M60 Anticlockwise Jct 27 exit slip road closure
ClearedM60 Anticlockwise Jct 27 exit slip road closure
- Start time
- Mon, Sep 14, 2026 9:21 PM
- Expected end
- Tue, Sep 15, 2026 5:00 AM
- Duration
- 4 hours 34 minutes 1 second
- Road
- M60 – M60 J27 Anti-Clockwise Exit
- Category
- Construction Work
- Direction
- Anticlockwise
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 14, 2026 9:21 PM
- Last updated
- Tue, Sep 15, 2026 1:36 AM
- Cleared
- Tue, Sep 15, 2026 1:55 AM
- Latest update: M60 Anticlockwise Jct 27 exit slip road closure
- Coordinates
- 53.415537, -2.152174
- Latitude span
- 53.415238 – 53.415795
- Longitude span
- -2.152893 – -2.151548
- Bounding box centre
- 53.415517, -2.152221
- Location descriptions
-
- M60 J27 anti-clockwise exit
- Feed validity status
- Active
- Overall feed start
- Mon, Sep 14, 2026 9:21 PM
- Overall feed end
- Tue, Sep 15, 2026 5:00 AM
- Feed window length
- 7 hours 39 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M60 J27 anti-clockwise exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {A6E57935-6BF5-4200-9E6A-363AFFCE84A7}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 75 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.41541 -2.152488 53.415644 -2.151917 53.415725 -2.151707 53.415795 -2.151548
Segment 2
2 coordinate pairs- Description
- M60 J27 anti-clockwise exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {52263B14-0515-481A-95A1-258E16904699}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 33 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.415238 -2.152893 53.41541 -2.152488
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -2.152488, 53.415410
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.152488,
53.41541
],
[
-2.151917,
53.415644
],
[
-2.151707,
53.415725
],
[
-2.151548,
53.415795
],
[
-2.152893,
53.415238
],
[
-2.152488,
53.41541
]
]
]
}
View road section coordinates
[
[
[
-2.152488,
53.41541
],
[
-2.151917,
53.415644
],
[
-2.151707,
53.415725
],
[
-2.151548,
53.415795
],
[
-2.152893,
53.415238
],
[
-2.152488,
53.41541
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 8
- Record created
- Mon, Sep 14, 2026 9:21 PM
- Record versioned
- Tue, Sep 15, 2026 1:36 AM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 Clockwise Jct 10 entry slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 2 hours 37 minutes
M60 Clockwise Jct 10 entry slip road lane 1 closure
M60 Clockwise lane 1 closure (MP 49/1 to 52/2)
Planned Roadworks National HighwaysStarts in 17 hours 37 minutes
M60 Clockwise lane 1 closure (MP 49/1 to 52/2)
M60 Anticlockwise Lanes 1 and 2 closure (MP 1/3 to 50/5)
Cleared Roadworks National HighwaysExpected to clear in 1 day 2 hours
M60 Anticlockwise Lanes 1 and 2 closure (MP 1/3 to 50/5)
M60 Clockwise Jct 10 entry slip road lane 1 closure
Cleared Roadworks National HighwaysCleared 1 day 5 hours ago
M60 Clockwise Jct 10 entry slip road lane 1 closure
M60 Clockwise Jct 9 entry slip road lane 1 closure
Cleared Roadworks National HighwaysCleared 1 day 5 hours ago
M60 Clockwise Jct 9 entry slip road lane 1 closure
M60 Clockwise lanes 1 and 2 closure (MP 41/1 to 43/5)
Cleared Roadworks National HighwaysCleared 1 day 23 hours ago
M60 Clockwise lanes 1 and 2 closure (MP 41/1 to 43/5)