M62 eastbound Jct 28 to Jct 29 Lane 1 and 2 closure (112/8 114/6)
ClearedM62 eastbound Jct 28 to Jct 29 Lane 1 and 2 closure (112/8 114/6)
- Start time
- Wed, Oct 7, 2026 7:00 PM
- Expected end
- Thu, Oct 8, 2026 5:00 AM
- Duration
- 1 second
- Road
- M62 – M62 Eastbound Between J28 And J29
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 5, 2026 7:44 PM
- Last updated
- Wed, Oct 7, 2026 9:05 AM
- Cleared
- Wed, Oct 7, 2026 7:00 PM
- Latest update: M62 eastbound Jct 28 to Jct 29 Lane 1 and 2 closure (112/8 114/6)
- Coordinates
- 53.733545, -1.550842
- Latitude span
- 53.733322 – 53.734041
- Longitude span
- -1.565378 – -1.538437
- Bounding box centre
- 53.733682, -1.551908
- Location descriptions
-
- M62 eastbound between J28 and J29
- Feed validity status
- Planned
- Overall feed start
- Wed, Oct 7, 2026 7:00 PM
- Overall feed end
- Thu, Oct 8, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
18 coordinate pairs- Description
- M62 eastbound between J28 and J29
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {AFAC3E7A-9423-4A38-81C2-1FF8DC669693}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 1,523 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.733439 -1.561429 53.733439 -1.561414 53.733426 -1.560384 53.733377 -1.554306 53.733375 -1.553699 53.733327 -1.548182 53.733326 -1.547833 53.733322 -1.546727 53.733338 -1.546317 53.733371 -1.545574 53.733438 -1.544164 53.733524 -1.543087 53.733645 -1.541782 53.733827 -1.540234 53.733976 -1.539141 53.734019 -1.5387 53.734019 -1.538685 53.734041 -1.538437
Segment 2
5 coordinate pairs- Description
- M62 eastbound between J28 and J29
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {B5BEE712-D8AF-4D87-8B7E-EF30A2A0A528}
- Linear Element Type
- A Carriageway
- From Distance
- 313 m
- To Distance
- 574 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.733476 -1.565378 53.733475 -1.56537 53.733471 -1.565219 53.73345 -1.561884 53.733439 -1.561429
- Geometry type
- MultiLineString
- Geometry points
- 23
- First coordinate pair
- -1.561429, 53.733439
- Road section segments
- 1
- Road section points
- 23
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.561429,
53.733439
],
[
-1.561414,
53.733439
],
[
-1.560384,
53.733426
],
[
-1.554306,
53.733377
],
[
-1.553699,
53.733375
],
[
-1.548182,
53.733327
],
[
-1.547833,
53.733326
],
[
-1.546727,
53.733322
],
[
-1.546317,
53.733338
],
[
-1.545574,
53.733371
],
[
-1.544164,
53.733438
],
[
-1.543087,
53.733524
],
[
-1.541782,
53.733645
],
[
-1.540234,
53.733827
],
[
-1.539141,
53.733976
],
[
-1.5387,
53.734019
],
[
-1.538685,
53.734019
],
[
-1.538437,
53.734041
],
[
-1.565378,
53.733476
],
[
-1.56537,
53.733475
],
[
-1.565219,
53.733471
],
[
-1.561884,
53.73345
],
[
-1.561429,
53.733439
]
]
]
}
View road section coordinates
[
[
[
-1.561429,
53.733439
],
[
-1.561414,
53.733439
],
[
-1.560384,
53.733426
],
[
-1.554306,
53.733377
],
[
-1.553699,
53.733375
],
[
-1.548182,
53.733327
],
[
-1.547833,
53.733326
],
[
-1.546727,
53.733322
],
[
-1.546317,
53.733338
],
[
-1.545574,
53.733371
],
[
-1.544164,
53.733438
],
[
-1.543087,
53.733524
],
[
-1.541782,
53.733645
],
[
-1.540234,
53.733827
],
[
-1.539141,
53.733976
],
[
-1.5387,
53.734019
],
[
-1.538685,
53.734019
],
[
-1.538437,
53.734041
],
[
-1.565378,
53.733476
],
[
-1.56537,
53.733475
],
[
-1.565219,
53.733471
],
[
-1.561884,
53.73345
],
[
-1.561429,
53.733439
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 5, 2026 7:44 PM
- Record versioned
- Wed, Oct 7, 2026 9:05 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Active Roadworks National HighwaysExpected to clear in 6 hours 33 minutes
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
Planned Roadworks National HighwaysExpected to clear in 6 hours 33 minutes
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
M62 eastbound Jct 34 to Jct 35 lane 1,2 closure (149/0 to 151/3)
Active Roadworks National HighwaysExpected to clear in 7 hours 33 minutes
M62 eastbound Jct 34 to Jct 35 lane 1,2 closure (149/0 to 151/3)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 5 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Cleared Roadworks National HighwaysCleared 26 minutes 26 seconds ago
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
Cleared Roadworks National HighwaysCleared 26 minutes 26 seconds ago
M62 eastbound Jct 29 carriageway closure between exit and entry slip road