M61 Northbound to M65 Westbound link road hardshoulder closure
ClearedM61 Northbound to M65 Westbound link road hardshoulder closure
- Start time
- Wed, Jul 22, 2026 4:00 PM
- Expected end
- Thu, Jul 23, 2026 5:00 AM
- Duration
- 13 hours
- Road
- M65 – M65 J2 Westbound Access
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 1 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 9, 2026 6:05 AM
- Last updated
- Thu, Jul 23, 2026 4:41 AM
- Cleared
- Thu, Jul 23, 2026 5:00 AM
- Latest update: M61 Northbound to M65 Westbound link road hardshoulder closure
- Coordinates
- 53.718137, -2.634945
- Latitude span
- 53.718026 – 53.718212
- Longitude span
- -2.636930 – -2.632828
- Bounding box centre
- 53.718119, -2.634879
- Location descriptions
-
- M65 J2 westbound access
- M65 westbound between J2 and J1
- Feed validity status
- Planned
- Overall feed start
- Wed, Jul 22, 2026 4:00 PM
- Overall feed end
- Thu, Jul 23, 2026 5:00 AM
- Feed window length
- 13 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M65 J2 westbound access
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {40840414-882B-4386-893B-BE7975B1E48A}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 116 m
- To Distance
- 254 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.718026 -2.632828 53.718095 -2.633328 53.718112 -2.633495 53.718145 -2.633965 53.718157 -2.634117 53.71817 -2.634299 53.718212 -2.634891
Segment 2
6 coordinate pairs- Description
- M65 westbound between J2 and J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {8B607DF2-60F1-4E64-B1FC-AB8919EDA327}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 135 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.718212 -2.634891 53.718191 -2.635466 53.718141 -2.63645 53.718112 -2.636783 53.718107 -2.636844 53.718101 -2.63693
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -2.632828, 53.718026
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.632828,
53.718026
],
[
-2.633328,
53.718095
],
[
-2.633495,
53.718112
],
[
-2.633965,
53.718145
],
[
-2.634117,
53.718157
],
[
-2.634299,
53.71817
],
[
-2.634891,
53.718212
],
[
-2.634891,
53.718212
],
[
-2.635466,
53.718191
],
[
-2.63645,
53.718141
],
[
-2.636783,
53.718112
],
[
-2.636844,
53.718107
],
[
-2.63693,
53.718101
]
]
]
}
View road section coordinates
[
[
[
-2.632828,
53.718026
],
[
-2.633328,
53.718095
],
[
-2.633495,
53.718112
],
[
-2.633965,
53.718145
],
[
-2.634117,
53.718157
],
[
-2.634299,
53.71817
],
[
-2.634891,
53.718212
],
[
-2.634891,
53.718212
],
[
-2.635466,
53.718191
],
[
-2.63645,
53.718141
],
[
-2.636783,
53.718112
],
[
-2.636844,
53.718107
],
[
-2.63693,
53.718101
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 9, 2026 6:05 AM
- Record versioned
- Thu, Jul 23, 2026 4:41 AM
- Coordinate source
- Geometry
Driving on the M65? See every live closure, roadwork and planned restriction on this road.
M65 live closuresRelated incidents
M65 East and Westbound Jct 5 slips and approach roads - 24 hr narrow lanes, speed restrictions and carriageway closures
Planned Roadworks National HighwaysExpected to clear in 1 year 1 month
M65 East and Westbound Jct 5 slips and approach roads - 24 hr narrow lanes, speed restrictions and carriageway closures
M65 eastbound lane 2 closure (MP 3/5 to 6/6)
Planned Roadworks National HighwaysStarts in 5 hours 57 minutes
M65 eastbound lane 2 closure (MP 3/5 to 6/6)
M65 Westbound Jct 5 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 4 hours 32 minutes ago
M65 Westbound Jct 5 exit slip road lane closure
M65 eastbound lane 3 closure (MP 27/7 to 31/3)
Cleared Roadworks National HighwaysCleared 17 hours 2 minutes ago
M65 eastbound lane 3 closure (MP 27/7 to 31/3)
M65 eastbound lane 3 closure (MP 27/7 to 31/3)
Cleared Roadworks National HighwaysCleared 12 hours 32 minutes ago
M65 eastbound lane 3 closure (MP 27/7 to 31/3)
M65 eastbound lane 3 closure (MP 27/7 to 31/3)
Cleared Roadworks National HighwaysCleared 1 day 13 hours ago
M65 eastbound lane 3 closure (MP 27/7 to 31/3)