M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)
ClearedM62 eastbound Jct 27 Lane 1 closure (106/2 106/7)
- Start time
- Wed, Jul 8, 2026 8:00 PM
- Expected end
- Thu, Jul 9, 2026 4:00 AM
- Duration
- 1 hour 55 minutes 1 second
- Road
- M62 – M62 Eastbound Between J26 And J27
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 8, 2026 8:03 PM
- Last updated
- Wed, Jul 8, 2026 9:22 PM
- Cleared
- Wed, Jul 8, 2026 9:55 PM
- Latest update: M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)
- Coordinates
- 53.746571, -1.648535
- Latitude span
- 53.746039 – 53.747149
- Longitude span
- -1.651979 – -1.644839
- Bounding box centre
- 53.746594, -1.648409
- Location descriptions
-
- M62 eastbound between J26 and J27
- M62 eastbound within J27
- Feed validity status
- Active
- Overall feed start
- Wed, Jul 8, 2026 8:00 PM
- Overall feed end
- Thu, Jul 9, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M62 eastbound between J26 and J27
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {A217E378-BCD6-4C7D-960B-74DAA02D5BD6}
- Linear Element Type
- A Carriageway
- From Distance
- 726 m
- To Distance
- 807 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.746039 -1.651979 53.746234 -1.650801
Segment 2
6 coordinate pairs- Description
- M62 eastbound within J27
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {80AB58EA-DDA7-4A55-B697-A687B53EFC1A}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 406 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.746234 -1.650801 53.746464 -1.64912 53.746493 -1.648938 53.746856 -1.64666 53.747099 -1.645142 53.747149 -1.644839
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -1.651979, 53.746039
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.651979,
53.746039
],
[
-1.650801,
53.746234
],
[
-1.650801,
53.746234
],
[
-1.64912,
53.746464
],
[
-1.648938,
53.746493
],
[
-1.64666,
53.746856
],
[
-1.645142,
53.747099
],
[
-1.644839,
53.747149
]
]
]
}
View road section coordinates
[
[
[
-1.651979,
53.746039
],
[
-1.650801,
53.746234
],
[
-1.650801,
53.746234
],
[
-1.64912,
53.746464
],
[
-1.648938,
53.746493
],
[
-1.64666,
53.746856
],
[
-1.645142,
53.747099
],
[
-1.644839,
53.747149
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Jul 8, 2026 8:03 PM
- Record versioned
- Wed, Jul 8, 2026 9:22 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound Jct 10 exit slip road Lane 1 closure
Active Roadworks National HighwaysExpected to clear in 4 hours 23 minutes
M62 Eastbound Jct 10 exit slip road Lane 1 closure
M62 Westbound Jct 9 entry slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 4 hours 23 minutes
M62 Westbound Jct 9 entry slip road lane 1 closure
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 5 days
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
Cleared Roadworks National HighwaysCleared 26 minutes 20 seconds ago
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
Cleared Roadworks National HighwaysCleared 2 hours 56 minutes ago
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)