M60 Clockwise lane 1 closure (MP 50/6 to 51/1)

Planned

M60 Clockwise lane 1 closure (MP 50/6 to 51/1)

Start time
Mon, Aug 3, 2026 8:00 PM
Expected end
Tue, Aug 4, 2026 4:00 AM
Duration
8 hours
Road
M60 – M60 Clockwise Between J24 And J25
Category
Road Maintenance
Direction
Clockwise
Carriageway
Dual Carriageway
Lanes affected
Lane 1 closed, 1 of 3 lanes affected
Reason
Roadworks
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Jul 9, 2026 8:10 AM
Last updated
Mon, Aug 3, 2026 5:13 AM
Cleared
Tue, Aug 4, 2026 4:00 AM
  • Latest update: M60 Clockwise lane 1 closure (MP 50/6 to 51/1)
Coordinates
53.442611, -2.132254
Latitude span
53.440883 – 53.444849
Longitude span
-2.133334 – -2.131382
Bounding box centre
53.442866, -2.132358
Location descriptions
  • M60 clockwise between J24 and J25
Feed validity status
Planned
Overall feed start
Mon, Aug 3, 2026 8:00 PM
Overall feed end
Tue, Aug 4, 2026 4:00 AM
Feed window length
8 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

6 coordinate pairs
Description
M60 clockwise between J24 and J25
Carriageway
Dual Carriageway
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
Clockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{38B257AD-1849-4C48-8352-2991CF434E0C}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
246 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.443001 -2.132458
53.442714 -2.132322
53.441782 -2.131848
53.441462 -2.131685
53.441402 -2.131655
53.440883 -2.131382

Segment 2

3 coordinate pairs
Description
M60 clockwise between J24 and J25
Carriageway
Dual Carriageway
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
Clockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{6508210F-FED9-4F90-89C0-EC9470BB5AFA}
Linear Element Type
A Carriageway
From Distance
550 m
To Distance
764 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.444849 -2.133334
53.444403 -2.13314
53.443001 -2.132458
Geometry type
MultiLineString
Geometry points
9
First coordinate pair
-2.132458, 53.443001
Road section segments
1
Road section points
9
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.132458,
                53.443001
            ],
            [
                -2.132322,
                53.442714
            ],
            [
                -2.131848,
                53.441782
            ],
            [
                -2.131685,
                53.441462
            ],
            [
                -2.131655,
                53.441402
            ],
            [
                -2.131382,
                53.440883
            ],
            [
                -2.133334,
                53.444849
            ],
            [
                -2.13314,
                53.444403
            ],
            [
                -2.132458,
                53.443001
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.132458,
            53.443001
        ],
        [
            -2.132322,
            53.442714
        ],
        [
            -2.131848,
            53.441782
        ],
        [
            -2.131685,
            53.441462
        ],
        [
            -2.131655,
            53.441402
        ],
        [
            -2.131382,
            53.440883
        ],
        [
            -2.133334,
            53.444849
        ],
        [
            -2.13314,
            53.444403
        ],
        [
            -2.132458,
            53.443001
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Roadworks
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Thu, Jul 9, 2026 8:10 AM
Record versioned
Mon, Aug 3, 2026 5:13 AM
Coordinate source
Geometry

Driving on the M60? See every live closure, roadwork and planned restriction on this road.

M60 live closures

Related incidents

M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)

Active Roadworks National Highways
Tameside M67 · M67 Eastbound Between J1 And J1A

Expected to clear in 3 weeks 1 day

Started 19 Jun 2026, 04:00 Expected clear 25 Aug 2026, 20:00

M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)

Category: Construction Work
View update

M60 anticlockwise lane 1 and 2 closure (MP 51/2 to 46/7)

Planned Roadworks National Highways
Tameside M60 · M60 Anti-Clockwise Within J23

Starts in 13 hours 57 minutes

Starts 3 Aug 2026, 20:00 Expected clear 4 Aug 2026, 05:00

M60 anticlockwise lane 1 and 2 closure (MP 51/2 to 46/7)

Category: Construction Work
View update

M60 Clockwise Jct 7 exit slip to CD link road closure

Planned Roadworks National Highways
Trafford M60 · Connector At M60 J6 Clockwise

Starts in 13 hours 57 minutes

Starts 3 Aug 2026, 20:00 Expected clear 4 Aug 2026, 05:00

M60 Clockwise Jct 7 exit slip to CD link road closure

Category: Road Maintenance
View update

M67 eastbound jct 3 entry slip road closure

Planned Roadworks National Highways
Tameside M67 · M67 J3 Eastbound Access

Starts in 12 hours 57 minutes

Starts 3 Aug 2026, 19:00 Expected clear 4 Aug 2026, 05:00

M67 eastbound jct 3 entry slip road closure

Category: Construction Work
View update

M67 eastbound hard shoulder closure (MP 5/6 to 6/2)

Planned Roadworks National Highways
Tameside M67 · M67 Eastbound Between J3 And J4

Starts in 1 hour 57 minutes

Starts 3 Aug 2026, 08:00 Expected clear 3 Aug 2026, 16:00

M67 eastbound hard shoulder closure (MP 5/6 to 6/2)

Category: Road Maintenance
View update

M60 Anticlockwise hardshoulder closure (MP 2/9 to 2/6)

Planned Roadworks National Highways
Stockport M60 · M60 Anti-Clockwise Between J3 And J2

Starts in 57 minutes 30 seconds

Starts 3 Aug 2026, 07:00 Expected clear 3 Aug 2026, 16:00

M60 Anticlockwise hardshoulder closure (MP 2/9 to 2/6)

Category: Road Maintenance
View update