M61 northbound jct 5 exit slip road closure
PlannedM61 northbound jct 5 exit slip road closure
- Start time
- Fri, Jul 31, 2026 8:00 PM
- Expected end
- Sat, Aug 1, 2026 5:00 AM
- Duration
- 9 hours
- Category
- Road Maintenance
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jun 8, 2026 9:00 AM
- Last updated
- Fri, Jul 31, 2026 11:42 PM
- Cleared
- Sat, Aug 1, 2026 5:00 AM
- Latest update: M61 northbound jct 5 exit slip road closure
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 31, 2026 8:00 PM
- Overall feed end
- Sat, Aug 1, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Jun 8, 2026 9:00 AM
- Record versioned
- Fri, Jul 31, 2026 11:42 PM
Related incidents
M25 Clockwise Jct 20 Exit Slip Road Lane 2 Closure
Active Roadworks National HighwaysExpected to clear in 4 hours 50 minutes
M25 Clockwise Jct 20 Exit Slip Road Lane 2 Closure
M1 Northbound Jct 5 to Jct 6 Carriageway and Slip Road closure
Active Roadworks National HighwaysExpected to clear in 4 hours 50 minutes
M1 Northbound Jct 5 to Jct 6 Carriageway and Slip Road closure
A3 Northbound WIsley carriageway closure between the exit and entry slip road
Active Roadworks National HighwaysExpected to clear in 4 hours 50 minutes
A3 Northbound WIsley carriageway closure between the exit and entry slip road
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
Active Roadworks National HighwaysExpected to clear in 2 days 4 hours
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
M1 southbound Jct 13 to Jct 11A lane 1 and 2 closure (MP 64/1 to 60/1)
Active Roadworks National HighwaysExpected to clear in 3 hours 50 minutes
M1 southbound Jct 13 to Jct 11A lane 1 and 2 closure (MP 64/1 to 60/1)
A282 Northbound Dartford Crossing West Tunnel closure
Active Roadworks National HighwaysExpected to clear in 4 hours 20 minutes
A282 Northbound Dartford Crossing West Tunnel closure