M62 eastbound Jct 24 to Jct 25 hardshoulder closure (91/4 91/8)
ClearedM62 eastbound Jct 24 to Jct 25 hardshoulder closure (91/4 91/8)
- Start time
- Mon, Sep 28, 2026 8:00 AM
- Expected end
- Mon, Sep 28, 2026 2:00 PM
- Duration
- 6 hours
- Road
- M62 – M62 Eastbound Between J24 And J25
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 21, 2026 1:40 PM
- Last updated
- Mon, Sep 28, 2026 1:46 PM
- Cleared
- Mon, Sep 28, 2026 2:00 PM
- Latest update: M62 eastbound Jct 24 to Jct 25 hardshoulder closure (91/4 91/8)
- Coordinates
- 53.680077, -1.801527
- Latitude span
- 53.679723 – 53.680660
- Longitude span
- -1.803732 – -1.797888
- Bounding box centre
- 53.680192, -1.800810
- Location descriptions
-
- M62 eastbound between J24 and J25
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 28, 2026 8:00 AM
- Overall feed end
- Mon, Sep 28, 2026 2:00 PM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M62 eastbound between J24 and J25
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {FDAFABAC-562A-47B3-A70E-5EB3208542B1}
- Linear Element Type
- A Carriageway
- From Distance
- 1,815 m
- To Distance
- 1,817 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.679723 -1.803732 53.679728 -1.803699
Segment 2
4 coordinate pairs- Description
- M62 eastbound between J24 and J25
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {E2B2E64C-AD87-41BF-A3DC-FAA7C8DBE192}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 397 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.679728 -1.803699 53.68018 -1.800881 53.68044 -1.79926 53.68066 -1.797888
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -1.803732, 53.679723
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.803732,
53.679723
],
[
-1.803699,
53.679728
],
[
-1.803699,
53.679728
],
[
-1.800881,
53.68018
],
[
-1.79926,
53.68044
],
[
-1.797888,
53.68066
]
]
]
}
View road section coordinates
[
[
[
-1.803732,
53.679723
],
[
-1.803699,
53.679728
],
[
-1.803699,
53.679728
],
[
-1.800881,
53.68018
],
[
-1.79926,
53.68044
],
[
-1.797888,
53.68066
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Sep 21, 2026 1:40 PM
- Record versioned
- Mon, Sep 28, 2026 1:46 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 5 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 Eastbound lanes 2, 3 and 4 closure (MP 26/7 to 28/4)
Planned Roadworks National HighwaysStarts in 12 hours 35 minutes
M62 Eastbound lanes 2, 3 and 4 closure (MP 26/7 to 28/4)
M62 Westbound Jct 20 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 11 hours 35 minutes
M62 Westbound Jct 20 exit slip road lane 1 closure
M62 Eastbound lanes 1 and 2 closure (MP 21/2 to 22/1)
Planned Roadworks National HighwaysStarts in 11 hours 35 minutes
M62 Eastbound lanes 1 and 2 closure (MP 21/2 to 22/1)
M62 eastbound Jct 25 to Jct 26 Lane 1 and 2 closure (95/4 - 96/4)
Planned Roadworks National HighwaysStarts in 10 hours 35 minutes
M62 eastbound Jct 25 to Jct 26 Lane 1 and 2 closure (95/4 - 96/4)
M62 eastbound Jct 34 to Jct 35 lane 1,2 closure (149/0 to 151/3)
Planned Roadworks National HighwaysStarts in 10 hours 35 minutes
M62 eastbound Jct 34 to Jct 35 lane 1,2 closure (149/0 to 151/3)