M56 Eastbound Lanes 1 and 2 closure (MP 54/7 to 51/1)
ClearedM56 Eastbound Lanes 1 and 2 closure (MP 54/7 to 51/1)
- Start time
- Mon, Sep 14, 2026 7:00 PM
- Expected end
- Tue, Sep 15, 2026 5:00 AM
- Duration
- 3 hours 15 minutes 2 seconds
- Road
- M56 – M56 Eastbound Within J14
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 21, 2026 4:19 AM
- Last updated
- Mon, Sep 14, 2026 9:20 PM
- Cleared
- Mon, Sep 14, 2026 10:15 PM
- Latest update: M56 Eastbound Lanes 1 and 2 closure (MP 54/7 to 51/1)
- Coordinates
- 53.258865, -2.824636
- Latitude span
- 53.251219 – 53.266540
- Longitude span
- -2.844488 – -2.803580
- Bounding box centre
- 53.258880, -2.824034
- Location descriptions
-
- M56 eastbound within J14
- M56 eastbound between J15 and J14
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 14, 2026 7:00 PM
- Overall feed end
- Tue, Sep 15, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M56 eastbound within J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {DDB32DF2-373E-4A61-8AC6-11E455BA0456}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 316 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.265034 -2.808625 53.26533 -2.807611 53.265439 -2.807238 53.266276 -2.804435 53.266295 -2.804376
Segment 2
3 coordinate pairs- Description
- M56 eastbound within J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {556DF9DB-AFCD-4C42-AF41-532032F2F7CC}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 59 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.266295 -2.804376 53.266515 -2.80366 53.26654 -2.80358
Segment 3
14 coordinate pairs- Description
- M56 eastbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {E35B9EEB-DE49-4459-A112-196ED47E4558}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 665 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.258722 -2.825955 53.258745 -2.825924 53.25955 -2.824517 53.26017 -2.823299 53.260279 -2.823106 53.260498 -2.822646 53.26079 -2.821992 53.261183 -2.821055 53.26132 -2.820698 53.261577 -2.819998 53.261999 -2.818792 53.262136 -2.81839 53.262192 -2.818181 53.26226 -2.817969
Segment 4
8 coordinate pairs- Description
- M56 eastbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {8651AC60-FE80-4836-8DE9-4FAF737D5EDA}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 520 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.255518 -2.831649 53.256374 -2.830107 53.256902 -2.829187 53.257266 -2.82852 53.257957 -2.827349 53.258076 -2.827141 53.258303 -2.826741 53.258722 -2.825955
Segment 5
10 coordinate pairs- Description
- M56 eastbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {DA5C0806-0285-4544-B743-B693BF54B194}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 695 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.26226 -2.817969 53.26227 -2.817939 53.262458 -2.817346 53.262587 -2.816884 53.263001 -2.815543 53.263912 -2.812412 53.264068 -2.81192 53.264326 -2.81104 53.264804 -2.80943 53.265034 -2.808625
Segment 6
21 coordinate pairs- Description
- M56 eastbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {286046F7-7BE9-41FF-AF61-200175292747}
- Linear Element Type
- B Carriageway
- From Distance
- 123 m
- To Distance
- 1,110 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.251219 -2.844488 53.251287 -2.844217 53.251388 -2.843814 53.251675 -2.842666 53.251906 -2.841741 53.252164 -2.840787 53.25222 -2.840548 53.252644 -2.838997 53.253004 -2.837745 53.253123 -2.837388 53.253224 -2.83706 53.253279 -2.836896 53.253334 -2.836736 53.253509 -2.836226 53.254104 -2.834634 53.254497 -2.833743 53.254661 -2.833356 53.254744 -2.833193 53.254935 -2.832777 53.255345 -2.83196 53.255518 -2.831649
- Geometry type
- MultiLineString
- Geometry points
- 61
- First coordinate pair
- -2.808625, 53.265034
- Road section segments
- 1
- Road section points
- 61
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.808625,
53.265034
],
[
-2.807611,
53.26533
],
[
-2.807238,
53.265439
],
[
-2.804435,
53.266276
],
[
-2.804376,
53.266295
],
[
-2.804376,
53.266295
],
[
-2.80366,
53.266515
],
[
-2.80358,
53.26654
],
[
-2.825955,
53.258722
],
[
-2.825924,
53.258745
],
[
-2.824517,
53.25955
],
[
-2.823299,
53.26017
],
[
-2.823106,
53.260279
