M5 southbound Jct 26 to 29 Mobile hard shoulder closure 219/8-239/0
ClearedM5 southbound Jct 26 to 29 Mobile hard shoulder closure 219/8-239/0
- Start time
- Tue, Oct 6, 2026 7:00 PM
- Expected end
- Wed, Oct 7, 2026 5:00 AM
- Duration
- 9 hours 55 minutes 2 seconds
- Road
- M5 – M5 Southbound Within J27
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 21, 2026 8:38 AM
- Last updated
- Wed, Oct 7, 2026 4:27 AM
- Cleared
- Wed, Oct 7, 2026 4:55 AM
- Latest update: M5 southbound Jct 26 to 29 Mobile hard shoulder closure 219/8-239/0
- Coordinates
- 50.921550, -3.350795
- Latitude span
- 50.920979 – 50.921877
- Longitude span
- -3.351650 – -3.350299
- Bounding box centre
- 50.921428, -3.350975
- Location descriptions
-
- M5 southbound within J27
- M5 southbound between J26 and J27
- Feed validity status
- Planned
- Overall feed start
- Tue, Oct 6, 2026 7:00 PM
- Overall feed end
- Wed, Oct 7, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M5 southbound within J27
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {BD248ECB-5051-4145-9423-2A6BF6E93E3D}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 90 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.921571 -3.350765 50.920979 -3.35165
Segment 2
3 coordinate pairs- Description
- M5 southbound between J26 and J27
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {1FBF780C-470D-4C2D-9BAB-7891691A0953}
- Linear Element Type
- A Carriageway
- From Distance
- 679 m
- To Distance
- 727 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.921877 -3.350299 50.921752 -3.350498 50.921571 -3.350765
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -3.350765, 50.921571
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-3.350765,
50.921571
],
[
-3.35165,
50.920979
],
[
-3.350299,
50.921877
],
[
-3.350498,
50.921752
],
[
-3.350765,
50.921571
]
]
]
}
View road section coordinates
[
[
[
-3.350765,
50.921571
],
[
-3.35165,
50.920979
],
[
-3.350299,
50.921877
],
[
-3.350498,
50.921752
],
[
-3.350765,
50.921571
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Sep 21, 2026 8:38 AM
- Record versioned
- Wed, Oct 7, 2026 4:27 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 northbound Jct 20 to Jct 19 lane closure 155/8-152/8
Planned Roadworks National HighwaysExpected to clear in 9 hours 46 minutes
M5 northbound Jct 20 to Jct 19 lane closure 155/8-152/8
M5 Northbound Jct 31 to 30 - 24hr hardshoulder closure 258/7b - 257/0b
Planned Roadworks National HighwaysExpected to clear in 2 weeks 46 minutes
M5 Northbound Jct 31 to 30 - 24hr hardshoulder closure 258/7b - 257/0b
M5 northbound Jct 10 entry slip road closed
Planned Roadworks National HighwaysStarts in 46 minutes 46 seconds
M5 northbound Jct 10 entry slip road closed
M5 Northbound Jct 19 to Jct 18 lane closure 144/1-141/9
Planned Roadworks National HighwaysStarts in 46 minutes 46 seconds
M5 Northbound Jct 19 to Jct 18 lane closure 144/1-141/9
M5 northbound Western Arm northbound to M6 link road closure
Planned Roadworks National HighwaysStarts in 46 minutes 46 seconds
M5 northbound Western Arm northbound to M6 link road closure
M5 both directions Jct 24 to Jct 23 - lane closure for for structure
Planned Roadworks National HighwaysStarts in 46 minutes 46 seconds
M5 both directions Jct 24 to Jct 23 - lane closure for for structure