M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)

Cleared

M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)

Start time
Mon, Aug 3, 2026 8:00 PM
Expected end
Tue, Aug 4, 2026 4:00 AM
Duration
2 seconds
Road
M62 – M62 Eastbound Within J27
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 1 closed, 1 of 3 lanes affected
Reason
Repair Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, Jul 14, 2026 10:32 AM
Last updated
Mon, Aug 3, 2026 10:51 AM
Cleared
Mon, Aug 3, 2026 8:00 PM
  • Latest update: M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)
Coordinates
53.746571, -1.648535
Latitude span
53.746039 – 53.747149
Longitude span
-1.651979 – -1.644839
Bounding box centre
53.746594, -1.648409
Location descriptions
  • M62 eastbound within J27
  • M62 eastbound between J26 and J27
Feed validity status
Planned
Overall feed start
Mon, Aug 3, 2026 8:00 PM
Overall feed end
Tue, Aug 4, 2026 4:00 AM
Feed window length
8 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

6 coordinate pairs
Description
M62 eastbound within J27
Carriageway
Dual Carriageway
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End2
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{80AB58EA-DDA7-4A55-B697-A687B53EFC1A}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
406 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.746234 -1.650801
53.746464 -1.64912
53.746493 -1.648938
53.746856 -1.64666
53.747099 -1.645142
53.747149 -1.644839

Segment 2

2 coordinate pairs
Description
M62 eastbound between J26 and J27
Carriageway
Dual Carriageway
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{A217E378-BCD6-4C7D-960B-74DAA02D5BD6}
Linear Element Type
A Carriageway
From Distance
726 m
To Distance
807 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.746039 -1.651979
53.746234 -1.650801
Geometry type
MultiLineString
Geometry points
8
First coordinate pair
-1.650801, 53.746234
Road section segments
1
Road section points
8
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -1.650801,
                53.746234
            ],
            [
                -1.64912,
                53.746464
            ],
            [
                -1.648938,
                53.746493
            ],
            [
                -1.64666,
                53.746856
            ],
            [
                -1.645142,
                53.747099
            ],
            [
                -1.644839,
                53.747149
            ],
            [
                -1.651979,
                53.746039
            ],
            [
                -1.650801,
                53.746234
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -1.650801,
            53.746234
        ],
        [
            -1.64912,
            53.746464
        ],
        [
            -1.648938,
            53.746493
        ],
        [
            -1.64666,
            53.746856
        ],
        [
            -1.645142,
            53.747099
        ],
        [
            -1.644839,
            53.747149
        ],
        [
            -1.651979,
            53.746039
        ],
        [
            -1.650801,
            53.746234
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Repair Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Tue, Jul 14, 2026 10:32 AM
Record versioned
Mon, Aug 3, 2026 10:51 AM
Coordinate source
Geometry

Driving on the M62? See every live closure, roadwork and planned restriction on this road.

M62 live closures

Related incidents

M62 Eastbound Jct 10 exit slip road Lane 1 closure

Active Roadworks National Highways
Warrington M62 · Link Road From M62 J10 Eastbound To M6 J21A

Expected to clear in 4 hours 44 minutes

Started 4 Aug 2026, 19:22 Expected clear 5 Aug 2026, 04:00

M62 Eastbound Jct 10 exit slip road Lane 1 closure

Category: Road Maintenance
View update

M62 Westbound Jct 9 entry slip road lane 1 closure

Planned Roadworks National Highways
St. Helens M62 · M62 J9 Westbound Access

Expected to clear in 4 hours 44 minutes

Started 4 Aug 2026, 19:00 Expected clear 5 Aug 2026, 04:00

M62 Westbound Jct 9 entry slip road lane 1 closure

Category: Road Maintenance
View update

M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)

Active Roadworks National Highways
St. Helens M62 · M62 Eastbound Between J6 And J7

Expected to clear in 1 year 7 months

Started 31 Mar 2026, 23:01 Expected clear 31 Mar 2028, 22:59

M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)

Category: Road Maintenance
View update

M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)

Active Roadworks National Highways
Oldham M62 · M62 Eastbound Between J20 And J21

Expected to clear in 2 months 5 days

Started 2 Oct 2025, 05:00 Expected clear 10 Oct 2026, 20:00

M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)

Category: Road Maintenance
View update

M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)

Cleared Roadworks National Highways
Trafford M62 · M62 Eastbound Between J11 And J12

Cleared 5 minutes 3 seconds ago

Started 4 Aug 2026, 20:12 Ended 4 Aug 2026, 23:10

M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)

Category: Road Maintenance
View update

M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)

Cleared Roadworks National Highways
Trafford M62 · M62 Eastbound Between J11 And J12

Cleared 2 hours 35 minutes ago

Started 4 Aug 2026, 20:00 Ended 4 Aug 2026, 20:40

M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)

Category: Road Maintenance
View update