M62 eastbound Jct 29 Lane 1 closure (117/1 118/0)
ClearedM62 eastbound Jct 29 Lane 1 closure (117/1 118/0)
- Start time
- Fri, Jul 10, 2026 7:00 PM
- Expected end
- Sat, Jul 11, 2026 5:00 AM
- Duration
- 7 hours 5 minutes 1 second
- Road
- M62 – M62 Eastbound Between J29 And J30
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 10, 2026 6:49 PM
- Last updated
- Sat, Jul 11, 2026 1:51 AM
- Cleared
- Sat, Jul 11, 2026 2:05 AM
- Latest update: M62 eastbound Jct 29 Lane 1 closure (117/1 118/0)
- Coordinates
- 53.728410, -1.496064
- Latitude span
- 53.728083 – 53.729076
- Longitude span
- -1.502717 – -1.488684
- Bounding box centre
- 53.728580, -1.495701
- Location descriptions
-
- M62 eastbound between J29 and J30
- Feed validity status
- Active
- Overall feed start
- Fri, Jul 10, 2026 7:00 PM
- Overall feed end
- Sat, Jul 11, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
12 coordinate pairs- Description
- M62 eastbound between J29 and J30
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {67A46E98-8465-4348-B5DA-FA9C487B7E45}
- Linear Element Type
- A Carriageway
- From Distance
- 118 m
- To Distance
- 545 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.729076 -1.502717 53.729048 -1.502559 53.729021 -1.502423 53.728854 -1.501304 53.728689 -1.500245 53.728642 -1.499942 53.728595 -1.499473 53.728474 -1.498504 53.728418 -1.497914 53.728385 -1.49752 53.728342 -1.49702 53.728295 -1.496399
Segment 2
11 coordinate pairs- Description
- M62 eastbound between J29 and J30
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {4D2264E0-5E1B-4DD2-9423-DEB4253AB518}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 510 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.728295 -1.496399 53.728276 -1.496142 53.728208 -1.495127 53.728159 -1.494143 53.728109 -1.492779 53.728085 -1.49137 53.728083 -1.491006 53.728085 -1.489642 53.728086 -1.489475 53.7281 -1.488687 53.7281 -1.488684
- Geometry type
- MultiLineString
- Geometry points
- 23
- First coordinate pair
- -1.502717, 53.729076
- Road section segments
- 1
- Road section points
- 23
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.502717,
53.729076
],
[
-1.502559,
53.729048
],
[
-1.502423,
53.729021
],
[
-1.501304,
53.728854
],
[
-1.500245,
53.728689
],
[
-1.499942,
53.728642
],
[
-1.499473,
53.728595
],
[
-1.498504,
53.728474
],
[
-1.497914,
53.728418
],
[
-1.49752,
53.728385
],
[
-1.49702,
53.728342
],
[
-1.496399,
53.728295
],
[
-1.496399,
53.728295
],
[
-1.496142,
53.728276
],
[
-1.495127,
53.728208
],
[
-1.494143,
53.728159
],
[
-1.492779,
53.728109
],
[
-1.49137,
53.728085
],
[
-1.491006,
53.728083
],
[
-1.489642,
53.728085
],
[
-1.489475,
53.728086
],
[
-1.488687,
53.7281
],
[
-1.488684,
53.7281
]
]
]
}
View road section coordinates
[
[
[
-1.502717,
53.729076
],
[
-1.502559,
53.729048
],
[
-1.502423,
53.729021
],
[
-1.501304,
53.728854
],
[
-1.500245,
53.728689
],
[
-1.499942,
53.728642
],
[
-1.499473,
53.728595
],
[
-1.498504,
53.728474
],
[
-1.497914,
53.728418
],
[
-1.49752,
53.728385
],
[
-1.49702,
53.728342
],
[
-1.496399,
53.728295
],
[
-1.496399,
53.728295
],
[
-1.496142,
53.728276
],
[
-1.495127,
53.728208
],
[
-1.494143,
53.728159
],
[
-1.492779,
53.728109
],
[
-1.49137,
53.728085
],
[
-1.491006,
53.728083
],
[
-1.489642,
53.728085
],
[
-1.489475,
53.728086
],
[
-1.488687,
53.7281
],
[
-1.488684,
53.7281
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 12
- Record created
- Fri, Jul 10, 2026 6:49 PM
- Record versioned
- Sat, Jul 11, 2026 1:51 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Westbound Jct 9 entry slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 6 minutes
M62 Westbound Jct 9 entry slip road lane 1 closure
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 5 days
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M1 southbound Jct 40 entry slip road closure
Planned Roadworks National HighwaysStarts in 16 hours 6 minutes
M1 southbound Jct 40 entry slip road closure
M62 westbound Jct 37 entry slip lane closure
Planned Roadworks National HighwaysStarts in 16 hours 6 minutes
M62 westbound Jct 37 entry slip lane closure
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
Planned Roadworks National HighwaysStarts in 16 hours 6 minutes
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)