M6 Northbound Charnock Richard Services entry and exit slip road closure
ClearedM6 Northbound Charnock Richard Services entry and exit slip road closure
- Start time
- Mon, Jul 27, 2026 10:00 PM
- Expected end
- Tue, Jul 28, 2026 4:00 AM
- Duration
- 1 second
- Road
- M6 – M6 Northbound At The Charnock Richard Services Slip Road Between J27 And J28
- Category
- Road Maintenance
- Direction
- Northbound
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jul 27, 2026 3:54 AM
- Last updated
- Mon, Jul 27, 2026 5:29 AM
- Cleared
- Mon, Jul 27, 2026 10:00 PM
- Latest update: M6 Northbound Charnock Richard Services entry and exit slip road closure
- Coordinates
- 53.631871, -2.691168
- Latitude span
- 53.629700 – 53.633080
- Longitude span
- -2.691595 – -2.690197
- Bounding box centre
- 53.631390, -2.690896
- Location descriptions
-
- M6 northbound at the Charnock Richard services slip road between J27 and J28
- Feed validity status
- Planned
- Overall feed start
- Mon, Jul 27, 2026 10:00 PM
- Overall feed end
- Tue, Jul 28, 2026 4:00 AM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M6 northbound at the Charnock Richard services slip road between J27 and J28
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {8B405D8C-073A-407F-ADE0-B79708C54D4D}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 75 m
- To Distance
- 112 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.632509 -2.691595 53.632519 -2.691584 53.6326 -2.691555 53.632807 -2.691468 53.632832 -2.691461
Segment 2
4 coordinate pairs- Description
- M6 northbound at the Charnock Richard services slip road between J27 and J28
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {77130474-FA4D-4959-A5D5-5593CC256B5B}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 76 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.6297 -2.690197 53.629992 -2.690459 53.630303 -2.690687 53.630317 -2.690702
Segment 3
3 coordinate pairs- Description
- M6 northbound at the Charnock Richard services slip road between J27 and J28
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {6791BEF7-56F0-47FD-344D-5DCA39A4692B}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 27 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.632832 -2.691461 53.63296 -2.691425 53.63308 -2.691423
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -2.691595, 53.632509
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.691595,
53.632509
],
[
-2.691584,
53.632519
],
[
-2.691555,
53.6326
],
[
-2.691468,
53.632807
],
[
-2.691461,
53.632832
],
[
-2.690197,
53.6297
],
[
-2.690459,
53.629992
],
[
-2.690687,
53.630303
],
[
-2.690702,
53.630317
],
[
-2.691461,
53.632832
],
[
-2.691425,
53.63296
],
[
-2.691423,
53.63308
]
]
]
}
View road section coordinates
[
[
[
-2.691595,
53.632509
],
[
-2.691584,
53.632519
],
[
-2.691555,
53.6326
],
[
-2.691468,
53.632807
],
[
-2.691461,
53.632832
],
[
-2.690197,
53.6297
],
[
-2.690459,
53.629992
],
[
-2.690687,
53.630303
],
[
-2.690702,
53.630317
],
[
-2.691461,
53.632832
],
[
-2.691425,
53.63296
],
[
-2.691423,
53.63308
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jul 27, 2026 3:54 AM
- Record versioned
- Mon, Jul 27, 2026 5:29 AM
- Coordinate source
- Geometry
Driving on the M6? See every live closure, roadwork and planned restriction on this road.
M6 live closuresRelated incidents
M6 Southbound Jct 41 entry slip road Lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 4 years 4 months
M6 Southbound Jct 41 entry slip road Lane 1 closure
M6 Northbound Jct 39 entry slip road Lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 4 years 4 months
M6 Northbound Jct 39 entry slip road Lane 1 closure
M6 northbound J16 to J17 - lane closure for structure - maintenance on behalf of National Highways
Planned Roadworks National HighwaysExpected to clear in 1 month 3 weeks
M6 northbound J16 to J17 - lane closure for structure - maintenance on behalf of National Highways
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)
M6 Southbound lanes 3 and 4 closure (MP 307/9 to 302/4)
Cleared Roadworks National HighwaysExpected to clear in 23 hours 49 seconds
M6 Southbound lanes 3 and 4 closure (MP 307/9 to 302/4)
M61 Southbound lane 3 closure (MP 27/6 to 25/3)
Cleared Roadworks National HighwaysCleared 4 hours 59 minutes ago
M61 Southbound lane 3 closure (MP 27/6 to 25/3)