M62 Eastbound Jct 30 entry slip lane 1 closure
ClearedM62 Eastbound Jct 30 entry slip lane 1 closure
- Start time
- Fri, Jul 31, 2026 7:00 PM
- Expected end
- Sat, Aug 1, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M62 – M62 Eastbound Between J30 And J31
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected, 1 of 1 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sat, Aug 1, 2026 1:16 AM
- Last updated
- Sat, Aug 1, 2026 4:43 AM
- Cleared
- Sat, Aug 1, 2026 5:00 AM
- Latest update: M62 Eastbound Jct 30 entry slip lane 1 closure
- Coordinates
- 53.728759, -1.452840
- Latitude span
- 53.728621 – 53.729086
- Longitude span
- -1.457112 – -1.446730
- Bounding box centre
- 53.728854, -1.451921
- Location descriptions
-
- M62 eastbound between J30 and J31
- M62 J30 eastbound access
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 31, 2026 7:00 PM
- Overall feed end
- Sat, Aug 1, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M62 eastbound between J30 and J31
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {32414576-7E73-47AB-8845-9884F34BA99B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 122 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.728661 -1.448578 53.72866 -1.448559 53.728676 -1.44674 53.728676 -1.44673
Segment 2
15 coordinate pairs- Description
- M62 J30 eastbound access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {EB735AC0-5649-45E3-BAF7-745A64A66E2C}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 9 m
- To Distance
- 354 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.729086 -1.457112 53.729067 -1.457042 53.728967 -1.456771 53.728903 -1.456559 53.728838 -1.456151 53.72881 -1.455939 53.72881 -1.455833 53.728809 -1.455727 53.728798 -1.455212 53.728735 -1.453212 53.728714 -1.452681 53.728714 -1.452575 53.728686 -1.452379 53.728681 -1.452348 53.728621 -1.452001
Segment 3
4 coordinate pairs- Description
- M62 eastbound between J30 and J31
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {F9F5331B-D121-4514-A9A0-DD974EB18827}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 225 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.728621 -1.452001 53.728621 -1.451849 53.728652 -1.450742 53.728661 -1.448578
- Geometry type
- MultiLineString
- Geometry points
- 23
- First coordinate pair
- -1.448578, 53.728661
- Road section segments
- 1
- Road section points
- 23
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.448578,
53.728661
],
[
-1.448559,
53.72866
],
[
-1.44674,
53.728676
],
[
-1.44673,
53.728676
],
[
-1.457112,
53.729086
],
[
-1.457042,
53.729067
],
[
-1.456771,
53.728967
],
[
-1.456559,
53.728903
],
[
-1.456151,
53.728838
],
[
-1.455939,
53.72881
],
[
-1.455833,
53.72881
],
[
-1.455727,
53.728809
],
[
-1.455212,
53.728798
],
[
-1.453212,
53.728735
],
[
-1.452681,
53.728714
],
[
-1.452575,
53.728714
],
[
-1.452379,
53.728686
],
[
-1.452348,
53.728681
],
[
-1.452001,
53.728621
],
[
-1.452001,
53.728621
],
[
-1.451849,
53.728621
],
[
-1.450742,
53.728652
],
[
-1.448578,
53.728661
]
]
]
}
View road section coordinates
[
[
[
-1.448578,
53.728661
],
[
-1.448559,
53.72866
],
[
-1.44674,
53.728676
],
[
-1.44673,
53.728676
],
[
-1.457112,
53.729086
],
[
-1.457042,
53.729067
],
[
-1.456771,
53.728967
],
[
-1.456559,
53.728903
],
[
-1.456151,
53.728838
],
[
-1.455939,
53.72881
],
[
-1.455833,
53.72881
],
[
-1.455727,
53.728809
],
[
-1.455212,
53.728798
],
[
-1.453212,
53.728735
],
[
-1.452681,
53.728714
],
[
-1.452575,
53.728714
],
[
-1.452379,
53.728686
],
[
-1.452348,
53.728681
],
[
-1.452001,
53.728621
],
[
-1.452001,
53.728621
],
[
-1.451849,
53.728621
],
[
-1.450742,
53.728652
],
[
-1.448578,
53.728661
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sat, Aug 1, 2026 1:16 AM
- Record versioned
- Sat, Aug 1, 2026 4:43 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
Planned Roadworks National HighwaysStarts in 15 hours 50 minutes
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
M62 eastbound Jct 35 to M18 southbound Jct 7 carriageway closure
Planned Roadworks National HighwaysStarts in 14 hours 50 minutes
M62 eastbound Jct 35 to M18 southbound Jct 7 carriageway closure
M62 Eastbound lane 1 closure (MP 24/9 to 26/4)
Planned Roadworks National HighwaysStarts in 14 hours 50 minutes
M62 Eastbound lane 1 closure (MP 24/9 to 26/4)
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
Planned Roadworks National HighwaysStarts in 14 hours 50 minutes
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
M62 Eastbound Jct 10 exit slip road Lane 1 closure
Planned Roadworks National HighwaysStarts in 14 hours 50 minutes
M62 Eastbound Jct 10 exit slip road Lane 1 closure
M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)
Planned Roadworks National HighwaysStarts in 14 hours 50 minutes
M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)