M6 Southbound Jct 32 Hardshoulder closure 357/1B to 24/7B M route)
PlannedM6 Southbound Jct 32 Hardshoulder closure 357/1B to 24/7B M route)
- Start time
- Sun, Jul 19, 2026 6:00 PM
- Expected end
- Sat, Aug 15, 2026 5:00 AM
- Duration
- 3 weeks 5 days 11 hours
- Road
- M6 – M6 Southbound Within J32
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadside Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Mar 25, 2026 8:19 AM
- Last updated
- Wed, Aug 5, 2026 2:02 AM
- Cleared
- Sat, Aug 15, 2026 5:00 AM
- Latest update: M6 Southbound Jct 32 Hardshoulder closure 357/1B to 24/7B M route)
- Coordinates
- 53.812595, -2.705361
- Latitude span
- 53.812398 – 53.812822
- Longitude span
- -2.705828 – -2.704972
- Bounding box centre
- 53.812610, -2.705400
- Location descriptions
-
- M6 southbound within J32
- M6 southbound between J33 and J32
- Feed validity status
- Planned
- Overall feed start
- Sun, Jul 19, 2026 6:00 PM
- Overall feed end
- Sat, Aug 15, 2026 5:00 AM
- Feed window length
- 3 weeks 5 days 11 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M6 southbound within J32
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {B8D3127C-29E9-473D-B15A-2D50770391DB}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 20 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.812522 -2.705203 53.812398 -2.704972
Segment 2
3 coordinate pairs- Description
- M6 southbound between J33 and J32
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {344129D7-DA1B-4D08-82D0-C6B816527F60}
- Linear Element Type
- B Carriageway
- From Distance
- 288 m
- To Distance
- 341 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.812822 -2.705828 53.812713 -2.705601 53.812522 -2.705203
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -2.705203, 53.812522
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.705203,
53.812522
],
[
-2.704972,
53.812398
],
[
-2.705828,
53.812822
],
[
-2.705601,
53.812713
],
[
-2.705203,
53.812522
]
]
]
}
View road section coordinates
[
[
[
-2.705203,
53.812522
],
[
-2.704972,
53.812398
],
[
-2.705828,
53.812822
],
[
-2.705601,
53.812713
],
[
-2.705203,
53.812522
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadside Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Wed, Mar 25, 2026 8:19 AM
- Record versioned
- Wed, Aug 5, 2026 2:02 AM
- Coordinate source
- Geometry
Driving on the M6? See every live closure, roadwork and planned restriction on this road.
M6 live closuresRelated incidents
M6 southbound Jct 4a to M42 Jct 8 northbound link road closure
Planned Roadworks National HighwaysExpected to clear in 2 hours 42 minutes
M6 southbound Jct 4a to M42 Jct 8 northbound link road closure
Lane 2 and 3 closure southbound
Planned Roadworks National HighwaysExpected to clear in 2 hours 42 minutes
Lane 2 and 3 closure southbound
M6 to M1 southbound link road closure
Active Roadworks National HighwaysExpected to clear in 2 hours 42 minutes
M6 to M1 southbound link road closure
M6 - M42 link road hardshoulder closure northbound
Active Roadworks National HighwaysExpected to clear in 1 month 2 days
M6 - M42 link road hardshoulder closure northbound
M6 Southbound Jct 41 entry slip road Lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 4 years 4 months
M6 Southbound Jct 41 entry slip road Lane 1 closure
M6 Southbound Jct 40 to 39 Lane 3 closure with Narrow lanes (Mp 459/4 - 455/7)
Planned Roadworks National HighwaysExpected to clear in 3 months 1 week
M6 Southbound Jct 40 to 39 Lane 3 closure with Narrow lanes (Mp 459/4 - 455/7)