M55 Westbound Jct 3 to 2 Lane 3/2 closure (Mp 23/4 - 23/1)
ClearedM55 Westbound Jct 3 to 2 Lane 3/2 closure (Mp 23/4 - 23/1)
- Start time
- Tue, Jul 28, 2026 7:00 PM
- Expected end
- Wed, Jul 29, 2026 5:00 AM
- Duration
- 5 hours 2 seconds
- Road
- M55 – M55 Westbound Between J1 And J2
- Category
- Construction Work
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 28, 2026 6:42 PM
- Last updated
- Tue, Jul 28, 2026 11:26 PM
- Cleared
- Wed, Jul 29, 2026 12:00 AM
- Latest update: M55 Westbound Jct 3 to 2 Lane 3/2 closure (Mp 23/4 - 23/1)
- Coordinates
- 53.798784, -2.731735
- Latitude span
- 53.798555 – 53.799092
- Longitude span
- -2.733591 – -2.729214
- Bounding box centre
- 53.798824, -2.731403
- Location descriptions
-
- M55 westbound between J1 and J2
- Feed validity status
- Planned
- Overall feed start
- Tue, Jul 28, 2026 7:00 PM
- Overall feed end
- Wed, Jul 29, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M55 westbound between J1 and J2
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {1EA6711D-7A5C-4B1D-8357-4827AC36EDBF}
- Linear Element Type
- B Carriageway
- From Distance
- 500 m
- To Distance
- 775 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.799092 -2.729214 53.798976 -2.730212 53.798974 -2.730227 53.79884 -2.731287 53.798655 -2.732741 53.798589 -2.733302
Segment 2
2 coordinate pairs- Description
- M55 westbound between J1 and J2
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {266AD22C-4AC0-4EF1-B56A-B9D3155C82BD}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 19 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.798589 -2.733302 53.798555 -2.733591
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -2.729214, 53.799092
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.729214,
53.799092
],
[
-2.730212,
53.798976
],
[
-2.730227,
53.798974
],
[
-2.731287,
53.79884
],
[
-2.732741,
53.798655
],
[
-2.733302,
53.798589
],
[
-2.733302,
53.798589
],
[
-2.733591,
53.798555
]
]
]
}
View road section coordinates
[
[
[
-2.729214,
53.799092
],
[
-2.730212,
53.798976
],
[
-2.730227,
53.798974
],
[
-2.731287,
53.79884
],
[
-2.732741,
53.798655
],
[
-2.733302,
53.798589
],
[
-2.733302,
53.798589
],
[
-2.733591,
53.798555
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jul 28, 2026 6:42 PM
- Record versioned
- Tue, Jul 28, 2026 11:26 PM
- Coordinate source
- Geometry
Driving on the M55? See every live closure, roadwork and planned restriction on this road.
M55 live closuresRelated incidents
M6 Southbound Jct 32 to 31 Lane 3 closure (357/3B to 354/2B)
Planned Roadworks National HighwaysStarts in 4 hours 1 minute
M6 Southbound Jct 32 to 31 Lane 3 closure (357/3B to 354/2B)
M55 Eastbound Jct 2 to 3 Lane 3/2 closure (Mp 16/5 - 18/3)
Planned Roadworks National HighwaysStarts in 2 hours 31 minutes
M55 Eastbound Jct 2 to 3 Lane 3/2 closure (Mp 16/5 - 18/3)
M6 Southbound Jct 31 Lane 4, 3 and 2 closure (push to exit slip road) switching to lane 1/2 closure (Mp 351/5 to 350/1)
Cleared Roadworks National HighwaysCleared 1 day 12 hours ago
M6 Southbound Jct 31 Lane 4, 3 and 2 closure (push to exit slip road) switching to lane 1/2 closure (Mp 351/5 to 350/1)
M6 Southbound Jct 32 to 31 Lane 3 closure (357/3B to 354/2B)
Cleared Roadworks National HighwaysCleared 2 days 11 hours ago
M6 Southbound Jct 32 to 31 Lane 3 closure (357/3B to 354/2B)
M55 Westbound Jct 2 to 3 Lane 3/2 closure (Mp 19/6 - 18/7)
Cleared Roadworks National HighwaysCleared 3 days 11 hours ago
M55 Westbound Jct 2 to 3 Lane 3/2 closure (Mp 19/6 - 18/7)
M55 Westbound Jct 2 to 3 Lane 3/2 closure (Mp 19/6 - 18/7)
Cleared Roadworks National HighwaysCleared 4 days 21 hours ago
M55 Westbound Jct 2 to 3 Lane 3/2 closure (Mp 19/6 - 18/7)