M58 eastbound hard shoulder closure (MP 23/4 to 24/1)
ClearedM58 eastbound hard shoulder closure (MP 23/4 to 24/1)
- Start time
- Tue, Jul 28, 2026 7:00 AM
- Expected end
- Tue, Jul 28, 2026 4:00 PM
- Duration
- 1 hour 5 minutes 2 seconds
- Road
- M58 – M58 Eastbound Between J4 And J5
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jul 13, 2026 8:55 AM
- Last updated
- Tue, Jul 28, 2026 7:41 AM
- Cleared
- Tue, Jul 28, 2026 8:05 AM
- Latest update: M58 eastbound hard shoulder closure (MP 23/4 to 24/1)
- Coordinates
- 53.537098, -2.773163
- Latitude span
- 53.535886 – 53.538131
- Longitude span
- -2.778081 – -2.767112
- Bounding box centre
- 53.537009, -2.772597
- Location descriptions
-
- M58 eastbound between J4 and J5
- Feed validity status
- Planned
- Overall feed start
- Tue, Jul 28, 2026 7:00 AM
- Overall feed end
- Tue, Jul 28, 2026 4:00 PM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M58 eastbound between J4 and J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M58
- Linear Element Model
- The Network Model
- Linear Element Id
- {7FBBC00D-EB5A-49DC-9917-2317287A6597}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 452 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.53717 -2.773591 53.537039 -2.77297 53.536821 -2.77188 53.536629 -2.770971 53.536368 -2.769623 53.535916 -2.767277 53.535886 -2.767112
Segment 2
6 coordinate pairs- Description
- M58 eastbound between J4 and J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M58
- Linear Element Model
- The Network Model
- Linear Element Id
- {40467460-EEDA-45DD-AF48-BE5C4836F3B9}
- Linear Element Type
- A Carriageway
- From Distance
- 430 m
- To Distance
- 747 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.538131 -2.778081 53.538129 -2.778075 53.538016 -2.777605 53.537649 -2.775893 53.53735 -2.774455 53.53717 -2.773591
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -2.773591, 53.537170
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.773591,
53.53717
],
[
-2.77297,
53.537039
],
[
-2.77188,
53.536821
],
[
-2.770971,
53.536629
],
[
-2.769623,
53.536368
],
[
-2.767277,
53.535916
],
[
-2.767112,
53.535886
],
[
-2.778081,
53.538131
],
[
-2.778075,
53.538129
],
[
-2.777605,
53.538016
],
[
-2.775893,
53.537649
],
[
-2.774455,
53.53735
],
[
-2.773591,
53.53717
]
]
]
}
View road section coordinates
[
[
[
-2.773591,
53.53717
],
[
-2.77297,
53.537039
],
[
-2.77188,
53.536821
],
[
-2.770971,
53.536629
],
[
-2.769623,
53.536368
],
[
-2.767277,
53.535916
],
[
-2.767112,
53.535886
],
[
-2.778081,
53.538131
],
[
-2.778075,
53.538129
],
[
-2.777605,
53.538016
],
[
-2.775893,
53.537649
],
[
-2.774455,
53.53735
],
[
-2.773591,
53.53717
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jul 13, 2026 8:55 AM
- Record versioned
- Tue, Jul 28, 2026 7:41 AM
- Coordinate source
- Geometry
Driving on the M58? See every live closure, roadwork and planned restriction on this road.
M58 live closuresRelated incidents
Mobile Hardshoulder closure East & Westbound from Switch Island - M6
Active Roadworks National HighwaysExpected to clear in 7 months 3 weeks
Mobile Hardshoulder closure East & Westbound from Switch Island - M6
M58 Eastbound lanes 2 and 3 closure (MP 13/8 to 18/9)
Cleared Roadworks National HighwaysCleared 4 days 3 hours ago
M58 Eastbound lanes 2 and 3 closure (MP 13/8 to 18/9)
M58 Eastbound lanes 2 and 3 closure (MP 18/7 to 21/8)
Cleared Roadworks National HighwaysCleared 5 days 4 hours ago
M58 Eastbound lanes 2 and 3 closure (MP 18/7 to 21/8)
M58 eastbound hard shoulder closure (MP 23/4 to 24/1)
Cleared Roadworks National HighwaysCleared 5 days 15 hours ago
M58 eastbound hard shoulder closure (MP 23/4 to 24/1)
M58 eastbound hard shoulder closure (MP 23/4 to 24/1)
Cleared Roadworks National HighwaysCleared 5 days 23 hours ago
M58 eastbound hard shoulder closure (MP 23/4 to 24/1)
M58 Eastbound lane 3 closure (MP 22/5 to 24/6) and hardshoulder closure (MP 23/7 to 24/1)
Cleared Roadworks National HighwaysCleared 6 days 3 hours ago
M58 Eastbound lane 3 closure (MP 22/5 to 24/6) and hardshoulder closure (MP 23/7 to 24/1)