M62 eastbound Jct 27 Lane 1 and 2 closure (106/5 107/3)
ClearedM62 eastbound Jct 27 Lane 1 and 2 closure (106/5 107/3)
- Start time
- Mon, Jul 13, 2026 7:00 PM
- Expected end
- Tue, Jul 14, 2026 4:00 AM
- Duration
- 1 second
- Road
- M62 – M62 Eastbound Within J27
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 9, 2026 12:48 PM
- Last updated
- Mon, Jul 13, 2026 5:54 PM
- Cleared
- Mon, Jul 13, 2026 7:00 PM
- Latest update: M62 eastbound Jct 27 Lane 1 and 2 closure (106/5 107/3)
- Coordinates
- 53.747576, -1.636862
- Latitude span
- 53.747423 – 53.747656
- Longitude span
- -1.637701 – -1.635592
- Bounding box centre
- 53.747540, -1.636647
- Location descriptions
-
- M62 eastbound within J27
- Feed validity status
- Planned
- Overall feed start
- Mon, Jul 13, 2026 7:00 PM
- Overall feed end
- Tue, Jul 14, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M62 eastbound within J27
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {6AB7D76E-802A-48D8-AF27-06A05FB531C9}
- Linear Element Type
- A Carriageway
- From Distance
- 8 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.747656 -1.637701 53.747652 -1.637586
Segment 2
7 coordinate pairs- Description
- M62 eastbound within J27
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {22E43814-8032-4716-BDDC-112419DAF050}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 134 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.747652 -1.637586 53.747652 -1.637555 53.747623 -1.637192 53.747595 -1.636843 53.747503 -1.63607 53.74743 -1.635631 53.747423 -1.635592
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -1.637701, 53.747656
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.637701,
53.747656
],
[
-1.637586,
53.747652
],
[
-1.637586,
53.747652
],
[
-1.637555,
53.747652
],
[
-1.637192,
53.747623
],
[
-1.636843,
53.747595
],
[
-1.63607,
53.747503
],
[
-1.635631,
53.74743
],
[
-1.635592,
53.747423
]
]
]
}
View road section coordinates
[
[
[
-1.637701,
53.747656
],
[
-1.637586,
53.747652
],
[
-1.637586,
53.747652
],
[
-1.637555,
53.747652
],
[
-1.637192,
53.747623
],
[
-1.636843,
53.747595
],
[
-1.63607,
53.747503
],
[
-1.635631,
53.74743
],
[
-1.635592,
53.747423
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Jul 9, 2026 12:48 PM
- Record versioned
- Mon, Jul 13, 2026 5:54 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound jct 34 to Jct 38 (141/8-177/8) hard shoulder IPV
Planned Roadworks National HighwaysExpected to clear in 8 hours 38 minutes
M62 eastbound jct 34 to Jct 38 (141/8-177/8) hard shoulder IPV
M62 eastbound Jct 26 Lane 3 closure (100/4 101/9)
Cleared Roadworks National HighwaysExpected to clear in 21 hours 38 minutes
M62 eastbound Jct 26 Lane 3 closure (100/4 101/9)
M62 westbound Jct 37 entry slip lane closure
Planned Roadworks National HighwaysStarts in 11 hours 38 minutes
M62 westbound Jct 37 entry slip lane closure
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
Planned Roadworks National HighwaysStarts in 11 hours 38 minutes
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
M62 Eastbound lane 1 closure (MP 31/8 to 33/4)
Planned Roadworks National HighwaysStarts in 11 hours 38 minutes
M62 Eastbound lane 1 closure (MP 31/8 to 33/4)
M62 Eastbound Jct 10 exit slip road Lane 1 closure
Planned Roadworks National HighwaysStarts in 11 hours 38 minutes
M62 Eastbound Jct 10 exit slip road Lane 1 closure