M5 southbound Jct 3 to Jct 4a carriageway closure
PlannedM5 southbound Jct 3 to Jct 4a carriageway closure
- Start time
- Thu, Oct 15, 2026 8:00 PM
- Expected end
- Fri, Oct 16, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M5 – M5 Southbound At The Frankley Services Between J3 And J4 Exit
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Oct 14, 2026 7:43 PM
- Last updated
- Thu, Oct 15, 2026 1:15 AM
- Cleared
- Fri, Oct 16, 2026 5:00 AM
- Latest update: M5 southbound Jct 3 to Jct 4a carriageway closure
- Coordinates
- 52.431291, -2.017323
- Latitude span
- 52.430456 – 52.432790
- Longitude span
- -2.017422 – -2.017258
- Bounding box centre
- 52.431623, -2.017340
- Location descriptions
-
- M5 southbound at the Frankley services between J3 and J4 exit
- M5 southbound between J3 and J4
- Feed validity status
- Planned
- Overall feed start
- Thu, Oct 15, 2026 8:00 PM
- Overall feed end
- Fri, Oct 16, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M5 southbound at the Frankley services between J3 and J4 exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {D0568229-BD18-15EB-5710-AEF3A74B938D}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 35 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.430772 -2.017289 52.430743 -2.017287 52.430613 -2.017279 52.430492 -2.017264 52.430456 -2.017258
Segment 2
6 coordinate pairs- Description
- M5 southbound at the Frankley services between J3 and J4 exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {18A7B7B9-B5EE-B20A-BD0D-8685EB269B46}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 92 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.431564 -2.017422 52.431499 -2.017297 52.431155 -2.017299 52.430988 -2.017295 52.430838 -2.017293 52.430772 -2.017289
Segment 3
5 coordinate pairs- Description
- M5 southbound between J3 and J4
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {082D27CD-C8FA-4695-ADC8-9020FEC1F0AD}
- Linear Element Type
- A Carriageway
- From Distance
- 3 m
- To Distance
- 140 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.43279 -2.017354 52.432392 -2.01736 52.432131 -2.017364 52.431879 -2.017393 52.431564 -2.017422
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- -2.017289, 52.430772
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.017289,
52.430772
],
[
-2.017287,
52.430743
],
[
-2.017279,
52.430613
],
[
-2.017264,
52.430492
],
[
-2.017258,
52.430456
],
[
-2.017422,
52.431564
],
[
-2.017297,
52.431499
],
[
-2.017299,
52.431155
],
[
-2.017295,
52.430988
],
[
-2.017293,
52.430838
],
[
-2.017289,
52.430772
],
[
-2.017354,
52.43279
],
[
-2.01736,
52.432392
],
[
-2.017364,
52.432131
],
[
-2.017393,
52.431879
],
[
-2.017422,
52.431564
]
]
]
}
View road section coordinates
[
[
[
-2.017289,
52.430772
],
[
-2.017287,
52.430743
],
[
-2.017279,
52.430613
],
[
-2.017264,
52.430492
],
[
-2.017258,
52.430456
],
[
-2.017422,
52.431564
],
[
-2.017297,
52.431499
],
[
-2.017299,
52.431155
],
[
-2.017295,
52.430988
],
[
-2.017293,
52.430838
],
[
-2.017289,
52.430772
],
[
-2.017354,
52.43279
],
[
-2.01736,
52.432392
],
[
-2.017364,
52.432131
],
[
-2.017393,
52.431879
],
[
-2.017422,
52.431564
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Wed, Oct 14, 2026 7:43 PM
- Record versioned
- Thu, Oct 15, 2026 1:15 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 westbound Jct 18 Avonmouth Spur lane closure
Active Roadworks National HighwaysExpected to clear in 2 hours 40 minutes
M5 westbound Jct 18 Avonmouth Spur lane closure
M5 northbound Jct 10 to 9 - hardshoulder closure (78/2 to 76/6)
Active Roadworks National HighwaysExpected to clear in 2 months 4 days
M5 northbound Jct 10 to 9 - hardshoulder closure (78/2 to 76/6)
M5 both directions Jct 24 to Jct 23 - lane closure for for structure
Planned Roadworks National HighwaysStarts in 17 hours 40 minutes
M5 both directions Jct 24 to Jct 23 - lane closure for for structure
M5 northbound Jct 24 to 23 - carriageway closed
Planned Roadworks National HighwaysStarts in 17 hours 40 minutes
M5 northbound Jct 24 to 23 - carriageway closed
M5 Northbound Jct 31 to 30 lane 1, 2 closure 259/6b - 256/8b
Planned Roadworks National HighwaysStarts in 16 hours 40 minutes
M5 Northbound Jct 31 to 30 lane 1, 2 closure 259/6b - 256/8b
M5 northbound Jct 21 to Jct 20 lane closure 158/4-156/0
Planned Roadworks National HighwaysStarts in 16 hours 40 minutes
M5 northbound Jct 21 to Jct 20 lane closure 158/4-156/0