.882071,
53.722399
],
[
-0.881236,
53.723057
],
[
-0.881236,
53.723057
],
[
-0.880524,
53.723626
]
]
]
}
View road section coordinates
[
[
[
-0.880524,
53.723626
],
[
-0.879981,
53.724061
],
[
-0.878573,
53.725171
],
[
-0.878108,
53.725553
],
[
-0.877811,
53.725775
],
[
-0.877811,
53.725775
],
[
-0.87781,
53.725775
],
[
-0.877798,
53.725784
],
[
-0.875995,
53.727214
],
[
-0.874237,
53.728609
],
[
-0.872909,
53.729667
],
[
-0.872905,
53.72967
],
[
-0.872905,
53.72967
],
[
-0.872843,
53.729719
],
[
-0.871627,
53.730682
],
[
-0.887916,
53.717798
],
[
-0.886499,
53.718863
],
[
-0.885741,
53.719458
],
[
-0.884518,
53.720444
],
[
-0.883542,
53.72122
],
[
-0.882629,
53.721946
],
[
-0.882071,
53.722399
],
[
-0.881236,
53.723057
],
[
-0.881236,
53.723057
],
[
-0.880524,
53.723626
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Oct 8, 2026 1:03 PM
- Record versioned
- Fri, Oct 9, 2026 12:03 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
Active Roadworks National HighwaysExpected to clear in 1 week 6 days
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Planned Roadworks National HighwaysStarts in 4 hours 40 minutes
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
Planned Roadworks National HighwaysStarts in 4 hours 40 minutes
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Planned Roadworks National HighwaysStarts in 4 hours 40 minutes
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
Planned Roadworks National HighwaysStarts in 3 hours 40 minutes
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
M62 eastbound Jct 25 entry slip lane closure
Planned Roadworks National HighwaysStarts in 2 hours 40 minutes
M62 eastbound Jct 25 entry slip lane closure