M62 eastbound Jct 27 exit slip Lane 2 closure

Planned

M62 eastbound Jct 27 exit slip Lane 2 closure

Start time
Mon, Aug 3, 2026 8:00 PM
Expected end
Tue, Aug 4, 2026 4:00 AM
Duration
8 hours
Road
M62 – M62 Eastbound Between J26 And J27
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 3 lanes affected
Reason
Repair Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, Jul 14, 2026 10:32 AM
Last updated
Mon, Aug 3, 2026 5:32 AM
Cleared
Tue, Aug 4, 2026 4:00 AM
  • Latest update: M62 eastbound Jct 27 exit slip Lane 2 closure
Coordinates
53.745203, -1.657136
Latitude span
53.743705 – 53.746442
Longitude span
-1.666294 – -1.649672
Bounding box centre
53.745074, -1.657983
Location descriptions
  • M62 eastbound between J26 and J27
  • link road from M62 J27 eastbound exit to M621 eastbound
Feed validity status
Planned
Overall feed start
Mon, Aug 3, 2026 8:00 PM
Overall feed end
Tue, Aug 4, 2026 4:00 AM
Feed window length
8 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
M62 eastbound between J26 and J27
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start2 End1
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{89CDAD06-3976-4624-8360-BDDCA99DAD75}
Linear Element Type
A Carriageway
From Distance
327 m
To Distance
580 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.743705 -1.666294
53.7443 -1.662602

Segment 2

2 coordinate pairs
Description
link road from M62 J27 eastbound exit to M621 eastbound
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M621
Linear Element Model
The Network Model
Linear Element Id
{923ED431-133A-44D8-AB7E-647165CBD5ED}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
77 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.746234 -1.650801
53.746442 -1.649672

Segment 3

6 coordinate pairs
Description
M62 eastbound between J26 and J27
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{A217E378-BCD6-4C7D-960B-74DAA02D5BD6}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
807 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.7443 -1.662602
53.744641 -1.66064
53.745017 -1.658317
53.745417 -1.655832
53.745739 -1.653794
53.746234 -1.650801
Geometry type
MultiLineString
Geometry points
10
First coordinate pair
-1.666294, 53.743705
Road section segments
1
Road section points
10
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -1.666294,
                53.743705
            ],
            [
                -1.662602,
                53.7443
            ],
            [
                -1.650801,
                53.746234
            ],
            [
                -1.649672,
                53.746442
            ],
            [
                -1.662602,
                53.7443
            ],
            [
                -1.66064,
                53.744641
            ],
            [
                -1.658317,
                53.745017
            ],
            [
                -1.655832,
                53.745417
            ],
            [
                -1.653794,
                53.745739
            ],
            [
                -1.650801,
                53.746234
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -1.666294,
            53.743705
        ],
        [
            -1.662602,
            53.7443
        ],
        [
            -1.650801,
            53.746234
        ],
        [
            -1.649672,
            53.746442
        ],
        [
            -1.662602,
            53.7443
        ],
        [
            -1.66064,
            53.744641
        ],
        [
            -1.658317,
            53.745017
        ],
        [
            -1.655832,
            53.745417
        ],
        [
            -1.653794,
            53.745739
        ],
        [
            -1.650801,
            53.746234
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Repair Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Tue, Jul 14, 2026 10:32 AM
Record versioned
Mon, Aug 3, 2026 5:32 AM
Coordinate source
Geometry

Driving on the M62? See every live closure, roadwork and planned restriction on this road.

M62 live closures

Related incidents

M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)

Active Roadworks National Highways
St. Helens M62 · M62 Eastbound Between J6 And J7

Expected to clear in 1 year 7 months

Started 31 Mar 2026, 23:01 Expected clear 31 Mar 2028, 22:59

M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)

Category: Road Maintenance
View update

M62 eastbound Jct 26 to Jct 27 Lane 1 and 2 closure (104/5 106/2)

Planned Roadworks National Highways
Bradford M62 · M62 Eastbound Between J26 And J27

Starts in 12 hours 57 minutes

Starts 3 Aug 2026, 20:00 Expected clear 4 Aug 2026, 04:00

M62 eastbound Jct 26 to Jct 27 Lane 1 and 2 closure (104/5 106/2)

Category: Road Maintenance
View update

M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)

Planned Roadworks National Highways
Bradford M62 · M62 Eastbound Within J27

Starts in 12 hours 57 minutes

Starts 3 Aug 2026, 20:00 Expected clear 4 Aug 2026, 04:00

M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)

Category: Road Maintenance
View update

M62 Eastbound lanes 1 and 2 closure (MP 27/6 to 29/3)

Planned Roadworks National Highways
Warrington M62 · M62 Eastbound Between J9 And J10

Starts in 12 hours 57 minutes

Starts 3 Aug 2026, 20:00 Expected clear 4 Aug 2026, 05:00

M62 Eastbound lanes 1 and 2 closure (MP 27/6 to 29/3)

Category: Road Maintenance
View update

M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)

Planned Roadworks National Highways
Calderdale M62 · M62 Eastbound Between J22 And J23

Starts in 11 hours 57 minutes

Starts 3 Aug 2026, 19:00 Expected clear 4 Aug 2026, 05:00

M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)

Category: Construction Work
View update

M62 westbound Jct 37 entry slip lane closure

Planned Roadworks National Highways
East Riding Of Yorkshire M62 · M62 Westbound Between J37 And J36

Starts in 11 hours 57 minutes

Starts 3 Aug 2026, 19:00 Expected clear 4 Aug 2026, 05:00

M62 westbound Jct 37 entry slip lane closure

Category: Road Maintenance
View update