M60 anticlockwise jct 23 exit slip road closure
ClearedM60 anticlockwise jct 23 exit slip road closure
- Start time
- Thu, Jul 2, 2026 9:00 PM
- Expected end
- Fri, Jul 3, 2026 5:00 AM
- Duration
- 2 hours 35 minutes 1 second
- Road
- M60 – M60 J23 Anti-Clockwise Exit For A6140
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, May 22, 2026 7:25 AM
- Last updated
- Thu, Jul 2, 2026 11:10 PM
- Cleared
- Thu, Jul 2, 2026 11:35 PM
- Latest update: M60 anticlockwise jct 23 exit slip road closure
- Coordinates
- 53.477555, -2.122273
- Latitude span
- 53.476259 – 53.478211
- Longitude span
- -2.124551 – -2.121035
- Bounding box centre
- 53.477235, -2.122793
- Location descriptions
-
- M60 J23 anti-clockwise exit for A6140
- Feed validity status
- Planned
- Overall feed start
- Thu, Jul 2, 2026 9:00 PM
- Overall feed end
- Fri, Jul 3, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M60 J23 anti-clockwise exit for A6140
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {CEECA12A-EB35-4B6E-949A-964F378F7B0F}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.478171 -2.121268 53.478167 -2.121208 53.478211 -2.121035
Segment 2
7 coordinate pairs- Description
- M60 J23 anti-clockwise exit for A6140
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {1CE9A6AC-C1AE-4548-A310-11DF1AF90ACB}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 130 m
- To Distance
- 434 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.476259 -2.124551 53.476853 -2.123495 53.477099 -2.123058 53.47715 -2.122968 53.477699 -2.122005 53.477771 -2.12187 53.478171 -2.121268
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -2.121268, 53.478171
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.121268,
53.478171
],
[
-2.121208,
53.478167
],
[
-2.121035,
53.478211
],
[
-2.124551,
53.476259
],
[
-2.123495,
53.476853
],
[
-2.123058,
53.477099
],
[
-2.122968,
53.47715
],
[
-2.122005,
53.477699
],
[
-2.12187,
53.477771
],
[
-2.121268,
53.478171
]
]
]
}
View road section coordinates
[
[
[
-2.121268,
53.478171
],
[
-2.121208,
53.478167
],
[
-2.121035,
53.478211
],
[
-2.124551,
53.476259
],
[
-2.123495,
53.476853
],
[
-2.123058,
53.477099
],
[
-2.122968,
53.47715
],
[
-2.122005,
53.477699
],
[
-2.12187,
53.477771
],
[
-2.121268,
53.478171
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 18
- Record created
- Fri, May 22, 2026 7:25 AM
- Record versioned
- Thu, Jul 2, 2026 11:10 PM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 Clockwise Jct 27 entry slip road closure
Planned Roadworks National HighwaysExpected to clear in 5 hours 45 minutes
M60 Clockwise Jct 27 entry slip road closure
M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)
Active Roadworks National HighwaysExpected to clear in 1 month 4 days
M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)
M67 eastbound jct 3 entry slip road closure
Cleared Roadworks National HighwaysCleared 4 hours 14 minutes ago
M67 eastbound jct 3 entry slip road closure
M67 eastbound jct 3 to 4 carriageway closure
Cleared Roadworks National HighwaysCleared 3 hours 39 minutes ago
M67 eastbound jct 3 to 4 carriageway closure
M67 eastbound hard shoulder closure (MP 2/8 to 3/1)
Cleared Roadworks National HighwaysCleared 8 hours 29 minutes ago
M67 eastbound hard shoulder closure (MP 2/8 to 3/1)
M67 eastbound hard shoulder closure (MP 2/8 to 3/1)
Cleared Roadworks National HighwaysCleared 14 hours 19 minutes ago
M67 eastbound hard shoulder closure (MP 2/8 to 3/1)