M60 anticlockwise jct 24 entry slip road closure
ClearedM60 anticlockwise jct 24 entry slip road closure
- Start time
- Thu, Jul 2, 2026 9:00 PM
- Expected end
- Fri, Jul 3, 2026 5:00 AM
- Duration
- 5 hours 55 minutes 2 seconds
- Category
- Road Maintenance
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, May 22, 2026 7:25 AM
- Last updated
- Fri, Jul 3, 2026 2:41 AM
- Cleared
- Fri, Jul 3, 2026 2:55 AM
- Latest update: M60 anticlockwise jct 24 entry slip road closure
- Feed validity status
- Planned
- Overall feed start
- Thu, Jul 2, 2026 9:00 PM
- Overall feed end
- Fri, Jul 3, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 18
- Record created
- Fri, May 22, 2026 7:25 AM
- Record versioned
- Fri, Jul 3, 2026 2:41 AM
Related incidents
A628 eastbound Tintwistle Layby closure
Planned Roadworks National HighwaysExpected to clear in 2 days 12 hours
A628 eastbound Tintwistle Layby closure
M40 Northbound Jct 4 to Jct 5 hardshoulder closure
Planned Roadworks National HighwaysExpected to clear in 5 hours 6 minutes
M40 Northbound Jct 4 to Jct 5 hardshoulder closure
M2 Jct 6 Exit slip road closure
Active Roadworks National HighwaysExpected to clear in 3 weeks 11 hours
M2 Jct 6 Exit slip road closure
Contra flow westbound with eastbound closed from Horseshoe Drive
Active Roadworks National HighwaysExpected to clear in 5 months 4 days
contra flow westbound with eastbound closed from Horseshoe Drive
A500 both directions Campbell Road over bridge carriageway closure
Active Roadworks National HighwaysExpected to clear in 5 months 2 weeks
A500 both directions Campbell Road over bridge carriageway closure
A4 both directions lane closures
Planned Roadworks National HighwaysExpected to clear in 2 months 2 weeks
A4 both directions lane closures