M60 Anticlockwise Jct 23 exit slip road closure
ClearedM60 Anticlockwise Jct 23 exit slip road closure
- Start time
- Wed, Oct 14, 2026 10:45 PM
- Expected end
- Thu, Oct 15, 2026 5:00 AM
- Duration
- 6 hours 5 minutes 2 seconds
- Road
- M60 – M60 J23 Anti-Clockwise Exit For A6140
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 15, 2026 4:03 AM
- Last updated
- Thu, Oct 15, 2026 4:31 AM
- Cleared
- Thu, Oct 15, 2026 4:50 AM
- Latest update: M60 Anticlockwise Jct 23 exit slip road closure
- Coordinates
- 53.477555, -2.122273
- Latitude span
- 53.476259 – 53.478211
- Longitude span
- -2.124551 – -2.121035
- Bounding box centre
- 53.477235, -2.122793
- Location descriptions
-
- M60 J23 anti-clockwise exit for A6140
- Feed validity status
- Planned
- Overall feed start
- Wed, Oct 14, 2026 10:45 PM
- Overall feed end
- Thu, Oct 15, 2026 5:00 AM
- Feed window length
- 6 hours 15 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M60 J23 anti-clockwise exit for A6140
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {CEECA12A-EB35-4B6E-949A-964F378F7B0F}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.478171 -2.121268 53.478167 -2.121208 53.478211 -2.121035
Segment 2
7 coordinate pairs- Description
- M60 J23 anti-clockwise exit for A6140
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {1CE9A6AC-C1AE-4548-A310-11DF1AF90ACB}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 130 m
- To Distance
- 434 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.476259 -2.124551 53.476853 -2.123495 53.477099 -2.123058 53.47715 -2.122968 53.477699 -2.122005 53.477771 -2.12187 53.478171 -2.121268
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -2.121268, 53.478171
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.121268,
53.478171
],
[
-2.121208,
53.478167
],
[
-2.121035,
53.478211
],
[
-2.124551,
53.476259
],
[
-2.123495,
53.476853
],
[
-2.123058,
53.477099
],
[
-2.122968,
53.47715
],
[
-2.122005,
53.477699
],
[
-2.12187,
53.477771
],
[
-2.121268,
53.478171
]
]
]
}
View road section coordinates
[
[
[
-2.121268,
53.478171
],
[
-2.121208,
53.478167
],
[
-2.121035,
53.478211
],
[
-2.124551,
53.476259
],
[
-2.123495,
53.476853
],
[
-2.123058,
53.477099
],
[
-2.122968,
53.47715
],
[
-2.122005,
53.477699
],
[
-2.12187,
53.477771
],
[
-2.121268,
53.478171
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Oct 15, 2026 4:03 AM
- Record versioned
- Thu, Oct 15, 2026 4:31 AM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 1 month 2 weeks
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
M60 Clockwise Jct 19 entry slip road closure
Planned Roadworks National HighwaysStarts in 14 hours 25 minutes
M60 Clockwise Jct 19 entry slip road closure
M6 Northbound Lanes 2 and 3 closure with hardshoulder running at 20/9 (MP 19/7 to 25/0)
Planned Roadworks National HighwaysStarts in 13 hours 25 minutes
M6 Northbound Lanes 2 and 3 closure with hardshoulder running at 20/9 (MP 19/7 to 25/0)
A663 Eastbound Broadgate carriageway closure
Planned Roadworks National HighwaysStarts in 13 hours 25 minutes
A663 Eastbound Broadgate carriageway closure
A663 Northbound Stott Lane to Broadgate lane 1 closure
Planned Roadworks National HighwaysStarts in 13 hours 25 minutes
A663 Northbound Stott Lane to Broadgate lane 1 closure
M60 Clockwise hardshoulder closure (MP 51/0 to 51/7)
Planned Roadworks National HighwaysStarts in 2 hours 25 minutes
M60 Clockwise hardshoulder closure (MP 51/0 to 51/7)