],
[
-2.822646,
53.260498
],
[
-2.821992,
53.26079
],
[
-2.821055,
53.261183
],
[
-2.820698,
53.26132
],
[
-2.819998,
53.261577
],
[
-2.818792,
53.261999
],
[
-2.81839,
53.262136
],
[
-2.818181,
53.262192
],
[
-2.817969,
53.26226
],
[
-2.831649,
53.255518
],
[
-2.830107,
53.256374
],
[
-2.829187,
53.256902
],
[
-2.82852,
53.257266
],
[
-2.827349,
53.257957
],
[
-2.827141,
53.258076
],
[
-2.826741,
53.258303
],
[
-2.825955,
53.258722
],
[
-2.817969,
53.26226
],
[
-2.817939,
53.26227
],
[
-2.817346,
53.262458
],
[
-2.816884,
53.262587
],
[
-2.815543,
53.263001
],
[
-2.812412,
53.263912
],
[
-2.81192,
53.264068
],
[
-2.81104,
53.264326
],
[
-2.80943,
53.264804
],
[
-2.808625,
53.265034
],
[
-2.844488,
53.251219
],
[
-2.844217,
53.251287
],
[
-2.843814,
53.251388
],
[
-2.842666,
53.251675
],
[
-2.841741,
53.251906
],
[
-2.840787,
53.252164
],
[
-2.840548,
53.25222
],
[
-2.838997,
53.252644
],
[
-2.837745,
53.253004
],
[
-2.837388,
53.253123
],
[
-2.83706,
53.253224
],
[
-2.836896,
53.253279
],
[
-2.836736,
53.253334
],
[
-2.836226,
53.253509
],
[
-2.834634,
53.254104
],
[
-2.833743,
53.254497
],
[
-2.833356,
53.254661
],
[
-2.833193,
53.254744
],
[
-2.832777,
53.254935
],
[
-2.83196,
53.255345
],
[
-2.831649,
53.255518
]
]
]
}
View road section coordinates
[
[
[
-2.808625,
53.265034
],
[
-2.807611,
53.26533
],
[
-2.807238,
53.265439
],
[
-2.804435,
53.266276
],
[
-2.804376,
53.266295
],
[
-2.804376,
53.266295
],
[
-2.80366,
53.266515
],
[
-2.80358,
53.26654
],
[
-2.825955,
53.258722
],
[
-2.825924,
53.258745
],
[
-2.824517,
53.25955
],
[
-2.823299,
53.26017
],
[
-2.823106,
53.260279
],
[
-2.822646,
53.260498
],
[
-2.821992,
53.26079
],
[
-2.821055,
53.261183
],
[
-2.820698,
53.26132
],
[
-2.819998,
53.261577
],
[
-2.818792,
53.261999
],
[
-2.81839,
53.262136
],
[
-2.818181,
53.262192
],
[
-2.817969,
53.26226
],
[
-2.831649,
53.255518
],
[
-2.830107,
53.256374
],
[
-2.829187,
53.256902
],
[
-2.82852,
53.257266
],
[
-2.827349,
53.257957
],
[
-2.827141,
53.258076
],
[
-2.826741,
53.258303
],
[
-2.825955,
53.258722
],
[
-2.817969,
53.26226
],
[
-2.817939,
53.26227
],
[
-2.817346,
53.262458
],
[
-2.816884,
53.262587
],
[
-2.815543,
53.263001
],
[
-2.812412,
53.263912
],
[
-2.81192,
53.264068
],
[
-2.81104,
53.264326
],
[
-2.80943,
53.264804
],
[
-2.808625,
53.265034
],
[
-2.844488,
53.251219
],
[
-2.844217,
53.251287
],
[
-2.843814,
53.251388
],
[
-2.842666,
53.251675
],
[
-2.841741,
53.251906
],
[
-2.840787,
53.252164
],
[
-2.840548,
53.25222
],
[
-2.838997,
53.252644
],
[
-2.837745,
53.253004
],
[
-2.837388,
53.253123
],
[
-2.83706,
53.253224
],
[
-2.836896,
53.253279
],
[
-2.836736,
53.253334
],
[
-2.836226,
53.253509
],
[
-2.834634,
53.254104
],
[
-2.833743,
53.254497
],
[
-2.833356,
53.254661
],
[
-2.833193,
53.254744
],
[
-2.832777,
53.254935
],
[
-2.83196,
53.255345
],
[
-2.831649,
53.255518
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 13
- Record created
- Fri, Aug 21, 2026 4:19 AM
- Record versioned
- Mon, Sep 14, 2026 9:20 PM
- Coordinate source
- Geometry
Driving on the M56? See every live closure, roadwork and planned restriction on this road.
M56 live closuresRelated incidents
M56 eastbound hard shoulder and lanes 1 and 2 closure (MP 24/4 to 20/5)
Planned Roadworks National HighwaysStarts in 3 hours 25 minutes
M56 eastbound hard shoulder and lanes 1 and 2 closure (MP 24/4 to 20/5)
A55 Eastbound lane 1 closure (MP 134/0 to 135/4)
Planned Roadworks National HighwaysStarts in 2 hours 25 minutes
A55 Eastbound lane 1 closure (MP 134/0 to 135/4)
M56 Eastbound lane 1 closure (MP 39/4 to 38/1)
Planned Roadworks National HighwaysStarts in 2 hours 25 minutes
M56 Eastbound lane 1 closure (MP 39/4 to 38/1)
A55 Westbound Jct 39 entry slip road closure
Planned Roadworks National HighwaysStarts in 2 hours 25 minutes
A55 Westbound Jct 39 entry slip road closure
M56 Eastbound lanes 1 and 2 closure (MP 15/4 to 14/4)
Cleared Roadworks National HighwaysCleared 11 hours 34 minutes ago
M56 Eastbound lanes 1 and 2 closure (MP 15/4 to 14/4)
M56 Eastbound lanes 1 and 2 closure (MP 15/4 to 14/4)
Cleared Roadworks National HighwaysCleared 16 hours 19 minutes ago
M56 Eastbound lanes 1 and 2 closure (MP 15/4 to 14/4)