M60 Anticlockwise Jct 11 entry slip road from CD link

Cleared

M60 Anticlockwise Jct 11 entry slip road from CD link

Start time
Fri, Sep 18, 2026 8:00 PM
Expected end
Sat, Sep 19, 2026 6:00 AM
Duration
2 seconds
Road
M60 – Link Road From M60 Anti-Clockwise Distributor To M60 J11
Category
Construction Work
Direction
Anticlockwise
Carriageway
Distributorlane
Reason
Construction Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Aug 13, 2026 1:30 PM
Last updated
Fri, Sep 18, 2026 4:28 AM
Cleared
Fri, Sep 18, 2026 8:00 PM
  • Latest update: M60 Anticlockwise Jct 11 entry slip road from CD link
Coordinates
53.478490, -2.374600
Latitude span
53.477561 – 53.478869
Longitude span
-2.374738 – -2.374304
Bounding box centre
53.478215, -2.374521
Location descriptions
  • link road from M60 anti-clockwise distributor to M60 J11
  • M60 anti-clockwise distributor J12 to J11
Feed validity status
Planned
Overall feed start
Fri, Sep 18, 2026 8:00 PM
Overall feed end
Sat, Sep 19, 2026 6:00 AM
Feed window length
10 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

4 coordinate pairs
Description
link road from M60 anti-clockwise distributor to M60 J11
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{1F97D09C-8BD2-4266-89A1-389B7741E486}
Linear Element Type
B Carriageway Entry Slip
From Distance
0 m
To Distance
135 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.478755 -2.374691
53.478557 -2.374615
53.478154 -2.37446
53.477561 -2.374304

Segment 2

3 coordinate pairs
Description
M60 anti-clockwise distributor J12 to J11
Carriageway
Distributor Lane
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{8580A250-E63D-4EEE-B1A1-319B9E23CD39}
Linear Element Type
B Carriageway
From Distance
499 m
To Distance
512 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.478869 -2.374738
53.478782 -2.374702
53.478755 -2.374691
Geometry type
MultiLineString
Geometry points
7
First coordinate pair
-2.374691, 53.478755
Road section segments
1
Road section points
7
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.374691,
                53.478755
            ],
            [
                -2.374615,
                53.478557
            ],
            [
                -2.37446,
                53.478154
            ],
            [
                -2.374304,
                53.477561
            ],
            [
                -2.374738,
                53.478869
            ],
            [
                -2.374702,
                53.478782
            ],
            [
                -2.374691,
                53.478755
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.374691,
            53.478755
        ],
        [
            -2.374615,
            53.478557
        ],
        [
            -2.37446,
            53.478154
        ],
        [
            -2.374304,
            53.477561
        ],
        [
            -2.374738,
            53.478869
        ],
        [
            -2.374702,
            53.478782
        ],
        [
            -2.374691,
            53.478755
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Construction Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Thu, Aug 13, 2026 1:30 PM
Record versioned
Fri, Sep 18, 2026 4:28 AM
Coordinate source
Geometry

Driving on the M60? See every live closure, roadwork and planned restriction on this road.

M60 live closures

Related incidents

M60 Clockwise Jct 10 entry slip road lane 1 closure

Planned Roadworks National Highways
Trafford M60 · M60 Clockwise Between J10 And J11

Expected to clear in 2 hours 8 minutes

Started 11 Oct 2026, 20:00 Expected clear 12 Oct 2026, 05:00

M60 Clockwise Jct 10 entry slip road lane 1 closure

Category: Road Maintenance
View update

M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)

Active Roadworks National Highways
Salford M602 · M602 Eastbound Between J2 And J3

Expected to clear in 1 week 4 days

Started 11 Oct 2026, 12:38 Expected clear 23 Oct 2026, 16:00

M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)

Category: Road Maintenance
View update

M60 Clockwise lane 1 closure (MP 49/1 to 52/2)

Planned Roadworks National Highways
Tameside M60 · M60 Clockwise Between J24 And J25

Starts in 17 hours 8 minutes

Starts 12 Oct 2026, 20:00 Expected clear 13 Oct 2026, 05:00

M60 Clockwise lane 1 closure (MP 49/1 to 52/2)

Category: Construction Work
View update

M602 Eastbound lane 3 closure (MP 2/5 to 3/7)

Planned Roadworks National Highways
Salford M602 · M602 Eastbound Within J2

Starts in 17 hours 8 minutes

Starts 12 Oct 2026, 20:00 Expected clear 13 Oct 2026, 05:00

M602 Eastbound lane 3 closure (MP 2/5 to 3/7)

Category: Road Maintenance
View update

M60 Anticlockwise Lanes 1 and 2 closure (MP 1/3 to 50/5)

Cleared Roadworks National Highways
Stockport M60 · M60 Anti-Clockwise Within J25

Expected to clear in 1 day 2 hours

Started 12 Oct 2026, 20:00 Expected clear 13 Oct 2026, 05:00

M60 Anticlockwise Lanes 1 and 2 closure (MP 1/3 to 50/5)

Category: Road Maintenance
View update

M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)

Cleared Roadworks National Highways
Salford M602 · M602 Eastbound Between J2 And J3

Cleared 15 hours 41 minutes ago

Started 11 Oct 2026, 09:00 Ended 11 Oct 2026, 11:10

M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)

Category: Road Maintenance
View update